Staggered line-drive patterns are widely used in oilfields. In this paper, to optimize a staggered pattern of horizontal wells, a 3D problem was divided into two 2D (x-y plane andy-z plane) problems with the pseudo-...Staggered line-drive patterns are widely used in oilfields. In this paper, to optimize a staggered pattern of horizontal wells, a 3D problem was divided into two 2D (x-y plane andy-z plane) problems with the pseudo-3D method, conformal transformation and superposition principle. A productivity equation for a horizontal well was deduced, which can be used to optimize the well pattern. A relationship between the length of horizontal wells and the shape factor of well patterns was established. The result shows that optimized well patterns can improve oil production from horizontal wells. This provides a theoretical basis for horizontal well applications to the development of oilfields, especially for overall development of oilfields by horizontal wells.展开更多
With the deepening of coalbed methane(CBM)exploration and development,the problem of low gas production has gradually become one of the main factors restricting the development of the CBM industry in China.Reasonable ...With the deepening of coalbed methane(CBM)exploration and development,the problem of low gas production has gradually become one of the main factors restricting the development of the CBM industry in China.Reasonable well pattern deployment can improve the productivity of CBM wells and reduce the cost of production,while the reservoir changes of CBM wells play a important role for well pattern infilling.In this study,the dynamic characteristics of the average reservoir pressure(ARP),permeability,and drainage radius during the development process of CBM wells are systematically analyzed,and predicted the production changes of well groups before and after infilling wells in combination with the characteristics of reservoir changes.The results show that the high gas production wells have a larger pressure drop,long drainage radius,and a large increase in permeability.On the contrary,low gas production wells are characterized by small drainage radius,damaged permeability and difficult to recover.The productivity of infilled horizontal wells is predicted for two well groups with different productivity and reservoir dynamic characteristics.After infilling wells,the production of current wells has increased at different degrees.It is predicted that the average gas production of low gas production well group H1 and middle gas production well group H2 will increase 1.64 and 2.09 times respectively after 3000 days production simulation.In addition,the pressure interference between wells has increased significantly,and the overall gas production of the well group has greatly increased.Infill wells can achieve better development results in areas with superior CBM resources,recoverable reservoir permeability,and small drainage radius during the early production process.The research results provide a reference for the later infill adjustment of CBM well patterns in the study area.展开更多
文摘Staggered line-drive patterns are widely used in oilfields. In this paper, to optimize a staggered pattern of horizontal wells, a 3D problem was divided into two 2D (x-y plane andy-z plane) problems with the pseudo-3D method, conformal transformation and superposition principle. A productivity equation for a horizontal well was deduced, which can be used to optimize the well pattern. A relationship between the length of horizontal wells and the shape factor of well patterns was established. The result shows that optimized well patterns can improve oil production from horizontal wells. This provides a theoretical basis for horizontal well applications to the development of oilfields, especially for overall development of oilfields by horizontal wells.
基金the National Natural Science Foundation of China(Grant Nos.U1910205 and 41872178)the National Science and Technology Major Project of China(No.2017ZX05064003).
文摘With the deepening of coalbed methane(CBM)exploration and development,the problem of low gas production has gradually become one of the main factors restricting the development of the CBM industry in China.Reasonable well pattern deployment can improve the productivity of CBM wells and reduce the cost of production,while the reservoir changes of CBM wells play a important role for well pattern infilling.In this study,the dynamic characteristics of the average reservoir pressure(ARP),permeability,and drainage radius during the development process of CBM wells are systematically analyzed,and predicted the production changes of well groups before and after infilling wells in combination with the characteristics of reservoir changes.The results show that the high gas production wells have a larger pressure drop,long drainage radius,and a large increase in permeability.On the contrary,low gas production wells are characterized by small drainage radius,damaged permeability and difficult to recover.The productivity of infilled horizontal wells is predicted for two well groups with different productivity and reservoir dynamic characteristics.After infilling wells,the production of current wells has increased at different degrees.It is predicted that the average gas production of low gas production well group H1 and middle gas production well group H2 will increase 1.64 and 2.09 times respectively after 3000 days production simulation.In addition,the pressure interference between wells has increased significantly,and the overall gas production of the well group has greatly increased.Infill wells can achieve better development results in areas with superior CBM resources,recoverable reservoir permeability,and small drainage radius during the early production process.The research results provide a reference for the later infill adjustment of CBM well patterns in the study area.