期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
ANALYSIS OF CRITERIA PREDICTING THE TENDENCY OF PILOT INDUCED OSCILLATION FOR LINEAR NON-LINEAR SYSTEM
1
作者 Rieutord E 《Chinese Journal of Aeronautics》 SCIE EI CAS CSCD 1991年第2期214-225,共12页
Some problems encountered in applying Smith's technique to predict the PIO tendency for non-linear pilot-vehicle loop, are thoroughly analyzed. Subsequently, modified PIO predictable criteria are developed, in add... Some problems encountered in applying Smith's technique to predict the PIO tendency for non-linear pilot-vehicle loop, are thoroughly analyzed. Subsequently, modified PIO predictable criteria are developed, in addition, to make also a certain improvement on Smith's PIO definition and PIO types. These modified criteria are applied to predict PIO tendency of various different configurations on the variable stability aircraft NT-33 in case of supposed non-linearity, and predicted results are compared with the flight tests and analytical results in the case of linear hypothesis given in Ref. (4) 展开更多
关键词 PIO ANALYSIS OF criteria PREDICTING THE TENDENCY OF PILOT INDUCED OSCILLATION FOR LINEAR NON-LINEAR SYSTEM CYCLE
下载PDF
Forward indifference valuation for dynamically incoming projects
2
作者 Haoran Wang 《Probability, Uncertainty and Quantitative Risk》 2024年第2期219-234,共16页
Classical indifference valuation,a widely studied approach in incomplete markets,uses critically the a priori knowledge of the characteristics(arrival,maturity,payoff structure)of the projects in consideration.This as... Classical indifference valuation,a widely studied approach in incomplete markets,uses critically the a priori knowledge of the characteristics(arrival,maturity,payoff structure)of the projects in consideration.This assumption,however,may not accommodate realistic scenarios in which projects,not initially anticipated,arrive at later times.To accommodate this,we employ forward indifference valuation criteria,which by construction are flexible enough to adapt to such"non-anticipated"cases while yielding time-consistent indifference prices.We consider and analyze in detail two representative cases:valuation adjustments due to incoming non-anticipated project and the relative forward indifference valuation of new projects in relation to existing ones. 展开更多
关键词 Forward indifference valuation Dynamically incoming projects Indifference pricing Relative forward indifference valuation Predictable forward criteria Adaptive forward criteria Risk decomposition
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部