期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Load compensation research on twicetension for loop anchor cable of inner lining in Yellow River-crossing tunnel 被引量:3
1
作者 Yin Juan Cao Shengrong +1 位作者 Qin Gan Yang Fan 《Engineering Sciences》 EI 2014年第1期77-86,共10页
The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loo... The load compensation equipment for anchor cable named low retraction prestressed anchorage system with twice-tension(referred to as twice-tension anchorage system) is proposed in the paper. Calculation results of loop anchorage prestressing loss(PL) values of inner lining(IL)in Yellow River-crossing tunnel under two anchorage systems,including twice- tension anchorage system and HM(Chinese transliteration is huanmao)anchorage system,are introduced. The software ANSYS is selected to realize the three-dimensional(3D) finite element modeling to accomplish simulation and calculation works under the two anchorage systems,respectively. Stress processes of IL under the two working conditions,of which one is completed cable tensioning(CCT) and the other is water in the tunnel with the designed water pressure(DWP),are contrasted and analyzed. Impacts of prestressing forces of anchor cables on structural safety under the two anchorage systems are contrasted. The calculation results show that the twice-tension anchorage system can reduce PL effectively and then increase prestresses of wall concrete(WC). Meanwhile,the anchorage system has the advantages of improving security and stability of tunnel structure,reducing project costs and saving steel consumption. The research work is available to related design and construction of anchor cable,and is worthy of promotion and application. 展开更多
关键词 loop anchorage prestressing loss twice-tension load compensation nonlinear finite element Yellow River-crossing tunnel
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部