期刊文献+
共找到12篇文章
< 1 >
每页显示 20 50 100
Siltation Prediction for Navigation Channels and Harbour Basins on Muddy Beach 被引量:2
1
作者 Liu Jiaju Zhang Jingchao Prof. Senior Engineer, River and Harbour Department, Nanjing Hydraulic Research Institute, Nanjing Senior Engineer, River and Harbour Department, Nanjing Hydralulic Research Institute, Nanjing 《China Ocean Engineering》 SCIE EI 1992年第2期157-172,共16页
This paper, after briefly reviewing the experimental research on sediment transport on muddy beach since the 1950s, improves and perfects the method for forecasting siltation in navigation channels and harbour basins ... This paper, after briefly reviewing the experimental research on sediment transport on muddy beach since the 1950s, improves and perfects the method for forecasting siltation in navigation channels and harbour basins which was first put forward in China by the authors. In consideration of silty sediment and sand, some factors in forecasting methods have been changed and modified. Consequently, the modified methods can be used either to compute siltation in navigation channels and harbour basins on muddy beach or to compute siltation and scouring in navigation channels and harbour basins on both silty beach and sandy beach. The verification of field data from eleven large, medium and small natural harbours shows a good agreement between the forecasting by the modified method and the natural conditions. Finally, the paper deals with the rational utilization of water area after the construction of the West Dyke in Lianyungang, the maintenance of water depth of the navigation channel at the entrance, siltation distribution, siltation in the navigation channel and harbour basin for ships of 100 thousand tonnnage. Results once again prove that the prospect of constructing Lianyungang Harbour into a deepwater harbour is bright. 展开更多
关键词 navigation channel harbour basin sediment concentration muddy beach sandy beach sedimentation prediction settling velocity flocculated granule
下载PDF
Mechanism of back siltation in navigation channel in Dinh An Estuary, Vietnam 被引量:2
2
作者 Viet-Thanh NGUYEN Jin-hai ZHENG Ji-sheng ZHANG 《Water Science and Engineering》 EI CAS CSCD 2013年第2期178-188,共11页
The Dinh An Estuary is one of the Nine Dragon estuaries of the Mekong River. An international navigation channel was built in the estuary for vessels traveling from the South China Sea to the southwestern area of Viet... The Dinh An Estuary is one of the Nine Dragon estuaries of the Mekong River. An international navigation channel was built in the estuary for vessels traveling from the South China Sea to the southwestern area of Vietnam and then to Phnom Penh, Cambodia. The morphological evolution of the navigation channel is complicated and unstable. The back siltation intensity in the navigation channel has largely increased and been concentrated in the curvature segments of the channel since 1980. In this study, based on simulation results and measured data, five key factors that influence the back siltation in the navigation channel were systematically analyzed. These factors included the increasing elevation gap between the channel and the nearby seabed, the disadvantageous hydrodynamic conditions, sediment transport, mixing of saltwater and freshwater, and wave effects in the navigation channel. It is shown that the back siltation to a large extent results from the low current velocity of the secondary ocean circulation, which often occurs in the curvature segments of the channel. Suspended sediment also settles in the channel due to the decrease of the current velocity and the sediment transport capacity when flow passes through the channel. The changes of hydrodynamic conditions are responsible for the majority of the severe siltation in the curvature segments of the navigation channel. 展开更多
关键词 back siltation hydrodynamics navigation channel sediment transport Dinh An Estuary
下载PDF
Morphodynamic Characteristics and Medium-Term Simulation of the North-South Passage Under the Impact of the Yangtze Estuary Deepwater Navigation Channel Project 被引量:1
3
作者 JIAO Jian DOU Xi-ping +2 位作者 GAO Xiang-yu DING Lei YANG Xiao-yu 《China Ocean Engineering》 SCIE EI CSCD 2020年第2期198-209,共12页
The morphological evolution characteristics of the North-South Passage area since the construction of the Yangtze Estuary Deepwater Navigation Channel Project(DNCP)are analyzed on the basis of the measured data.A twod... The morphological evolution characteristics of the North-South Passage area since the construction of the Yangtze Estuary Deepwater Navigation Channel Project(DNCP)are analyzed on the basis of the measured data.A twodimensional morphodynamics numerical model of the Yangtze Estuary is established to verify the morphological evolution of the North-South Passage under the influence of the DNCP and to predict the future evolution in the next 40 years.Data analysis shows that the North Passage has experienced rapid adjustment stages and adaptive stages after the construction of the DNCP.Slow erosion occurred along the main channel,and slow siltation could be observed in the area between the groins.The South Passage showed a state of upper section erosion and down section deposition.At present,the