Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.Th...Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.The inherent laws reflected by the historical data of the distribution network are ignored,which affects the objectivity of the planning scheme.In this study,to improve the efficiency and accuracy of distribution network planning,the characteristics of distribution network data were extracted using a data-mining technique,and correlation knowledge of existing problems in the network was obtained.A data-mining model based on correlation rules was established.The inputs of the model were the electrical characteristic indices screened using the gray correlation method.The Apriori algorithm was used to extract correlation knowledge from the operational data of the distribution network and obtain strong correlation rules.Degree of promotion and chi-square tests were used to verify the rationality of the strong correlation rules of the model output.In this study,the correlation relationship between heavy load or overload problems of distribution network feeders in different regions and related characteristic indices was determined,and the confidence of the correlation rules was obtained.These results can provide an effective basis for the formulation of a distribution network planning scheme.展开更多
The railway 5G-R network is ready for the engineering construction.In order to provide technical reserve for the preliminary engineering stage,it is necessary to study the characteristics of 5G-R network and network p...The railway 5G-R network is ready for the engineering construction.In order to provide technical reserve for the preliminary engineering stage,it is necessary to study the characteristics of 5G-R network and network planning technology in advance.The 5G-R network,different from the operators'5G network,is mainly available for railway staff and covers the railway line.It is upgraded based on the previous generation of railway communication system-GSM-R technology.By comprehensively summarizing and reviewing the characteristics of 5G-R system architecture,network coverage,networking technology,business characteristics,equipment redundancy,network performance,etc.,we study the network planning technology with 5G-R characteristics based on the above characteristics,including frequency,coverage,capacity,parameters,indoor distribution,switching and other key technologies.On this basis,this paper puts forward 5G-R network planning suggestion,which can provide technical support for subsequent project deployment.展开更多
The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rol...The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...展开更多
In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two...In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.展开更多
Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependenc...Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.展开更多
Making use of Microsoft Visual Studio. NET platform, hierarchical network planning is realized in working procedure time-optimization of the construction by TBM, and hierarchical network graph of the construction by T...Making use of Microsoft Visual Studio. NET platform, hierarchical network planning is realized in working procedure time-optimization of the construction by TBM, and hierarchical network graph of the construction by TBM is drawn based on browser. Then the theory of system realization is discussed, six components of system that can be reused are explained emphatically. The realization of hierarchical network panning in Internet provides available guarantee for controlling rate of progress in large-scale or middle-sized projects. Key words Web - network graph - hierarchical network planning CLC number TU721 Biography: WU Shi-jing (1963-), male, Professor, research direction: equipments management engineering, mechatronics, state monitoring and malfunction diagnostics of machine and electronics equipments.展开更多
The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,...The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.展开更多
In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In thi...In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.展开更多
The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for ...The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.展开更多
This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we pr...This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.展开更多
This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the ...This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the heterogeneity of the charging behavior in a data-driven manner.To cope with the deficiencies from a small size and sparse behavioral data,we propose a robust charging demand prediction method that can significantly reduce the impact of sample errors and missing data.On the basis of these two building blocks,we form and solve a new optimal charging station location and capacity problem by minimizing the construction and charging costs while considering the charging service level,construction budget,and limit to the number of chargers.We use a case study of planning charging stations in Shanghai to validate our contributions and provide managerial insight in this area.展开更多
In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configura...In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.展开更多
