Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November...Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.展开更多
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i...On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between展开更多
Coal is the backbone of the Indian power sector. The coal-fired power plants remain the largest emitters of carbon dioxide, sulfur dioxide and substantial amounts of nitrogen oxides, which are associated with climate ...Coal is the backbone of the Indian power sector. The coal-fired power plants remain the largest emitters of carbon dioxide, sulfur dioxide and substantial amounts of nitrogen oxides, which are associated with climate and health impacts. Various CO2 mitigation technologies (carbon capture and storage--CCS) and SO2/NOx mitigation technologies (flue gas desulfurization and selective catalytic reduction) have been employed to reduce the environmental impacts of the coal-fired power plants. Therefore, it is imperative to understand the feasibility of various mitigation technologies employed. This paper attempts to perform environmental life cycle assessment (LCA) of Indian coal-fired power plant with and without CO2, SO2 and NOx mitigation controls. The study develops new normalization factors for India in various damage categories, using the Indian emissions and energy consumption data, coupled with the emissions and particulate emission to come up with a final environmental impact of coal-fired electricity. The results show a large degree of dependence on the perspective of assessment used. The impact of sensitivities of individual substances and the effect of plant efficiency on the final LCA results is also studied.展开更多
Multi-train modeling and simulation plays a vital role in railway electrification during operation and planning phase. Study of peak power demand and energy consumed by each traction substation needs to be deter- mine...Multi-train modeling and simulation plays a vital role in railway electrification during operation and planning phase. Study of peak power demand and energy consumed by each traction substation needs to be deter- mined to verify that electrical energy flowing in its railway power feeding system is appropriate or not. Gauss-Seidel, conventional Newton-Raphson, and current injection methods are well-known and widely accepted as a tool for electrical power network solver in DC railway power supply study. In this paper, a simplified Newton-Raphson method has been proposed. The proposed method employs a set of current-balance equations at each electrical node instead of the conventional power-balance equation used in the conventional Newton-Raphson method. This concept can remarkably reduce execution time and computing complexity for multi-train simulation. To evaluate its use, Sukhumvit line of Bangkok transit system (BTS) of Thai- land with 21.6-km line length and 22 passenger stopping stations is set as a test system. The multi-train simulation integrated with the proposed power network solver is developed to simulate 1-h operation service of selected 5-min headway. From the obtained results, the proposed method is more efficient with approximately 18 % faster than the conventional Newton-Raphson method and just over 6 % faster than the current injection method.展开更多
On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administr...On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and Administrator of the newly established National Energy Administration attended the ceremony and delivered an important speech. Here published is an abridgment from the speech.展开更多
The key problems of cold power spinning of Ti-15-3 alloy are studied. Reasonable billet preparation methods are presented to improve crystal structure and avoid crack of billet. Influences of original wall thickness,...The key problems of cold power spinning of Ti-15-3 alloy are studied. Reasonable billet preparation methods are presented to improve crystal structure and avoid crack of billet. Influences of original wall thickness, reduction rate and feed rate on expanding in diameter are analyzed and some methods to prevent expanding in diameter are given.展开更多
In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this mot...In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this motor is analyzed by computer simulation. By comparison of the tested and computed results, which are in good agreement, the dynamic model and simulative method are verified.展开更多
Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization pr...Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective.展开更多
The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as h...The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.展开更多
With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,a...With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,and interfering with the normal operation of the power grid.Based on the requirements of harmonic suppression and power system protection,a shunt active power filter(SAPF)is proposed as an effective harmonic suppression method.However,there are problems with impulse current and impulse voltage in the starting process of SAPF.Impulse current and impulse voltage cause the power grid and switchgear to bear greater current stress and voltage stress,which seriously affect the security and reliability of the power grid and may damage the switchgear.To effectively solve the problem of impulse current and impulse voltage,the starting process of SAPF is divided into the uncontrolled rectification stage and the transition stage.The mathematical model of the DC side of APF is established.The causes of impulse current and impulse voltage in the uncontrolled rectifier and transition phases are analyzed.By introducing voltage square,a new starting impulse suppression strategy of active power filter based on the slow rising curve is proposed,fundamentally solving the problems of impulse current and impulse voltage.Simulation results verify the effectiveness and feasibility of this method.展开更多
China is an important country in iron and steel industry.Power electronics converters are widely used.For the cold rolling mills of high speed,AC-DC-AC converters should be used.In the paper,the design and the control...China is an important country in iron and steel industry.Power electronics converters are widely used.For the cold rolling mills of high speed,AC-DC-AC converters should be used.In the paper,the design and the control system of the large power three-level AC - DC - AC converter with IGCTs is investigated,and a back-to-back large power three-level AC - DC - AC converter with IGCTs has been got. With a series experiments,the performance of the converter is examined.The experiment result indicates the converter reaches the design requirement and it shows excellent performance.The converter system has been put into use safely.It is estimated that the AC - DC - AC converter system will be used in the drive systems for rolling mills in the near future.展开更多
On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development o...The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development of real-time communication networks,the black-start decision-makers are no longer limited to only one or a few power system experts such as dispatchers,but rather a large group of professional people in practice.The overall behaviors of a large decision-making group of decision-makers/experts are more complicated and unpredictable.However,the existing methods for black-start decision-making cannot handle the situations with a large group of decision-makers.Given this background,a clustering algorithm is presented to optimize the black-start decision-making problem with a large group of decision-makers.Group decision-making preferences are obtained by clustering analysis,and the final black-start decision-making results are achieved by combining the weights of black-start indexes and the preferences of the decision-making group.The effectiveness of the proposed method is validated by a practical case.This work extends the black-start decision-making problem to situations with a large group of decision-makers.展开更多
On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.