whole South Passage is in a slight erosion state.According to the numerical model,the eroding and silting speed of the North Passage will slow down in the future.The present state that erosion occurs in the main channel and siltation occurs between the groins will continue.The South Passage will still maintain upper section erosion and down section deposition in the future.Due to the main channel erosion of the North Passage and siltation of the South Passage,the sediment division ratio of the North Passage will increase in the future but still be smaller than 50%.After morphological evolution of 40 years,the direction of residual sediment transport caused by M2 and M4 tidal components in the North Passage has not changed,but the transport rate will decrease.It is considered that the morphological evolution of the North-South Passage could reach a relatively stable state after 40 years. 展开更多
关键词 Yangtze Estuary numerical model morphology tidal current sediment transport deepwater navigation channel project(DNCP)
下载PDF
Study of Wave and Tide Influence on Slope Stability of the Navigation Channel of Tianjin Port
4
作者 李飒 Lars GRANDE +2 位作者 赵智邦 刘国辉 杨进良 《China Ocean Engineering》 SCIE EI 2007年第4期689-700,共12页
The Tianjin Port is the largest man-made port in China. Since the navigation channel of the Tianjin Port is constructed by dredging, a very important problem, as many people concerned, is the submarine slope stability... The Tianjin Port is the largest man-made port in China. Since the navigation channel of the Tianjin Port is constructed by dredging, a very important problem, as many people concerned, is the submarine slope stability. As the environment on land is different from that in submarine, it is necessary to evaluate the influence of the environmental loading, such as wave and tide, on the stability of navigation channel slope. In the present study, based on the observed results, the characteristics of the navigation channel slope are summarized, and the causes of creating the special slope shape are analyzed. The ioles of waves and tides are evaluated, and failure mechanics are discussed to helq us predict what will happen in the future. 展开更多
关键词 SUBMARINE WAVE TIDE slope stability navigation channel
下载PDF
Regulation of Navigation Channel on Mouth Bar of Guanhe Estuary
5
作者 Li Guochen Associate Professor, Hohai University, Nanjing 210024 《China Ocean Engineering》 SCIE EI 1994年第3期355-364,共10页
-Based on the feasibility study of developing the navigation resources of the Guanhe River and the model test results of the mouth bar regulation, this paper presents some basic principles for the regulation of the ch... -Based on the feasibility study of developing the navigation resources of the Guanhe River and the model test results of the mouth bar regulation, this paper presents some basic principles for the regulation of the channel on the mouth bar, for instance, the direction of navigation channel should be identical with that of the ebb tide current and the main waves, and perpendicular to the bathymetric contours. The principles for regulating mouth bars are also discussed in this paper. 展开更多
关键词 regulatiton navigation channel mouth bar ESTUARY alignment of channel
下载PDF
Siltation Prediction for Navigation Channels and Harbour Basins on Muddy Beach (II)
6
作者 Liu Jiaju and Zhang Jingchao Professor, Senior Engineer, Nanjing Hydraulic Research Institute, 210029 Nanjing Senior Engineer, Nanjing Hydraulic Research Institute, 210029 Nanjing 《China Ocean Engineering》 SCIE EI 1992年第3期297-316,共20页
5. Application and Popularization of Computational Methods for Siltation The above mentioned computational method covers siltation in navigation channels andharbour basins on muddy beach. This part mainly deals with t... 5. Application and Popularization of Computational Methods for Siltation The above mentioned computational method covers siltation in navigation channels andharbour basins on muddy beach. This part mainly deals with the possibility of its application tosilty beach and sandy beach and the computation of scouring. The following discussion involvestwo aspects, and then some computational examples are given. 展开更多
关键词 Siltation Prediction for navigation channels and Harbour Basins on Muddy Beach II
下载PDF
Comprehensive analysis on the sediment siltation in the upper reach of the deepwater navigation channel in the Yangtze Estuary 被引量:6
7
作者 匡翠萍 陈维 +1 位作者 顾杰 贺露露 《Journal of Hydrodynamics》 SCIE EI CSCD 2014年第2期299-308,共10页
