The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the...The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the synthetically uncertainties of the time limit caused by Fuzzy, random and indeterminate known factors by the connection number for a large\|scale project. The results illustrate that the new network planning and controlling method based on the connection number a+bi can provide more useful information such as primary critical paths, secondary critical paths and third critical paths etc. The new method is mroe flexible than the traditional method, and is more suitable to the practical application of project.展开更多
文摘The connection number a+bi is a new kind of number in the Set Pair Analysis (SPA) theory. This paper applies it to network planning technique and considers the expressing, processing and controlling methods of the synthetically uncertainties of the time limit caused by Fuzzy, random and indeterminate known factors by the connection number for a large\|scale project. The results illustrate that the new network planning and controlling method based on the connection number a+bi can provide more useful information such as primary critical paths, secondary critical paths and third critical paths etc. The new method is mroe flexible than the traditional method, and is more suitable to the practical application of project.