This study examines the interrelatedness between the hierarchical structure of China's urban system and high-speed railway (HSR) network planning at the national level. As a multi-layered system, the Chinese HSR ca...This study examines the interrelatedness between the hierarchical structure of China's urban system and high-speed railway (HSR) network planning at the national level. As a multi-layered system, the Chinese HSR can be categorized into three sub-networks, namely, the national HSR trunk network, the national HSR extensional network, and the intercity HSR network. By examining the direct HSR network connection, HSR noda( connection, and HSR operational frequency of 287 prefecture-level cities, this study demonstrates that the hierarchies of China's administrative, demographic, and economic urban systems strongly influence HSR network planning. The national HSR trunk network prioritizes the connection of top-level central cities, whereas the extensional network prioritizes cities at the (ower level of the urban system. Moreover, the national HSR system forms the backbone of the HSR network structure based on a national scale, whereas the intercity HSR system satisfies the travel needs within urban agglomerations based on the regional level.展开更多
In order to improve robustness and efficiency of the radio frequency identification(RFID)network,a random mating mayfly algorithm(RMMA)was proposed.Firstly,RMMA introduced the mechanism of random mating into the mayfl...In order to improve robustness and efficiency of the radio frequency identification(RFID)network,a random mating mayfly algorithm(RMMA)was proposed.Firstly,RMMA introduced the mechanism of random mating into the mayfly algorithm(MA),which improved the population diversity and enhanced the exploration ability of the algorithm in the early stage,and find a better solution to the RFID nework planning(RNP)problem.Secondly,in RNP,tags are usually placed near the boundaries of the working space,so the minimum boundary mutation strategy was proposed to make sure the mayflies which beyond the boundary can keep the original search direction,as to enhance the ability of searching near the boundary.Lastly,in order to measure the performance of RMMA,the algorithm is then benchmarked on three well-known classic test functions,and the results are verified by a comparative study with particle swarm optimization(PSO),grey wolf optimization(GWO),and MA.The results show that the RMMA algorithm is able to provide very competitive results compared to these well-known meta-heuristics,RMMA is also applied to solve RNP problems.The performance evaluation shows that RMMA achieves higher coverage than the other three algorithms.When the number of readers is the same,RMMA can obtain lower interference and get a better load balance in each instance compared with other algorithms.RMMA can also solve RNP problem stably and efficiently when the number and position of tags change over time.展开更多
In order to improve the service quality of radio frequency identification(RFID) systems, multiple objectives should be comprehensively considered. An improved brain storm optimization algorithm GABSO, which incorporat...In order to improve the service quality of radio frequency identification(RFID) systems, multiple objectives should be comprehensively considered. An improved brain storm optimization algorithm GABSO, which incorporated adaptive learning operator and golden sine operator into the original brain storm optimization(BSO) algorithm, was proposed to solve the problem of RFID network planning(RNP). GABSO algorithm introduces learning operator and golden sine operator to achieve a balance between exploration and development. Based on GABSO algorithm, an optimization model is established to optimize the position of the reader. The GABSO algorithm was tested on the RFID model and dataset, and was compared with other methods. The GABSO algorithm’s tag coverage was increased by 9.62% over the Cuckoo search(CS) algorithm, and 7.70% over BSO. The results show that the GABSO algorithm could be successfully applied to solve the problem of RNP.展开更多
The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the...The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the synthetically uncertainties of the time limit caused by Fuzzy, random and indeterminate known factors by the connection number for a large\|scale project. The results illustrate that the new network planning and controlling method based on the connection number a+bi can provide more useful information such as primary critical paths, secondary critical paths and third critical paths etc. The new method is mroe flexible than the traditional method, and is more suitable to the practical application of project.展开更多
The first and foremost task of communication network planning is macro forecasting to theservice volume ,and the quality of planning ultimately depends upon the accuracy of forecasting. Theconventional methods usuall...The first and foremost task of communication network planning is macro forecasting to theservice volume ,and the quality of planning ultimately depends upon the accuracy of forecasting. Theconventional methods usually as forecasting model are increase rate method, time sequence extensionmethod, regression correlation analysis method. However, nowadays in market economy drvelopingstage ,to meet the vigorous demand, communication servtice business, particularly the telecommunicationservice is drveloping rapidly such that forcasting by the conventional method fails achieve the goalfavourably. Thus we should emancipate our mind thinking deeply into the communication conoiationand the method of forecasting. To this end ,the author exploited the laiter ,introducing GM(1, 1) modelas forcastzng means. Comparint with the forecasting results from several other niodels the GM(1.1)has better reliability. Is has been put into practice in many urban telecomrnunication network planning. Allresults obtatned are desirable.展开更多