The results from both the field measurements and numerical simulation were reported to comprehensively analyze the sediment siltation in the upper reach of the Deepwater Navigation Channel Project in the Yangtze Estua... The results from both the field measurements and numerical simulation were reported to comprehensively analyze the sediment siltation in the upper reach of the Deepwater Navigation Channel Project in the Yangtze Estuary after the project has been implemented. In this research, firstly some basic information about the river evolution in the Yangtze Estuary is analyzed, including the variations of water depths in the Hengsha Passage and the inlet cross-sections of the North Passage and the South Passage, and changes of diversion ratios of ebb flow and sediment flux in the North Passage and the South Passage, Then the Delfl3D-FLOW model is applied to simulate the hydrodynamics and sediment transport in the Yangtze Estuary. This model has been calibrated and the simulated results agree well with the measured data of the tidal levels, flow velocities and suspended sediment concentration (SSC), indicating that the model can well simulate the hydrodynamics and sediment transport of the Yangtze Estuary caused by the Deepwater Navigation Channel Project. The research results show that the development of the Hengsha Passage and decrease of diversion ratio of ebb flow and sediment flux in the North Passage are the main reasons of sediment siltation in the upper reach of the Deepwater Navigation Channel in the Yangtze Estuary. 展开更多
关键词 Yangtze Estuary Hengsha Passage deepwater navigation channel numerical simulation sediment siltation
原文传递
Exploration of the Mechanisms for the Low Sensitivity of Deposition Flux to Upstream Sediment Reduction in the North Passage, Yangtze Estuary
8
作者 WANG Xiao-guang ZHANG Wei +4 位作者 TONG Chao-feng LEI Zhi-yi QIN Jie JI Xiao-mei HUANG Rui 《China Ocean Engineering》 SCIE EI CSCD 2023年第4期533-546,共14页
Deltas are densely populated industrialized regions,and home to important ports and navigation channels.Due to human interferences,the Yangtze Estuary has experienced a significant reduction in sediment load caused by... Deltas are densely populated industrialized regions,and home to important ports and navigation channels.Due to human interferences,the Yangtze Estuary has experienced a significant reduction in sediment load caused by the Three Gorges Dam(TGD),as well as adjustment to local morphodynamics by the Deep-water Navigation Channel(DNC).While the dramatic reduction in sediment triggers the increased channel erosion,the deposition flux of the DNC located at the estuary mouth has little change.To explore the physical mechanism of this phenomenon,a two-dimensional model is used to establish the relationship between sediment load and the sediment budget of channels based on the bathymetry in 2016.Model results show that the tidal reach and the inner estuary have a negative sediment budget.And the seasonal characteristics of water and sediment fluxes become less obvious downstream.Sensitivity analysis shows that the influence of upstream sediment load on deposition flux decreases along the channel,with a transition from deposition to erosion occurring in the tidal reach.For the last-level bifurcation,the annual siltation of sediment in the North Passage(NP)decreases by 4.5%with low sensitivity.This is attributed to the reduction of sediment load partially mitigated by riverbed erosion and cascade bifurcations.In addition,the lateral sediment supply,which accounts for 68%of the sediment input in the NP,is stable.Overall,this study strengthens the understanding of the relationship between sediment load and artificially deepened systems,thus allowing for better management of estuarine sediment and navigation channel. 展开更多
关键词 DELTA navigation channel sediment load erosion and deposition sediment budget Yangtze Estuary
下载PDF
The New “Waterways and Sea Canals” Strategy in the “Continent of Asia” and Its Implications on the Global Map
9
作者 Walid Nabil 《Journal of Geoscience and Environment Protection》 2023年第4期15-29,共15页
This paper reviews a strategic scientific proposal to dig and construct three navigable sea lanes linking isolated inland seas and blocked side bays and linking it with the open seas, to facilitate the movement of fre... This paper reviews a strategic scientific proposal to dig and construct three navigable sea lanes linking isolated inland seas and blocked side bays and linking it with the open seas, to facilitate the movement of free trade and international navigation, and to break the captivity of geographically isolated environments, and to give a strategic advantage to some areas and sectors that are neglected politically, socially, economically and environmentally, and to adopt the strategy of establishing a marine channel between the “Caspian Sea” and the “Black Sea” through the “lands belonging to Russia”. On digging a navigational canal at the lowest cost in a plain area within the territory of Russia, with a length of approximately 600 kilometers (616 km), starting from the nearest bay in the Caspian Sea, passing near the city of “Pyatigorsk” to the city of “Sochi” on the Black Sea, while it comes: -The strategy of the waterway and the sea channel between the “Caspian Sea” and the “Arabian Gulf” through the “lands belonging to Iran” by digging and cutting a path in the rocks with a width of 100 meters and a length of about 700 kilometers, and at a time rate of less than 10 years, and this project will liberate all countries in the Caspian Sea, and the study concludes with the strategy of the navigational channel between the “Arabian Gulf” and the “Mediterranean Sea” through the two countries of “Iraq-Syria”, with a length of about 1350 km, and the world will benefit in the security, commercial and political fields. 展开更多
关键词 navigational Corridor A New navigational channel Modern Geopolitical Science Maritime Transport Strategy Formatting Style Styling Insert