文摘Xiangfan Coal-fired Power Plant, a key energy construction project matched with Three Gorges Project, approved by the State Council. formally started to build in the suburb of Xiangfan City, Hubei Province on November 29, 1996.
文摘On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between
文摘Coal is the backbone of the Indian power sector. The coal-fired power plants remain the largest emitters of carbon dioxide, sulfur dioxide and substantial amounts of nitrogen oxides, which are associated with climate and health impacts. Various CO2 mitigation technologies (carbon capture and storage--CCS) and SO2/NOx mitigation technologies (flue gas desulfurization and selective catalytic reduction) have been employed to reduce the environmental impacts of the coal-fired power plants. Therefore, it is imperative to understand the feasibility of various mitigation technologies employed. This paper attempts to perform environmental life cycle assessment (LCA) of Indian coal-fired power plant with and without CO2, SO2 and NOx mitigation controls. The study develops new normalization factors for India in various damage categories, using the Indian emissions and energy consumption data, coupled with the emissions and particulate emission to come up with a final environmental impact of coal-fired electricity. The results show a large degree of dependence on the perspective of assessment used. The impact of sensitivities of individual substances and the effect of plant efficiency on the final LCA results is also studied.
文摘Multi-train modeling and simulation plays a vital role in railway electrification during operation and planning phase. Study of peak power demand and energy consumed by each traction substation needs to be deter- mined to verify that electrical energy flowing in its railway power feeding system is appropriate or not. Gauss-Seidel, conventional Newton-Raphson, and current injection methods are well-known and widely accepted as a tool for electrical power network solver in DC railway power supply study. In this paper, a simplified Newton-Raphson method has been proposed. The proposed method employs a set of current-balance equations at each electrical node instead of the conventional power-balance equation used in the conventional Newton-Raphson method. This concept can remarkably reduce execution time and computing complexity for multi-train simulation. To evaluate its use, Sukhumvit line of Bangkok transit system (BTS) of Thai- land with 21.6-km line length and 22 passenger stopping stations is set as a test system. The multi-train simulation integrated with the proposed power network solver is developed to simulate 1-h operation service of selected 5-min headway. From the obtained results, the proposed method is more efficient with approximately 18 % faster than the conventional Newton-Raphson method and just over 6 % faster than the current injection method.
文摘On December 4, 2007, unit 1of Taizhou Power Plant was put into operation, which became the symbolic unit of the installed capacity reaching 700 GW in China. On July 31, 2008, sponsored by the National Energy Administration and assisted by the China Electricity Council and the China Guodian Corporation, the "Conferring Ceremony for the 700 GW Symbolic Generating Unit of China" was held in the Great Hall of the People, Beijing. Zhang Guobao, vice chairman of the National Development and Reform Commission and Administrator of the newly established National Energy Administration attended the ceremony and delivered an important speech. Here published is an abridgment from the speech.
文摘The key problems of cold power spinning of Ti-15-3 alloy are studied. Reasonable billet preparation methods are presented to improve crystal structure and avoid crack of billet. Influences of original wall thickness, reduction rate and feed rate on expanding in diameter are analyzed and some methods to prevent expanding in diameter are given.
文摘In this paper, by using a matrix technique, a dynamic model of high power factor induction motor with floating winding in parallel connection with capacitors is established. Then, the starting performance of this motor is analyzed by computer simulation. By comparison of the tested and computed results, which are in good agreement, the dynamic model and simulative method are verified.
