期刊文献+
共找到17篇文章
< 1 >
每页显示 20 50 100
Experience of Supervision over Fossil-fired Power Plant Construction Project
1
《Electricity》 1999年第1期49-52,共4页
关键词 Experience of Supervision over Fossil-fired Power plant construction Project OVER
下载PDF
Geotechnical Engineering Plays an Important Role in Power Plant Construction
2
《Electricity》 1999年第1期36-38,共3页
关键词 Geotechnical Engineering Plays an Important Role in Power plant construction In
下载PDF
Cloning of a flower-specific expression promoter from Arabidopsis thaliana and its plant expression vector construction 被引量:1
3
作者 FAN Bing-you GAO Shui-ping +1 位作者 HOU Xiao-gai SHI Guo-an 《Forestry Studies in China》 CAS 2010年第4期201-205,共5页
Given the sequence of Chs gene promoter from Arabidopsis thaliana reported in GenBank (AF248988), a pair of specific PCR primers was designed with the Primer Premier 5.0 software. PCR products of about 0.5 kb were s... Given the sequence of Chs gene promoter from Arabidopsis thaliana reported in GenBank (AF248988), a pair of specific PCR primers was designed with the Primer Premier 5.0 software. PCR products of about 0.5 kb were successfully amplified with the genome DNA of A. thaliana as a DNA template and Taq polymerase as DNA polymerase. The purified PCR products were ligated to the pMD18-T vector. The sequencing result showed that the Chs promoter from A. thaliana was 531 bp long. Sequence alignment analysis based on the DNAMAN software revealed that the sequence similarity between the cloned promoter and target promoter (AF248988) was up to 100%. Online PLACE analysis indicated that the Chs promoter contained cis-elements such as TATA-box, CAAT-box, pollen-box, G-box, ACGT-containing element, R response element, Myb recognition element and TACPyAT-box. At the same time, a plant expression vectorpAtChs::GUS which fused the Chs promoter and the marker gene GUS was successfully constructed. 展开更多
关键词 Arabidopsis thaliana PROMOTER chalcone synthase CLONING plant vector construction
下载PDF
Electron Beam Desulfurization Project of Chengdu Cogeneration Power Plant Started Construction - A new cooperation in environment protection between China and Japan
4
《Electricity》 1996年第2期28-28,共1页
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i... On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between 展开更多
关键词 PROJECT A new cooperation in environment protection between China and Japan Electron Beam Desulfurization Project of Chengdu Cogeneration Power plant Started construction
下载PDF
Construction of Houshi Power Plant (6×600 MW)
5
《Electricity》 1999年第4期7-13,共7页
关键词 construction of Houshi Power plant
下载PDF
The construction of Zhangzhou Houshi Power Plant ofFujian Province is in full swing
6
《Electricity》 1998年第2期48-48,共1页
关键词 The construction of Zhangzhou Houshi Power plant of Fujian Province is in full swing
下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
7
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in construction of Power plant
下载PDF
Design and Construction of the Power Plant Multi-flue Chimneys in East China Area
8
作者 Di Yuanhang 《Electricity》 1997年第4期53-56,共4页
This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper co... This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies. 展开更多
关键词 Design and construction of the Power plant Multi-flue Chimneys in East China Area
下载PDF
CONSTRUCTION OF GUIZHOU PANXINA THERMAL POWER PLANT PHASE Ⅱ SPEED UP TO PROMOTE THE COURSE "SENDING POWER FROM WEST TO EAST
9
《Electricity》 2000年第3期49-49,共1页
关键词 SENDING POWER FROM WEST TO EAST construction OF GUIZHOU PANXINA THERMAL POWER plant PHASE SPEED UP TO PROMOTE THE COURSE
下载PDF
Construction of Ling'ao Nuclear Power Plant proceeds as scheduled
10
《Electricity》 1997年第2期22-22,共1页
关键词 construction of Ling’ao Nuclear Power plant proceeds as scheduled
下载PDF
Lower Project Cost,Shorten Construction Schedule and Promote Market Competition of Fossil Power Plants
11
《Electricity》 1999年第3期23-27,共5页
关键词 PROJECT Lower Project Cost Shorten construction Schedule and Promote Market Competition of Fossil Power plants
下载PDF
Constructing Large Capacity Power Plant on Collapsible Loess Stratum with Huge Thickness
12
作者 Huang Tianshi, Liu Houjian Northwest Electric Power Design Institute (NWEPDI) 《Electricity》 1996年第4期39-41,共3页
1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to severa... 1 Preface In the northern and northwestern parts of China, quite a large portion of area, approximately 630,000 km^2, is covered by loess and loess-liked soils. The loess thickness ranges from several meters to several hundred meters along the river’s terraces to those geomorphologic plateaus. In geology, "China Loess" has become a geologic term, because the loess in China has evolved with the widest distribution and greatest thickness in the world, and is also a typical and significant deposit in Quaternary Period. 展开更多
关键词 THAN MORE In TEST Constructing Large Capacity Power plant on Collapsible Loess Stratum with Huge Thickness
下载PDF
Xiangfan Coal-fired Power Plant - a matched large power plant for Three Gorges Project starts to construct
13
《Electricity》 1996年第4期44-44,共1页
Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November... Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996. 展开更多
关键词 PROJECT Xiangfan Coal-fired Power plant a matched large power plant for Three Gorges Project starts to construct
下载PDF
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
14
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous construction and Operation of Coal Mine and Power plant in Mining Area
原文传递
Restoration of hyper-eutrophic water with a modularized and air adjustable constructed submerged plant bed 被引量:3
15