下载PDF
Responses of river bed evolution to flow-sediment process changes after Three Gorges Project in middle Yangtze River:A case study of Yaojian reach 被引量:4
10
作者 Li-qin Zuo Yong-jun Lu +2 位作者 Huai-xiang Liu Fang-fang Ren Yuan-yuan Sun 《Water Science and Engineering》 EI CAS CSCD 2020年第2期124-135,共12页
The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the s... The Three Gorges Project(TGP)has changed the flow-sediment process in the middle Yangtze River.For navigation purposes,there is an urgent need to study the changes of the river regime over a long-term period and the shoal-channel evolution over different seasons since the completion of the TGP.Based on analysis of the measured data and the results of a two-dimensional mathematical model,the changes of the river regime and river bed evolution in the Yaojian reach downstream of the TGP were studied.Results show that a high sediment transport flux helps to keep the main flow in the North Branch,while a low sediment transport flux helps to keep the main flow in the South Branch.Thus,the main branch will not change in the near future because of the low sediment transport load.In this study,the flow-sediment process adjusted by the TGP was restored to the conditions before the TGP,and the river bed evolution under the adjusted and non-adjusted flow-sediment conditions was calculated.After the completion of the TGP,the reservoir storage accelerated the flood recession process and decreased the erosion by 11.9%under the flow-sediment conditions in 2010,and the deposition in the flood season decreased by 56.4%. 展开更多
关键词 River regime River bed evolution Flow-sediment process Three Gorges Project Yaojian reach Middle Yangtze River navigation channel
下载PDF
Investigation on the Deposition in an Excavated Trough at the East Shore of Jiaozhou Bay, China 被引量:2
11
作者 Zhang Jinshan Yu Guohua Research Engineer, River and Harbour Department, Nanjing Hydraulic Research Institute, Nanjing 210024 Research Senior Engineer, River and Harbour Department, Nanjing Hydraulic Research Institute, Nanjing 210024 《China Ocean Engineering》 SCIE EI 1995年第3期311-324,共14页
Based on field investigations, this paper analyzes three types of harbour basinns and navigation channel excavated on seabed in Jiaozhou Bay, get a general rule of deposition for excavated trough, it found that pollut... Based on field investigations, this paper analyzes three types of harbour basinns and navigation channel excavated on seabed in Jiaozhou Bay, get a general rule of deposition for excavated trough, it found that pollution is one of crucial factors resulting in the deposition of the excavated trough in the east shore of Jiaozhou Bay. With these results, it predicted the annual deposition thickness for the excavated trough and disclosed the fact that it can't be deposited deadly during one storm. At the same time, with two-dimensional numerical model, it studied the effects of the excavated trough and the reclamation near shore on tidal cureent and said that the excavated trough can decrease the current velocity passing through the trough about 10- 15%, but only limited inside and near the trough and there are no effect on other regions; reclamation can cut off the pollution sources and no obvious effect on the currents of the Jiaozhou Bay. Connecting the deep trough and Cangkou tidal channel with a new excavated trough can improve the current conditions on the deep trough in some degree, but not great. 展开更多
关键词 Jiaozhou Bay harbour basin navigation channel excavated trough sediment concentration muddy beach DEPOSITION tidal current numerical model.
下载PDF
Dispersal and Fate of Dredged Materials Disposed of in the Changjiang Estuary Determined by Use of An in Situ Rare Earth Element Tracer
12
作者 刘高峰 吴华林 +2 位作者 郭文华 朱建荣 孙连成 《China Ocean Engineering》 SCIE EI 2011年第3期495-506,共12页
To investigate the dispersal pattern and the fate of dredged materials disposed at a pre-selected disposal site, a field tracer experiment was conducted in the North Passage of the Changjiang Estuary during the 2005 f... To investigate the dispersal pattern and the fate of dredged materials disposed at a pre-selected disposal site, a field tracer experiment was conducted in the North Passage of the Changjiang Estuary during the 2005 flood season. Three tons of dredged materials were mixed with 2.792 kg of sodium hexachloroiridate (IV) hexahydrate (SHH), which contained the rare earth element tracer iridum (Ir). Sampling was conducted at pre-selected sections of the estuary on the second, third and fourth day after the release of dredged materials. All samples were evaluated by use of neutron activation analysis. The majority of the dredged material was dispersed nearly parallel to the navigation channel and deposited between the channel and the south dike. Only a small quantity of dredged materials entered or crossed the navigation channel, and the back silting ratio in the navigation channel was about 5%. The dredged materials also dispersed southeasterly beyond two dike heads. 展开更多
关键词 dredged material tracer sediment transport Neutron activation analysis deepwater navigation channel of the Changjiang Estuary
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部