文摘Considering units starting and network constraints and the concept of optimization period,a optimization model which is a typical multi-constraint knapsack problem is established to solve the selection optimization problem of units starting in power system restoration period in this paper, and the objective of the model is to maximize the total power generation capability. A relative effectiveness assessment based on a improving data envelopment analysis is adopted to select the initial units to be started, genetic algorithms are employed to solve the knapsack problem to determine the most reasonable units be started at the current time. Finally, IEEE-39 bus system simulation result proves that the proposed model is feasible and effective.
文摘The energizing of large power transformers has long been considered a critical event in the operation of an electric power system. When a transformer is energized by the utility, a typical inrush current could be as high as ten times its rated current. This could cause many problems from mechanical stress on transformer windings to harmonics injection, and system protection malfunction. There have been numerous researches focusing on calculation and mitigation of the transformer inrush current. With the development of smart grid, distributed generation from independent power producers (IPPs) is growing rapidly. This paper investigates the inrush current due to black start of an IPP system with several parallel transformers, through a simulation model in DIgSILENT Power Factory software. The study demonstrates that a single genset is capable of energizing a group of transformers since the overall inrush current is slightly above the inrush of the transformer directly connected to the generator. In addition, a simple method is proposed to mitigate the inrush current of the transformers using an auxiliary transformer.
基金supported by the National Natural Science Foundation of China under Grant 61863023.
文摘With the widespread application of power electronic equipment in the power grid,the harmonic problem of the power grid becomes more pronounced,reducing the efficiency of power production,transmission,and utilization,and interfering with the normal operation of the power grid.Based on the requirements of harmonic suppression and power system protection,a shunt active power filter(SAPF)is proposed as an effective harmonic suppression method.However,there are problems with impulse current and impulse voltage in the starting process of SAPF.Impulse current and impulse voltage cause the power grid and switchgear to bear greater current stress and voltage stress,which seriously affect the security and reliability of the power grid and may damage the switchgear.To effectively solve the problem of impulse current and impulse voltage,the starting process of SAPF is divided into the uncontrolled rectification stage and the transition stage.The mathematical model of the DC side of APF is established.The causes of impulse current and impulse voltage in the uncontrolled rectifier and transition phases are analyzed.By introducing voltage square,a new starting impulse suppression strategy of active power filter based on the slow rising curve is proposed,fundamentally solving the problems of impulse current and impulse voltage.Simulation results verify the effectiveness and feasibility of this method.
文摘China is an important country in iron and steel industry.Power electronics converters are widely used.For the cold rolling mills of high speed,AC-DC-AC converters should be used.In the paper,the design and the control system of the large power three-level AC - DC - AC converter with IGCTs is investigated,and a back-to-back large power three-level AC - DC - AC converter with IGCTs has been got. With a series experiments,the performance of the converter is examined.The experiment result indicates the converter reaches the design requirement and it shows excellent performance.The converter system has been put into use safely.It is estimated that the AC - DC - AC converter system will be used in the drive systems for rolling mills in the near future.
文摘On April 25, the Hainan Changjiang nuclear power project, jointly invested by China National Nuclear Corporation (CNNC) and China Huaneng Group with 51% and 49% shares, respectively, formally
基金supported by National Natural Science Foundation of China (No.51007080)National High Technology Research and Development Program of China (863 Program) (No.2011AA05A105)+1 种基金the Fundamental Research Funds for the Central Universities (No.2012QNA4011)key project from Zhejiang Electric Power Corporation
文摘The optimization of black-start decision-making plays an important role in the rapid restoration of a power system after a major failure/outage.With the introduction of the concept of smart grids and the development of real-time communication networks,the black-start decision-makers are no longer limited to only one or a few power system experts such as dispatchers,but rather a large group of professional people in practice.The overall behaviors of a large decision-making group of decision-makers/experts are more complicated and unpredictable.However,the existing methods for black-start decision-making cannot handle the situations with a large group of decision-makers.Given this background,a clustering algorithm is presented to optimize the black-start decision-making problem with a large group of decision-makers.Group decision-making preferences are obtained by clustering analysis,and the final black-start decision-making results are achieved by combining the weights of black-start indexes and the preferences of the decision-making group.The effectiveness of the proposed method is validated by a practical case.This work extends the black-start decision-making problem to situations with a large group of decision-makers.
文摘On March 19, the construction of a 10-MW photovoltaic power plant and a 1 000-kW new type geothermal power generation project were started by Guodian Longyuan Group in Yanbajing Town, Dangxiong County of Tibet.