As the market competition of steel mills is severe,deoxidization alloying is an important link in the metallurgical process.To solve this problem,principal component regression analysis is adopted to reduce the dimens...As the market competition of steel mills is severe,deoxidization alloying is an important link in the metallurgical process.To solve this problem,principal component regression analysis is adopted to reduce the dimension of influencing factors,and a reasonable and reliable prediction model of element yield is established.Based on the constraint conditions such as target cost function constraint,yield constraint and non-negative constraint,linear programming is adopted to design the lowest cost batting scheme that meets the national standards and production requirements.The research results provide a reliable optimization model for the deoxidization and alloying process of steel mills,which is of positive significance for improving the market competitiveness of steel mills,reducing waste discharge and protecting the environment.展开更多
The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (...The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (UER) and multivariate linear regression (MLR) were used in this study. Loading equipment parameters such as bucket capacity, machine weight, engine power, boom length, digging depth, and dumping height were considered as variables. The results obtained by models and mean absolute error rate indicate that these models can be applied as the useful tool in determination of overhaul and maintenance cost of loading equipment. The results of this study can be used by the decision-makers for the specific surface mining operations.展开更多
文摘As the market competition of steel mills is severe,deoxidization alloying is an important link in the metallurgical process.To solve this problem,principal component regression analysis is adopted to reduce the dimension of influencing factors,and a reasonable and reliable prediction model of element yield is established.Based on the constraint conditions such as target cost function constraint,yield constraint and non-negative constraint,linear programming is adopted to design the lowest cost batting scheme that meets the national standards and production requirements.The research results provide a reliable optimization model for the deoxidization and alloying process of steel mills,which is of positive significance for improving the market competitiveness of steel mills,reducing waste discharge and protecting the environment.
文摘The purpose of this research was to develop a new approach in determination of overhaul and maintenance cost of loading equipment in surface mining. Two statistical models including univariate exponential regression (UER) and multivariate linear regression (MLR) were used in this study. Loading equipment parameters such as bucket capacity, machine weight, engine power, boom length, digging depth, and dumping height were considered as variables. The results obtained by models and mean absolute error rate indicate that these models can be applied as the useful tool in determination of overhaul and maintenance cost of loading equipment. The results of this study can be used by the decision-makers for the specific surface mining operations.