Based on the general methods in power flow calculation of power system and on conceptions and classifications of parallel algorithm, a new approach named Dynamic Asynchronous Parallel Algorithm that applies to the onl...Based on the general methods in power flow calculation of power system and on conceptions and classifications of parallel algorithm, a new approach named Dynamic Asynchronous Parallel Algorithm that applies to the online analysis and real-time dispatching and controlling of large-scale power network was put forward in this paper. Its performances of high speed and dynamic following have been verified on IEEE-14 bus system.展开更多
Power flow calculation is the basis of power grid planning and many system analysis tasks require convergent power flow conditions.To address the unsolvable power flow problem caused by the reactive power imbalance,a ...Power flow calculation is the basis of power grid planning and many system analysis tasks require convergent power flow conditions.To address the unsolvable power flow problem caused by the reactive power imbalance,a method for adjusting reactive power flow convergence based on deep reinforcement learning is proposed.The deep reinforcement learning method takes switching parallel reactive compensation as the action space and sets the reward value based on the power flow convergence and reactive power adjustment.For the non-convergence power flow,the 500 kV nodes with reactive power compensation devices on the low-voltage side are converted into PV nodes by node type switching.And the quantified reactive power non-convergence index is acquired.Then,the action space and reward value of deep reinforcement learning are reasonably designed and the adjustment strategy is obtained by taking the reactive power non-convergence index as the algorithm state space.Finally,the effectiveness of the power flow convergence adjustment algorithm is verified by an actual power grid system in a province.展开更多
Medium-voltage distribution systems(MVDSs)mainly consist of a feeder head,lines,distribution transformers,and the equivalent load or power supply interfaced with the distribution transformers.The information of such l...Medium-voltage distribution systems(MVDSs)mainly consist of a feeder head,lines,distribution transformers,and the equivalent load or power supply interfaced with the distribution transformers.The information of such load or power supply can be measured via the three-wattmeter method(THM)and the two-wattmeter method(TWM).The measurements can be used to perform the control of the power supply and simulate the characteristics of the load,so the models of the load and the power supply need to consider the measurement characteristics.Existing research works on three-phase power flow(PF)just consider the measurement characteristics of THM.Hence,the PF equation of the bus measured via TWM is firstly built.Based on conventional measurements,an accurate and general model of the grounded and ungrounded slack bus is proposed.Furthermore,the influence arising from the connection type and angle shift of distribution transformers on the admittance matrix is considered,and thus a general three-phase transformer model is summarized,which is applicable for all the transformers mentioned herein.Finally,Newton's method is adopted to solve the PF calculation,and the performance of the proposed PF model is demonstrated through designed tests.展开更多
Expanding photovoltaic(PV)resources in rural-grid areas is an essential means to augment the share of solar energy in the energy landscape,aligning with the“carbon peaking and carbon neutrality”objectives.However,ru...Expanding photovoltaic(PV)resources in rural-grid areas is an essential means to augment the share of solar energy in the energy landscape,aligning with the“carbon peaking and carbon neutrality”objectives.However,rural power grids often lack digitalization;thus,the load distribution within these areas is not fully known.This hinders the calculation of the available PV capacity and deduction of node voltages.This study proposes a load-distribution modeling approach based on remote-sensing image recognition in pursuit of a scientific framework for developing distributed PV resources in rural grid areas.First,houses in remote-sensing images are accurately recognized using deep-learning techniques based on the YOLOv5 model.The distribution of the houses is then used to estimate the load distribution in the grid area.Next,equally spaced and clustered distribution models are used to adaptively determine the location of the nodes and load power in the distribution lines.Finally,by calculating the connectivity matrix of the nodes,a minimum spanning tree is extracted,the topology of the network is constructed,and the node parameters of the load-distribution model are calculated.The proposed scheme is implemented in a software package and its efficacy is demonstrated by analyzing typical remote-sensing images of rural grid areas.The results underscore the ability of the proposed approach to effectively discern the distribution-line structure and compute the node parameters,thereby offering vital support for determining PV access capability.展开更多
Purpose–The traction cable is paralleled with the existing traction network of electrified railway through transverse connecting line to form the scheme of long distance power supply for the traction network.This pap...Purpose–The traction cable is paralleled with the existing traction network of electrified railway through transverse connecting line to form the scheme of long distance power supply for the traction network.This paper aims to study the scheme composition and power supply distance(PSD)of the scheme.Design/methodology/approach–Based on the structure of parallel traction network(referred to as“cable traction network(CTN)”),the power supply modes(PSMs)are divided into cableþdirect PSM and cableþautotransformer(AT)PSM(including Japanese mode,French mode and new mode).Taking cableþJapanese AT PSM as an example,the scheme of long distance power supply for CTN under the PSMs of co-phase and out-of-phase power supply are designed.On the basis of establishing the equivalent circuit model and the chain circuit model of CTN,taking the train working voltage as the constraint condition,and based on the power flow calculation of multiple train loads,the calculation formula and process for determining the PSD of CTN are given.The impedance and PSD of CTN under the cableþAT PSM are simulated and analyzed,and a certain line is taken as an example to compare the scheme design.Findings–Results show that the equivalent impedance of CTN under the cableþAT PSM is smaller,and the PSD is about 2.5 times of that under the AT PSM,which can effectively increase the PSD and the flexibility of external power supply location.Originality/value–The research content can effectively improve the PSD of traction power supply system and has important reference value for the engineering application of the scheme.展开更多
To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cas...To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.展开更多
文摘Based on the general methods in power flow calculation of power system and on conceptions and classifications of parallel algorithm, a new approach named Dynamic Asynchronous Parallel Algorithm that applies to the online analysis and real-time dispatching and controlling of large-scale power network was put forward in this paper. Its performances of high speed and dynamic following have been verified on IEEE-14 bus system.
