A new equipment must frequently meet some target requirements. If it must meet an operational readiness (OR) requirement, R&M&S engineers must allocate the target to the lowest replaceable unit; they must cons...A new equipment must frequently meet some target requirements. If it must meet an operational readiness (OR) requirement, R&M&S engineers must allocate the target to the lowest replaceable unit; they must constantly predict and evaluate the target. In addition, R&M&S engineers must coordinate the targets between operational readiness and R&M&S. The prediction、allocation、coordination and optimization must be done again and again in the design, the calculating work loaded down with trivial details. The operational readiness CAD system (ORCADS) may provide useful support for R&M&S engineers. This paper discusses the method of OR prediction and implementation of ORCADS. A case example is provided.展开更多
文摘A new equipment must frequently meet some target requirements. If it must meet an operational readiness (OR) requirement, R&M&S engineers must allocate the target to the lowest replaceable unit; they must constantly predict and evaluate the target. In addition, R&M&S engineers must coordinate the targets between operational readiness and R&M&S. The prediction、allocation、coordination and optimization must be done again and again in the design, the calculating work loaded down with trivial details. The operational readiness CAD system (ORCADS) may provide useful support for R&M&S engineers. This paper discusses the method of OR prediction and implementation of ORCADS. A case example is provided.