In this paper,we design a resource management scheme to support stateful applications,which will be prevalent in sixth generation(6G)networks.Different from stateless applications,stateful applications require context...In this paper,we design a resource management scheme to support stateful applications,which will be prevalent in sixth generation(6G)networks.Different from stateless applications,stateful applications require context data while executing computing tasks from user terminals(UTs).Using a multi-tier computing paradigm with servers deployed at the core network,gateways,and base stations to support stateful applications,we aim to optimize long-term resource reservation by jointly minimizing the usage of computing,storage,and communication resources and the cost of reconfiguring resource reservation.The coupling among different resources and the impact of UT mobility create challenges in resource management.To address the challenges,we develop digital twin(DT)empowered network planning with two elements,i.e.,multi-resource reservation and resource reservation reconfiguration.First,DTs are designed for collecting UT status data,based on which UTs are grouped according to their mobility patterns.Second,an algorithm is proposed to customize resource reservation for different groups to satisfy their different resource demands.Last,a Meta-learning-based approach is developed to reconfigure resource reservation for balancing the network resource usage and the reconfiguration cost.Simulation results demonstrate that the proposed DTempowered network planning outperforms benchmark frameworks by using less resources and incurring lower reconfiguration costs.展开更多
For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribu...For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.展开更多
The planning of wireless communication networks in underdeveloped countries is studied for landline telephone, fixed broadband wireless access and PLMN systems via investigation and discussion of the LDC networks' ch...The planning of wireless communication networks in underdeveloped countries is studied for landline telephone, fixed broadband wireless access and PLMN systems via investigation and discussion of the LDC networks' characteristic, technology selection, deployment consideration, network configuring, civil work evaluation and investment estimation. An example is embedded all through providing a general展开更多
基金supported by the Science and Technology Project of China Southern Power Grid(GZHKJXM20210043-080041KK52210002).
文摘Traditional distribution network planning relies on the professional knowledge of planners,especially when analyzing the correlations between the problems existing in the network and the crucial influencing factors.The inherent laws reflected by the historical data of the distribution network are ignored,which affects the objectivity of the planning scheme.In this study,to improve the efficiency and accuracy of distribution network planning,the characteristics of distribution network data were extracted using a data-mining technique,and correlation knowledge of existing problems in the network was obtained.A data-mining model based on correlation rules was established.The inputs of the model were the electrical characteristic indices screened using the gray correlation method.The Apriori algorithm was used to extract correlation knowledge from the operational data of the distribution network and obtain strong correlation rules.Degree of promotion and chi-square tests were used to verify the rationality of the strong correlation rules of the model output.In this study,the correlation relationship between heavy load or overload problems of distribution network feeders in different regions and related characteristic indices was determined,and the confidence of the correlation rules was obtained.These results can provide an effective basis for the formulation of a distribution network planning scheme.
文摘The railway 5G-R network is ready for the engineering construction.In order to provide technical reserve for the preliminary engineering stage,it is necessary to study the characteristics of 5G-R network and network planning technology in advance.The 5G-R network,different from the operators'5G network,is mainly available for railway staff and covers the railway line.It is upgraded based on the previous generation of railway communication system-GSM-R technology.By comprehensively summarizing and reviewing the characteristics of 5G-R system architecture,network coverage,networking technology,business characteristics,equipment redundancy,network performance,etc.,we study the network planning technology with 5G-R characteristics based on the above characteristics,including frequency,coverage,capacity,parameters,indoor distribution,switching and other key technologies.On this basis,this paper puts forward 5G-R network planning suggestion,which can provide technical support for subsequent project deployment.
文摘The importance and complexity of prioritizing construction projects (PCP) in urban road network planning lead to the necessity to develop an aided decision making program (ADMP). Cost benefit ratio model and stage rolled method are chosen as the theoretical foundations of the program, and then benefit model is improved to accord with the actuality of urban traffic in China. Consequently, program flows, module functions and data structures are designed, and particularly an original data structure of road ...
