Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for elec...Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for electricity generation by using timber and wood waste (T & WW) gasification in Iceland. Different expenses were considered, like capital, installation, engineering, operation and maintenance costs and the interest rate of the investment. Regarding to revenues, they come from of the electricity sale and the fee paid by the Icelandic municipalities for waste collection and disposal. The economic feasibility was conducted based on the economic indicators of net present value (NPV) and discounted payback period (DPP), bringing together three different subgroups based on gasifier capacities, subgroup a: 50 kW, subgroup b: 100 kW and subgroup c: 200 kW. The results show that total cost increases as the implemented power is increased. This indicator varies from 1228.6 k€ for subgroups a to 1334.7 k€ for subgroups b and 1479.5 k€ for subgroups c. It is worth mentioning that NPV is positive for three subgroups and it grows as gasifier scale is extended. NPV is about 122 k€ (111,020 $), 1824 k€ (1,659,840 $) and 4392 k€ (3,996,720 $) for subgroups a, b and c, respectively. Moreover, DPP has an inversely proportional to the installed capacity. It is around 5.5 years (subgroups a), 9.5 months (subgroups b) and 6 months (subgroups c). The obtained results confirm that using small scale waste biomass gasification integrated with power generation could be techno-economically feasible for remote area in Iceland.展开更多
This paper, excerpted from General President Gao Yan’s Speech on the State Power Corporation Working Conference for 2001, held in Shenzhen on December 23-25, 2000, reviews the power production and construction tasks ...This paper, excerpted from General President Gao Yan’s Speech on the State Power Corporation Working Conference for 2001, held in Shenzhen on December 23-25, 2000, reviews the power production and construction tasks in 2000 and puts forward the major targets and focal tasks of power production and construction for 2001.展开更多
The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably...The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China, Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project’s dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.展开更多
文摘Energy recovery from waste biomass can have significant impacts on the most pressing development challenges of rural poverty and environmental damages. In this paper, a techno-economic analysis is carried out for electricity generation by using timber and wood waste (T & WW) gasification in Iceland. Different expenses were considered, like capital, installation, engineering, operation and maintenance costs and the interest rate of the investment. Regarding to revenues, they come from of the electricity sale and the fee paid by the Icelandic municipalities for waste collection and disposal. The economic feasibility was conducted based on the economic indicators of net present value (NPV) and discounted payback period (DPP), bringing together three different subgroups based on gasifier capacities, subgroup a: 50 kW, subgroup b: 100 kW and subgroup c: 200 kW. The results show that total cost increases as the implemented power is increased. This indicator varies from 1228.6 k€ for subgroups a to 1334.7 k€ for subgroups b and 1479.5 k€ for subgroups c. It is worth mentioning that NPV is positive for three subgroups and it grows as gasifier scale is extended. NPV is about 122 k€ (111,020 $), 1824 k€ (1,659,840 $) and 4392 k€ (3,996,720 $) for subgroups a, b and c, respectively. Moreover, DPP has an inversely proportional to the installed capacity. It is around 5.5 years (subgroups a), 9.5 months (subgroups b) and 6 months (subgroups c). The obtained results confirm that using small scale waste biomass gasification integrated with power generation could be techno-economically feasible for remote area in Iceland.
文摘This paper, excerpted from General President Gao Yan’s Speech on the State Power Corporation Working Conference for 2001, held in Shenzhen on December 23-25, 2000, reviews the power production and construction tasks in 2000 and puts forward the major targets and focal tasks of power production and construction for 2001.
文摘The Three Gorges Hydropower Plant is the one with the largest installed capacity in the world today and has a decisive and important influence upon the security of the national power grids. It has been operated stably and supplied the East China, Central China, South China, Sichuan and Chongqing with clean renewable energy. This paper presents the management of the project’s dispatch, operation and maintenance and puts forward new ideas and new methods for the plant management, which may provide valuable references for the operation of oversized hydropower plants.