作者 Jinzhong LI Xueju LI +2 位作者 Shujuan SUN Xuegong LIU Suiliang HUANG 《Frontiers of Environmental Science & Engineering》 SCIE EI CSCD 2011年第4期573-584,共12页
A modularized and air adjustable constructed submerged plant bed(CSPB)which can be used to restore the eutrophic water is introduced in this paper.This plant bed helps hydrophyte grow under poor conditions such as fre... A modularized and air adjustable constructed submerged plant bed(CSPB)which can be used to restore the eutrophic water is introduced in this paper.This plant bed helps hydrophyte grow under poor conditions such as frequently changed water depth,impaired water transparency,algae bloom and substantial duckweed in summer,which are not naturally suitable for growing hydrophyte.This pilot study in Waihuan River of Tianjin,China,revealed that reduction of Chemical Oxygen Demand(COD),Total Nitrogen(TN)and Total Phosphorus(TP)by the use of CSPB could be reached 30%-35%,35%-40%,30%-40%respectively in the growing season(from March to October)and 5%-10%,5%-15%,7%-20%respectively in the winter(from November to February)when the detention time was 6 d.The relationships between the concentration of COD,TN,TP and the detention time fit the first-order kinetic equation well and the coefficients of determination(R^(2))were all above 0.9.The attenuation coefficients k of the kinetic equation were a function of the water temperature.When the water temperature was quite low or quite high,k was not significantly changed with increasing or decreasing water temperature.While when the temperature was in a moderate range,an increase or decrease of water temperature would lead to a rapid increase or decrease in k. 展开更多
关键词 modularized and air adjustable constructed submerged plant bed water purification eco-restoration techniques aquatic plants EUTROPHIC
原文传递
Contaminant removal from low-concentration polluted river water by the bio-rack wetlands 被引量:4
16
作者 Ji Wang Lanying Zhang +2 位作者 Shaoyong Lu Xiangcan Jint Shu Gan 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2012年第6期1006-1013,共8页
The bio-rack is a new approach for treating low-concentration polluted river water in wetland systems.A comparative study of the efficiency of contaminant removal between four plant species in bio-rack wetlands and be... The bio-rack is a new approach for treating low-concentration polluted river water in wetland systems.A comparative study of the efficiency of contaminant removal between four plant species in bio-rack wetlands and between a bio-rack system and control system was conducted on a small-scale (500 mm length × 400 mm width × 400 mm height) to evaluate the decontamination effects of four different wetland plants.There was generally a significant difference in the removal of total nitrogen (TN),ammonia nitrogen (NH 3-N) and total phosphorus (TP),but no significant difference in the removal of permanganate index (COD Mn) between the bio-rack wetland and control system.Bio-rack wetland planted with Thalia dealbata had higher nutrient removal rates than wetlands planted with other species.Plant fine-root (root diameter 3 mm) biomass rather than total plant biomass was related to nutrient removal efficiency.The study suggested that the nutrient removal rates are influenced by plant species,and high fine-root biomass is an important factor in selecting highly effective wetland plants for a bio-rack system.According to the mass balance,the TN and TP removal were in the range of 61.03-73.27 g/m^2 and 4.14-5.20 g/m^2 in four bio-rack wetlands during the whole operational period.The N and P removal by plant uptake constituted 34.9%-43.81% of the mass N removal and 62.05%-74.81% of the mass P removal.The study showed that the nitrification/denitrification process and plant uptake process are major removal pathways for TN,while plant uptake is an effective removal pathway for TP. 展开更多
关键词 bio-rack constructed wetland fine-root biomass low-concentration polluted river water plants uptake
原文传递
Nitrogen mass balance in a constructed wetland treating piggery wastewater effluent 被引量:2
17
作者 Soyoung Lee Marla C.Maniquiz-Redillas +1 位作者 Jiyeon Choi Lee-Hyung Kim 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2014年第6期1260-1266,共7页
The nitrogen changes and the nitrogen mass balance in a free water surface flow constructed wetland (CW) using the four-year monitoring data from 2008 to 2012 were estimated. The CW was composed of six cells in seri... The nitrogen changes and the nitrogen mass balance in a free water surface flow constructed wetland (CW) using the four-year monitoring data from 2008 to 2012 were estimated. The CW was composed of six cells in series that include the first settling basin (Cell 1), aeration pond (Cell 2), deep marsh (Cell 3), shallow marsh (Cell 4), deep marsh (Cell 5) and final settling basin (Cell 6). Analysis revealed that the NH4+-N concentration decreased because of ammonification which was then followed by nitrification. The NO4+-N and NO4+-N were also further reduced by means of microbial activities and plant uptake during photosynthesis. The average nitrogen concentration at the influent was 37,819 kg/year and approximately 45% of that amount exited the CW in the effluent. The denitrification amounted to 34% of the net nitrogen input, whereas the accretion of sediment was only 7%. The biomass uptake of plants was able to retain only 1% of total nitrogen load. In order to improve the nutrient removal by plant uptake, plant coverage in four cells (i.e., Cells 1, 3, 4 and 5) could be increased. 展开更多
关键词 constructed wetland livestock wastewater nitrogen mass balance plant uptake sediment
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部