基金Project(2009CB219703) supported by the National Basic Research Program of ChinaProject(2011AA05A117) supported by the National High Technology Research and Development Program of China
文摘In order to form an algorithm for distribution network routing,an automatic routing method of distribution network planning was proposed based on the shortest path.The problem of automatic routing was divided into two steps in the method:the first step was that the shortest paths along streets between substation and load points were found by the basic ant colony algorithm to form a preliminary radial distribution network,and the second step was that the result of the shortest path was used to initialize pheromone concentration and pheromone updating rules to generate globally optimal distribution network.Cases studies show that the proposed method is effective and can meet the planning requirements.It is verified that the proposed method has better solution and utility than planning method based on the ant colony algorithm.
文摘Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect factors, and then takes into account the indeterminate factors effect schedule by using the Monte Carlo simulation technique. The method is flexible enough to deal with effect factors and is coincident with practice. A software has been developed to simplify the model-based calculation, in VisualStudio.NET language. Finally, a case study is included to demonstrate the applicability of the proposed model and comparison is made with some advantages over the existing models.
文摘Making use of Microsoft Visual Studio. NET platform, hierarchical network planning is realized in working procedure time-optimization of the construction by TBM, and hierarchical network graph of the construction by TBM is drawn based on browser. Then the theory of system realization is discussed, six components of system that can be reused are explained emphatically. The realization of hierarchical network panning in Internet provides available guarantee for controlling rate of progress in large-scale or middle-sized projects. Key words Web - network graph - hierarchical network planning CLC number TU721 Biography: WU Shi-jing (1963-), male, Professor, research direction: equipments management engineering, mechatronics, state monitoring and malfunction diagnostics of machine and electronics equipments.
文摘The models, methods and their application experiences of a practical GIS(geographic information system)-based computer decision-making support system of urban power distribution network planning with seven subsystems,termed CNP,are described.In each subsystem there is at least one or one set of practical mathematical methobs.Some new models and mathematical methods have been introduced.In the development of CNP the idea of cognitive system engineering has been insisted on,which claims that human and computer intelligence should be combined together to solve the complex engineering problems cooperatively.Practical applications have shown that not only the optimal plan can be automatically reached with many complicated factors considered, but also the computation,analysis and graphic drawing burden can be released considerably.
基金Supported by Major State Basic Research Program of China ("973" Program,No. 2009CB219700 and No. 2010CB23460)Tianjin Municipal Science and Technology Development Program (No. 09JCZDJC25000)Specialized Research Fund for the Doctoral Program of Higher Education of China (No.20090032110064)
文摘In the traditional power transmission network planning,deterministic analysis methods are widely used.In such methods,all contingencies are deemed to have the same occurrence probability,which is not reasonable.In this paper,risk assessment is introduced to the process of transmission network planning considering the probabilistic characteristics of contingencies.Risk indices are given to determine the weak points of the transmission network based on local information,such as bus risk,line overload risk,contingency severity.The indices are calculated by the optimal cost control method based on risk theory,which can help planners to quickly determine weak points in the planning and find solution to them.For simplification,only line overload violation is considered.Finally,the proposed method is validated by an IEEE-RTS test system and a real power system in China from two aspects.In the first case,the original system is evaluated by the proposed method to find the weak points,and then four planning schemes are established,among which the best scheme is selected.In the second case,four initial planning schemes are established by combining the experiences of planners,and after the evaluation by using the proposed method,the best planning scheme is improved based on the information of weak points in the initial schemes,and the risk of improved scheme is reduced from 42 531.86 MW·h per year to 4 431.26 MW·h per year.
基金This work was fully supported by U Nyi Hla Nge Foundation at Yangon Technological University,Gyogone,Insein PO,11011,Yangon,Myanmar。
文摘The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.
