The Newton-Like algorithm with price estimation error in optimization flow control in network is analyzed. The estimation error is treated as inexactness of the gradient and the inexact descent direction is analyzed. ...The Newton-Like algorithm with price estimation error in optimization flow control in network is analyzed. The estimation error is treated as inexactness of the gradient and the inexact descent direction is analyzed. Based on the optimization theory, a sufficient condition for convergence of this algorithm with bounded price estimation error is obtained. Furthermore, even when this sufficient condition doesn't hold, this algorithm can also converge, provided a modified step size, and an attraction region is obtained. Based on Lasalle's invariance principle applied to a suitable Lyapunov function, the dynamic system described by this algorithm is proved to be global stability if the error is zero. And the Newton-Like algorithm with bounded price estimation error is also globally stable if the error satisfies the sufficient condition for convergence. All trajectories ultimately converge to the equilibrium point.展开更多
The stability of the Newton-like algorithm in optimization flow control is considered in this paper. This algorithm is proved to be globally stable under a general network topology by means of Lyapunov stability theor...The stability of the Newton-like algorithm in optimization flow control is considered in this paper. This algorithm is proved to be globally stable under a general network topology by means of Lyapunov stability theory,without considering the round trip time of each source. While the stability of this algorithm with considering the round trip time is analyzed as well. The analysis shows that the algorithm with only one bottleneck link accessed by several sources is also globally stable,and all trajectories described by this algorithm ultimately converge to the equilibrium point.展开更多
大量可再生能源与新型负荷的运行不确定性较大程度地影响了配电网无功规划模型的工程适用性。考虑到静止无功发生器(static var generator,SVG)动态调压策略对电压不确定性的抑制作用,提出了一种规划与运行相结合的双层无功规划配置方...大量可再生能源与新型负荷的运行不确定性较大程度地影响了配电网无功规划模型的工程适用性。考虑到静止无功发生器(static var generator,SVG)动态调压策略对电压不确定性的抑制作用,提出了一种规划与运行相结合的双层无功规划配置方法。首先,考虑SVG动态调压特性,构建不确定性仿射潮流模型,提出了计及SVG动态调压策略的仿射潮流算法,求解满足SVG容量约束下潮流状态量的波动区间。在此基础上,建立了考虑运行不确定性的双层多目标无功规划配置模型,以最小化规划方案等值年总成本与电压波动指标作为目标,解决SVG和电容器组的最优配置问题。最后,通过算例验证了不确定性无功规划方案的合理性和经济性。展开更多
基金supported in part by the National Outstanding Youth Foundation of P.R.China (60525303)the National Natural Science Foundation of P.R.China(60404022,60604004)+2 种基金the Natural Science Foundation of Hebei Province (102160)the special projects in mathematics funded by the Natural Science Foundation of Hebei Province(07M005)the NS of Education Office in Hebei Province (2004123).
文摘The Newton-Like algorithm with price estimation error in optimization flow control in network is analyzed. The estimation error is treated as inexactness of the gradient and the inexact descent direction is analyzed. Based on the optimization theory, a sufficient condition for convergence of this algorithm with bounded price estimation error is obtained. Furthermore, even when this sufficient condition doesn't hold, this algorithm can also converge, provided a modified step size, and an attraction region is obtained. Based on Lasalle's invariance principle applied to a suitable Lyapunov function, the dynamic system described by this algorithm is proved to be global stability if the error is zero. And the Newton-Like algorithm with bounded price estimation error is also globally stable if the error satisfies the sufficient condition for convergence. All trajectories ultimately converge to the equilibrium point.
基金the National Outstanding Youth Foundation of China (Grant No.60525303)the NNSF of China( Grant No.60404022 and 60604004)+2 种基金the NSF of Hebei Province (Grant No.102160)the Special Projects in Mathematics Funded by Natural Science Foundation of Hebei Prov-ince(Grant No.07M005)the NS of Education Office in Hebei Province (Grant No.2004123).
文摘The stability of the Newton-like algorithm in optimization flow control is considered in this paper. This algorithm is proved to be globally stable under a general network topology by means of Lyapunov stability theory,without considering the round trip time of each source. While the stability of this algorithm with considering the round trip time is analyzed as well. The analysis shows that the algorithm with only one bottleneck link accessed by several sources is also globally stable,and all trajectories described by this algorithm ultimately converge to the equilibrium point.
文摘大量可再生能源与新型负荷的运行不确定性较大程度地影响了配电网无功规划模型的工程适用性。考虑到静止无功发生器(static var generator,SVG)动态调压策略对电压不确定性的抑制作用,提出了一种规划与运行相结合的双层无功规划配置方法。首先,考虑SVG动态调压特性,构建不确定性仿射潮流模型,提出了计及SVG动态调压策略的仿射潮流算法,求解满足SVG容量约束下潮流状态量的波动区间。在此基础上,建立了考虑运行不确定性的双层多目标无功规划配置模型,以最小化规划方案等值年总成本与电压波动指标作为目标,解决SVG和电容器组的最优配置问题。最后,通过算例验证了不确定性无功规划方案的合理性和经济性。