According to the demands for rapid and accurate burdening system, an automation forage burdening system was designed using a programmable logic controller (PLC) as the main controller. The communication between PLC ...According to the demands for rapid and accurate burdening system, an automation forage burdening system was designed using a programmable logic controller (PLC) as the main controller. The communication between PLC and force control was achieved by485 bus. This system have many functions such as recipe setup, burdening control, feed mixture, report printing, and remote alarm. The remote surveillance and control of burdening system were realized. The practice shows that the system had high precision and short cycle, and great control effect was obtained.展开更多
This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure...This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure in automated metro railways system operator and integrate the information coming from Operational Control Centre(OCC),traction SCADA system,traction power control,and power supply system.This work presents a simulated prototype of an automated metro train system operator that uses PLC and SCADA for the real time monitoring and control of the metro railway systems.Here,SCADA is used for the visualization of an automated process operation and then the whole opera-tion is regulated with the help of PLC.The PLC used in this process is OMRON(NX1P2-9024DT1)and OMRON’s Sysmac studio programming software is used for developing the ladder logic of PLC.The metro railways system has deployed infrastructure based on SCADA from the power supply system,and each station’s traction power control is connected to the OCC remotely which commands all of the stations and has the highest command priority.An alarm is triggered in the event of an emergency or system congestion.This proposed system overcomes the drawbacks of the current centralized automatic train control(CATC)system.This system provides prominent benefits like augmenting services which may enhance a network’s full load capacity and networkflexibility,which help in easy modification in the existing program at any time.展开更多
基金supported by the Natural Science Foundation of Ningxia province under grant No. NZ1151
文摘According to the demands for rapid and accurate burdening system, an automation forage burdening system was designed using a programmable logic controller (PLC) as the main controller. The communication between PLC and force control was achieved by485 bus. This system have many functions such as recipe setup, burdening control, feed mixture, report printing, and remote alarm. The remote surveillance and control of burdening system were realized. The practice shows that the system had high precision and short cycle, and great control effect was obtained.
文摘This paper proposes to adopt SCADA and PLC technology for the improvement of the performance of real time signaling&train control systems in metro railways.The main concern of this paper is to minimize the failure in automated metro railways system operator and integrate the information coming from Operational Control Centre(OCC),traction SCADA system,traction power control,and power supply system.This work presents a simulated prototype of an automated metro train system operator that uses PLC and SCADA for the real time monitoring and control of the metro railway systems.Here,SCADA is used for the visualization of an automated process operation and then the whole opera-tion is regulated with the help of PLC.The PLC used in this process is OMRON(NX1P2-9024DT1)and OMRON’s Sysmac studio programming software is used for developing the ladder logic of PLC.The metro railways system has deployed infrastructure based on SCADA from the power supply system,and each station’s traction power control is connected to the OCC remotely which commands all of the stations and has the highest command priority.An alarm is triggered in the event of an emergency or system congestion.This proposed system overcomes the drawbacks of the current centralized automatic train control(CATC)system.This system provides prominent benefits like augmenting services which may enhance a network’s full load capacity and networkflexibility,which help in easy modification in the existing program at any time.