基金supported by National High Technical Research and Development Program of China(863 program)under Grant No.2009AA01A345Fundamental Research Funds for the Central Universities under Grant No.BUPT2009RC0402
文摘This article analyzes the characteristics of PON and WiMAX convergence network planning.Based on user coverage ratio,WiMAX channel allocation,cell radius,carrier-to-noise ratio threshold,and bandwidth constraint,we propose a mixed integer programming model solved by a Branch-Band and Heuristic Search method.Finally,the simulation result is given and analyzed.The planning method based on a mixed integer programming model can save 20 percentage of the overall planning cost,compared with the greedy algorithm.The relationship between the convergence network planning cost and frequency usage is also analyzed.The optimized planning result with the lowest cost can be acquired through the best frequency usage.
基金the National Natural Science Founda-tion of China(Nos.72171175,and 72021102)。
文摘This study addresses a new charging station network planning problem for smart connected electric vehicles.We embed a charging station choice model into a charging network planning model that explicitly considers the heterogeneity of the charging behavior in a data-driven manner.To cope with the deficiencies from a small size and sparse behavioral data,we propose a robust charging demand prediction method that can significantly reduce the impact of sample errors and missing data.On the basis of these two building blocks,we form and solve a new optimal charging station location and capacity problem by minimizing the construction and charging costs while considering the charging service level,construction budget,and limit to the number of chargers.We use a case study of planning charging stations in Shanghai to validate our contributions and provide managerial insight in this area.
文摘In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.
文摘This study examines the interrelatedness between the hierarchical structure of China's urban system and high-speed railway (HSR) network planning at the national level. As a multi-layered system, the Chinese HSR can be categorized into three sub-networks, namely, the national HSR trunk network, the national HSR extensional network, and the intercity HSR network. By examining the direct HSR network connection, HSR noda( connection, and HSR operational frequency of 287 prefecture-level cities, this study demonstrates that the hierarchies of China's administrative, demographic, and economic urban systems strongly influence HSR network planning. The national HSR trunk network prioritizes the connection of top-level central cities, whereas the extensional network prioritizes cities at the (ower level of the urban system. Moreover, the national HSR system forms the backbone of the HSR network structure based on a national scale, whereas the intercity HSR system satisfies the travel needs within urban agglomerations based on the regional level.
基金supported by the National Natural Science Foundation of China(61761004)。
文摘In order to improve robustness and efficiency of the radio frequency identification(RFID)network,a random mating mayfly algorithm(RMMA)was proposed.Firstly,RMMA introduced the mechanism of random mating into the mayfly algorithm(MA),which improved the population diversity and enhanced the exploration ability of the algorithm in the early stage,and find a better solution to the RFID nework planning(RNP)problem.Secondly,in RNP,tags are usually placed near the boundaries of the working space,so the minimum boundary mutation strategy was proposed to make sure the mayflies which beyond the boundary can keep the original search direction,as to enhance the ability of searching near the boundary.Lastly,in order to measure the performance of RMMA,the algorithm is then benchmarked on three well-known classic test functions,and the results are verified by a comparative study with particle swarm optimization(PSO),grey wolf optimization(GWO),and MA.The results show that the RMMA algorithm is able to provide very competitive results compared to these well-known meta-heuristics,RMMA is also applied to solve RNP problems.The performance evaluation shows that RMMA achieves higher coverage than the other three algorithms.When the number of readers is the same,RMMA can obtain lower interference and get a better load balance in each instance compared with other algorithms.RMMA can also solve RNP problem stably and efficiently when the number and position of tags change over time.
基金supported by the National Natural Science Foundation of China (61761004)the Natural Science Foundation of Guangxi Province, China (2019GXNSFAA245045)。
文摘In order to improve the service quality of radio frequency identification(RFID) systems, multiple objectives should be comprehensively considered. An improved brain storm optimization algorithm GABSO, which incorporated adaptive learning operator and golden sine operator into the original brain storm optimization(BSO) algorithm, was proposed to solve the problem of RFID network planning(RNP). GABSO algorithm introduces learning operator and golden sine operator to achieve a balance between exploration and development. Based on GABSO algorithm, an optimization model is established to optimize the position of the reader. The GABSO algorithm was tested on the RFID model and dataset, and was compared with other methods. The GABSO algorithm’s tag coverage was increased by 9.62% over the Cuckoo search(CS) algorithm, and 7.70% over BSO. The results show that the GABSO algorithm could be successfully applied to solve the problem of RNP.
