The evaluation process of traditional land productivity is relatively complex,and the evaluation indices and results cannot display visually.With the development of geographic information system science,there are more...The evaluation process of traditional land productivity is relatively complex,and the evaluation indices and results cannot display visually.With the development of geographic information system science,there are more and more studies on the GIS-based land productivity evaluation.GIS system can combine the evaluation model with information system software,realizing the visual display of all the evaluation factors.In this paper,with the development process of GIS-based management information system as references,the management information system for GIS-based gravel-mulched field productivity evaluation was designed and developed by combining with the SI model for gravel-mulched field productivity evaluation.The system was developed under VB environment,integrated with MapInfo,and the evaluation results could be shown visually in the system windows.展开更多
A novel method was proposed to design the structure of a bone tissue engineering scafold based on triply periodic minimal surface.In this method,reverse engineering software was used to reconstruct the surface from po...A novel method was proposed to design the structure of a bone tissue engineering scafold based on triply periodic minimal surface.In this method,reverse engineering software was used to reconstruct the surface from point cloud data.This method overcomes the limitations of commercially available software packages that prevent them from generating models with complex surfaces used for bone tissue engineering scafolds.Additionally,the fluid feld of the scafolds was simulated through a numerical method based on fnite volume and the cell proliferation performance was evaluated via an in vitro experiment.The cell proliferation and the mass flow evaluated in a bioreactor further verifed the flow feld simulated using computational fluid dynamics.The result of this study illustrates that the pressure value drops rapidly from 0.103 Pa to 0.011 Pa in the y-axis direction and the mass flow is unevenly distributed in the outlets.The mass flow in the side outlets is observed to be approximately 24.3 times higher thanthe bottom.Importantly,although the mean value of wall shear stress is signifcantly more than 0.05 Pa,there is stil a large area with a suitable shear stress below 0.05 Pa where most cells can proliferate well.The result shows that th inlet velocity 0.0075 m/s is suitable for cell proliferation in the scafold.This study provides an insight into the design analysis,and in vitro experiment of a bone tissue engineering scafold.展开更多
To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problem...To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.展开更多
基金Supported by National Key Technology R&D Program(2007BAD54B01)the Scientific Research Project of Yinchuan University of Energy(2014KYZ05)
文摘The evaluation process of traditional land productivity is relatively complex,and the evaluation indices and results cannot display visually.With the development of geographic information system science,there are more and more studies on the GIS-based land productivity evaluation.GIS system can combine the evaluation model with information system software,realizing the visual display of all the evaluation factors.In this paper,with the development process of GIS-based management information system as references,the management information system for GIS-based gravel-mulched field productivity evaluation was designed and developed by combining with the SI model for gravel-mulched field productivity evaluation.The system was developed under VB environment,integrated with MapInfo,and the evaluation results could be shown visually in the system windows.
基金Supported by National Natural Science Foundation of China(Grant Nos.51675312,51375273)
文摘A novel method was proposed to design the structure of a bone tissue engineering scafold based on triply periodic minimal surface.In this method,reverse engineering software was used to reconstruct the surface from point cloud data.This method overcomes the limitations of commercially available software packages that prevent them from generating models with complex surfaces used for bone tissue engineering scafolds.Additionally,the fluid feld of the scafolds was simulated through a numerical method based on fnite volume and the cell proliferation performance was evaluated via an in vitro experiment.The cell proliferation and the mass flow evaluated in a bioreactor further verifed the flow feld simulated using computational fluid dynamics.The result of this study illustrates that the pressure value drops rapidly from 0.103 Pa to 0.011 Pa in the y-axis direction and the mass flow is unevenly distributed in the outlets.The mass flow in the side outlets is observed to be approximately 24.3 times higher thanthe bottom.Importantly,although the mean value of wall shear stress is signifcantly more than 0.05 Pa,there is stil a large area with a suitable shear stress below 0.05 Pa where most cells can proliferate well.The result shows that th inlet velocity 0.0075 m/s is suitable for cell proliferation in the scafold.This study provides an insight into the design analysis,and in vitro experiment of a bone tissue engineering scafold.
基金Supported by the Project of Great Wall Drilling Company in CNPC(2015A25-2(2012))
文摘To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.