期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Determination of Preventive Maintenance Lead Time Using Hybrid Analysis
1
作者 Joseph Mathew 《International Journal of Plant Engineering and Management》 2005年第1期13-18,共6页
The time for conducting Preventive Maintenance (PM) on an asset is oftendetermined using a predefined alarm limit based on trends of a hazard function. In this paper, theauthors propose using both hazard and reliabili... The time for conducting Preventive Maintenance (PM) on an asset is oftendetermined using a predefined alarm limit based on trends of a hazard function. In this paper, theauthors propose using both hazard and reliability functions to improve the accuracy of theprediction particularly when the failure characteristic of the asset whole life is modelled usingdifferent failure distributions for the different stages of the life of the asset. The proposedmethod is validated using simulations and case studies. 展开更多
关键词 alarm limit peventive maintenance RELIABILITY HAZARD
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部