文摘The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the synthetically uncertainties of the time limit caused by Fuzzy, random and indeterminate known factors by the connection number for a large\|scale project. The results illustrate that the new network planning and controlling method based on the connection number a+bi can provide more useful information such as primary critical paths, secondary critical paths and third critical paths etc. The new method is mroe flexible than the traditional method, and is more suitable to the practical application of project.
文摘The first and foremost task of communication network planning is macro forecasting to theservice volume ,and the quality of planning ultimately depends upon the accuracy of forecasting. Theconventional methods usually as forecasting model are increase rate method, time sequence extensionmethod, regression correlation analysis method. However, nowadays in market economy drvelopingstage ,to meet the vigorous demand, communication servtice business, particularly the telecommunicationservice is drveloping rapidly such that forcasting by the conventional method fails achieve the goalfavourably. Thus we should emancipate our mind thinking deeply into the communication conoiationand the method of forecasting. To this end ,the author exploited the laiter ,introducing GM(1, 1) modelas forcastzng means. Comparint with the forecasting results from several other niodels the GM(1.1)has better reliability. Is has been put into practice in many urban telecomrnunication network planning. Allresults obtatned are desirable.
基金supported by the Natural Sciences and Engineering Research Council(NSERC)of Canada.
文摘In this paper,we design a resource management scheme to support stateful applications,which will be prevalent in sixth generation(6G)networks.Different from stateless applications,stateful applications require context data while executing computing tasks from user terminals(UTs).Using a multi-tier computing paradigm with servers deployed at the core network,gateways,and base stations to support stateful applications,we aim to optimize long-term resource reservation by jointly minimizing the usage of computing,storage,and communication resources and the cost of reconfiguring resource reservation.The coupling among different resources and the impact of UT mobility create challenges in resource management.To address the challenges,we develop digital twin(DT)empowered network planning with two elements,i.e.,multi-resource reservation and resource reservation reconfiguration.First,DTs are designed for collecting UT status data,based on which UTs are grouped according to their mobility patterns.Second,an algorithm is proposed to customize resource reservation for different groups to satisfy their different resource demands.Last,a Meta-learning-based approach is developed to reconfigure resource reservation for balancing the network resource usage and the reconfiguration cost.Simulation results demonstrate that the proposed DTempowered network planning outperforms benchmark frameworks by using less resources and incurring lower reconfiguration costs.
基金The authors received specific funding for State Grid Corporation Headquarters Project Support,Key Technologies and Applications of Planning and Decision-Making Based on the Full Cost Chain of the Power Grid,Grant No.5205331800001.
文摘For facing the challenges brought by large-scale renewable energy having access to the system and considering the key technologies of energy Internet,it is very necessary to put forward the location method of distribution network equipment and capacity from the perspective of life cycle cost.Compared with the traditional energy network,the equipment capacity problem of energy interconnected distribution network which involves in electricity network,thermal energy network and natural gas network is comprehensively considered in this paper.On this basis,firstly,the operation architecture of energy interconnected distribution network is designed.Secondly,taking the grid connection location and configuration capacity of key equipment in the system as the control variables and the operation cost of system comprehensive planning in the whole life cycle as the goal,the equipment location and capacity optimization model of energy interconnected distribution network is established.Finally,an IEEE 33 bus energy mutual distribution grid system is taken for example analysis,and the improved chaotic particle swarmoptimization algorithm is used to solve it.The simulation results show that the method proposed in this paper is suitable for the equipment location and capacity planning of energy interconnected distribution network,and it can effectively improve the social and economic benefits of system operation.
文摘The planning of wireless communication networks in underdeveloped countries is studied for landline telephone, fixed broadband wireless access and PLMN systems via investigation and discussion of the LDC networks' characteristic, technology selection, deployment consideration, network configuring, civil work evaluation and investment estimation. An example is embedded all through providing a general