基金This work was partly supported by the Technology Project of State Grid Jiangsu Electric Power Co.,Ltd.,China,under Grant No.J2022095.
文摘Power flow calculation is the basis of power grid planning and many system analysis tasks require convergent power flow conditions.To address the unsolvable power flow problem caused by the reactive power imbalance,a method for adjusting reactive power flow convergence based on deep reinforcement learning is proposed.The deep reinforcement learning method takes switching parallel reactive compensation as the action space and sets the reward value based on the power flow convergence and reactive power adjustment.For the non-convergence power flow,the 500 kV nodes with reactive power compensation devices on the low-voltage side are converted into PV nodes by node type switching.And the quantified reactive power non-convergence index is acquired.Then,the action space and reward value of deep reinforcement learning are reasonably designed and the adjustment strategy is obtained by taking the reactive power non-convergence index as the algorithm state space.Finally,the effectiveness of the power flow convergence adjustment algorithm is verified by an actual power grid system in a province.
基金supported in part by the National Natural Science Foundation of China(No.52177071).
文摘Medium-voltage distribution systems(MVDSs)mainly consist of a feeder head,lines,distribution transformers,and the equivalent load or power supply interfaced with the distribution transformers.The information of such load or power supply can be measured via the three-wattmeter method(THM)and the two-wattmeter method(TWM).The measurements can be used to perform the control of the power supply and simulate the characteristics of the load,so the models of the load and the power supply need to consider the measurement characteristics.Existing research works on three-phase power flow(PF)just consider the measurement characteristics of THM.Hence,the PF equation of the bus measured via TWM is firstly built.Based on conventional measurements,an accurate and general model of the grounded and ungrounded slack bus is proposed.Furthermore,the influence arising from the connection type and angle shift of distribution transformers on the admittance matrix is considered,and thus a general three-phase transformer model is summarized,which is applicable for all the transformers mentioned herein.Finally,Newton's method is adopted to solve the PF calculation,and the performance of the proposed PF model is demonstrated through designed tests.
基金supported by the State Grid Science&Technology Project of China(5400-202224153A-1-1-ZN).
文摘Expanding photovoltaic(PV)resources in rural-grid areas is an essential means to augment the share of solar energy in the energy landscape,aligning with the“carbon peaking and carbon neutrality”objectives.However,rural power grids often lack digitalization;thus,the load distribution within these areas is not fully known.This hinders the calculation of the available PV capacity and deduction of node voltages.This study proposes a load-distribution modeling approach based on remote-sensing image recognition in pursuit of a scientific framework for developing distributed PV resources in rural grid areas.First,houses in remote-sensing images are accurately recognized using deep-learning techniques based on the YOLOv5 model.The distribution of the houses is then used to estimate the load distribution in the grid area.Next,equally spaced and clustered distribution models are used to adaptively determine the location of the nodes and load power in the distribution lines.Finally,by calculating the connectivity matrix of the nodes,a minimum spanning tree is extracted,the topology of the network is constructed,and the node parameters of the load-distribution model are calculated.The proposed scheme is implemented in a software package and its efficacy is demonstrated by analyzing typical remote-sensing images of rural grid areas.The results underscore the ability of the proposed approach to effectively discern the distribution-line structure and compute the node parameters,thereby offering vital support for determining PV access capability.
基金funded by Youth Science Foundation Fund Project of National Natural Science Foundation of China(51607148)Science and Technology R&D Program of China State Railway Group Co.,Ltd.(SY2020G001)Project of Sichuan Science and Technology Program(2021YJ0028)。
文摘Purpose–The traction cable is paralleled with the existing traction network of electrified railway through transverse connecting line to form the scheme of long distance power supply for the traction network.This paper aims to study the scheme composition and power supply distance(PSD)of the scheme.Design/methodology/approach–Based on the structure of parallel traction network(referred to as“cable traction network(CTN)”),the power supply modes(PSMs)are divided into cableþdirect PSM and cableþautotransformer(AT)PSM(including Japanese mode,French mode and new mode).Taking cableþJapanese AT PSM as an example,the scheme of long distance power supply for CTN under the PSMs of co-phase and out-of-phase power supply are designed.On the basis of establishing the equivalent circuit model and the chain circuit model of CTN,taking the train working voltage as the constraint condition,and based on the power flow calculation of multiple train loads,the calculation formula and process for determining the PSD of CTN are given.The impedance and PSD of CTN under the cableþAT PSM are simulated and analyzed,and a certain line is taken as an example to compare the scheme design.Findings–Results show that the equivalent impedance of CTN under the cableþAT PSM is smaller,and the PSD is about 2.5 times of that under the AT PSM,which can effectively increase the PSD and the flexibility of external power supply location.Originality/value–The research content can effectively improve the PSD of traction power supply system and has important reference value for the engineering application of the scheme.
基金the State Grid Zhejiang Electric Power Co.,Ltd.(Science and Technology Project under Grant 5211JH180081:Research on security evaluation and control technology of smart platform based on dispatch cloud.)。
文摘To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.