This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnair...This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural design institutes selected radomly from the altogether 59 ones in Shenzhen, P. R. China, and received 130 valid questionnaires. We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trus~ is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.展开更多
A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in mult...A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in multi-projects of chemical engineering design are analyzed. Then based on theories of project management, process management, and knowledge management, a process-oriented knowledge-sharing platform is proposed. The platform has three characteristics: knowledge is divided into professional knowledge and project management knowledge; knowledge sharing is integrated with the project process, which makes knowledge sharing a necessary part of the project process and ensures the quantity of knowledge shared; the platform provides quantitative measurements of incentive mechanisms for knowledge providers and users which ensures the quality of knowledge shared. This knowledge-sharing platform uses two knowledge management tools, a knowledge map and a knowledge base, to support the platform.展开更多
The development history of the project design of spaceflight launching site in China and the main forms used in these designs were introduced in this thesis, and it was pointed out that the spaceflight launch should n...The development history of the project design of spaceflight launching site in China and the main forms used in these designs were introduced in this thesis, and it was pointed out that the spaceflight launch should not use only one fixed model. According to its nation condition, China should design and build the launching project facility and device which correspond to the technology development of spacecraft and carrier rocket.展开更多
A design project was used in junior level mechanical design course to challenge the students' creativity skills. Beside the theoretical foundation of the course subject, the students were introduced to several profes...A design project was used in junior level mechanical design course to challenge the students' creativity skills. Beside the theoretical foundation of the course subject, the students were introduced to several professional skills such as: decision making tools, technical review meetings, interaction with customers, and teamwork skills. The design challenge was to develop a bike rack to meet a list of technical and marketing constraints. Details of the project requirements are presented with a brief overview of the main project mentoring tools. Students' creativity is discussed through two samples of the student work. It was noticed that, the basic creativity skills of the students can be improved by using some of the training tools, however, the students vary in their response to this training.展开更多
Objectives and benefi ts of the project Flood control The Three Gorges Project (TGP) is a key project to the harnessing and development of the Yangtze River. The damsite is located at
Northwest Electric Power Design Institute (NWEPDI)was established in 1956. The institute undertakes the engineering exploration, survey and design of thermal electric power plant, conventional island of nuclear power ...Northwest Electric Power Design Institute (NWEPDI)was established in 1956. The institute undertakes the engineering exploration, survey and design of thermal electric power plant, conventional island of nuclear power plant, power transmission and substation projects, design of the 1st and 2nd class pressure vessels, electric power system planning, environmental protection engineering monitoring, assessment and design, various industrial and civil architectural design and the scicntific research and technical development tasks of corresponding specialities. The institute展开更多
The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV ov...The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV overhead transmission line in China.Study on key technologies and design schemes shall be carried out to ascertain the technical principles and construction standards for project construction,which are presented in this paper based on the Southeast Shanxi-Nanyang-Jingmen test and demonstration transmission line.A comparison and analysis of technical data and economic indices between UHV line and other lines are also described.展开更多
On the afternoon of Aug.24th,Aurelien Lecour,an ex-senior designer of the famous brand ONLY,appears at a news conference in Shanghai to attend signing ceremony for his design consulting service project with
In architecture,interlace structural concept is considered as a new design approach for cosmopolitan cities with high density to minimize the land use and increase the interaction.With various architectural approach,l...In architecture,interlace structural concept is considered as a new design approach for cosmopolitan cities with high density to minimize the land use and increase the interaction.With various architectural approach,land resources can be minimized by this interlace concept for residential complexes.Such buildings will eliminate the reduction of land resource problem and on the other side safety measures in structural design is incorporated by interlace concept of buildings.This new concept can be constructed steel or reinforced concrete.In this paper,an analytical approach has been presented for these buildings in architecture and structural design.In the research,design considerations were taken for interlaced structures with reinforced concrete and steel.Components of steel structure,isolated footing,and columns.This paper is presenting a step wise process for interlaced structures.They are identification of project area,layout and model preparation,analysis and design of concrete interlaced structure,analysis and design of steel interlaced structure,drafting of the plans and costing and estimation of the structures.Comparison of both reinforced concrete and steel structures were carried out.The main aim of the paper is to provide a comparison between steel and concrete interlaced structure.A cost estimation was carried out to determine optimum design and construction for interlaced structures.展开更多
Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking...Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking place in the Nazilli irrigation system with an area of 1165 ha is the only system where all planned activities have been completed. It has been determined that the drainage system was constructed according to original drainage project. The depth of accumulated sediment in the drainage canals in the research area was determined from the difference between the measured elevation and the elevation given in the design projects. The reasons for siltation in the D-25 drainage canal group have been studied by looking at the results of the elevation measurements made in 2010-2012. The measurements made in D-25 drainage canal group showed that there were significant differences between the actual structure (bridge, culvert, and conduit) bottom elevations and the elevations given in the design projects. In addition, the length of some canals would not coincide with the design project either. 83.3% (93.3% in length) of the canals had differences in structure bottom elevations. Of the total 55 structures 45 (81.8%) had a 0.10 m or more difference in bottom elevation from the project. Of the erroneous structures 73.3% had an average of 0.40 m, and 26.7% had an average of -0.25 m difference in bottom elevations from the design projects.展开更多
The DFI-1 gas South China Sea, contains thus there is great concern field, located in the western a high concentration of CO2, about the need to reduce the CO2 emissions. Many options have been considered in recent ye...The DFI-1 gas South China Sea, contains thus there is great concern field, located in the western a high concentration of CO2, about the need to reduce the CO2 emissions. Many options have been considered in recent years to dispose of the CO2 separated from the natural gas stream on the Hainan Island. In this study, the feasibility of CO2 storage in the lateral saline aquifer of the DF 1-1 gas field is assessed, including aquifer selection and geological assessment, CO2 migration and storage safety, project design, and economic analysis. Six offshore aquifers have been investigated for CO2 geological storage. The lateral aquifer of the DFI-1 gas field has been selected as the best target for CO2 injection and storage because of its proven sealing ability, and the large storage capacity of the combined aquifer and hydrocarbon reservoir geological structure. The separated CO2 will be dehydrated on the Hainan Island and transported by a long- distance subsea pipeline in supercritical or liquid state to the central platform of the DFI-1 gas field for pressure adjustment. The CO2 will then be injected into the lateral aquifer via a subsea well-head through a horizontal well. Reservoir simulations suggest that the injected CO2 will migrate slowly upwards in the aquifer without disturbing the natural gas production. The scoping economic analysis shows that the unit storage cost of the project is approximately US$26-31/ton CO2 with the subsea pipe- line as the main contributor to capital expenditure (CAPEX), and the dehydration system as the main factor of operating expenditure (OPEX).展开更多
基金Funded by the R & D Project of the Ministry of Construction of China.
文摘This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural design institutes selected radomly from the altogether 59 ones in Shenzhen, P. R. China, and received 130 valid questionnaires. We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trus~ is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.
基金The National Natural Science Foundation of China (No.70501030,70621001)Natural Science Foundation of Beijing (No.9073020)
文摘A process-oriented knowledge-sharing platform is studied to improve knowledge sharing and project management of chemical engineering design enterprises. First, problems and characteristics of knowledge sharing in multi-projects of chemical engineering design are analyzed. Then based on theories of project management, process management, and knowledge management, a process-oriented knowledge-sharing platform is proposed. The platform has three characteristics: knowledge is divided into professional knowledge and project management knowledge; knowledge sharing is integrated with the project process, which makes knowledge sharing a necessary part of the project process and ensures the quantity of knowledge shared; the platform provides quantitative measurements of incentive mechanisms for knowledge providers and users which ensures the quality of knowledge shared. This knowledge-sharing platform uses two knowledge management tools, a knowledge map and a knowledge base, to support the platform.
文摘The development history of the project design of spaceflight launching site in China and the main forms used in these designs were introduced in this thesis, and it was pointed out that the spaceflight launch should not use only one fixed model. According to its nation condition, China should design and build the launching project facility and device which correspond to the technology development of spacecraft and carrier rocket.
文摘A design project was used in junior level mechanical design course to challenge the students' creativity skills. Beside the theoretical foundation of the course subject, the students were introduced to several professional skills such as: decision making tools, technical review meetings, interaction with customers, and teamwork skills. The design challenge was to develop a bike rack to meet a list of technical and marketing constraints. Details of the project requirements are presented with a brief overview of the main project mentoring tools. Students' creativity is discussed through two samples of the student work. It was noticed that, the basic creativity skills of the students can be improved by using some of the training tools, however, the students vary in their response to this training.
文摘Objectives and benefi ts of the project Flood control The Three Gorges Project (TGP) is a key project to the harnessing and development of the Yangtze River. The damsite is located at
文摘Northwest Electric Power Design Institute (NWEPDI)was established in 1956. The institute undertakes the engineering exploration, survey and design of thermal electric power plant, conventional island of nuclear power plant, power transmission and substation projects, design of the 1st and 2nd class pressure vessels, electric power system planning, environmental protection engineering monitoring, assessment and design, various industrial and civil architectural design and the scicntific research and technical development tasks of corresponding specialities. The institute
文摘The UHVAC 1 000-kV transmission system is so far the one with the most advanced transmission technique applied and highest operation voltage.There are no guidelines or standards available for the design of 1 000-kV overhead transmission line in China.Study on key technologies and design schemes shall be carried out to ascertain the technical principles and construction standards for project construction,which are presented in this paper based on the Southeast Shanxi-Nanyang-Jingmen test and demonstration transmission line.A comparison and analysis of technical data and economic indices between UHV line and other lines are also described.
文摘On the afternoon of Aug.24th,Aurelien Lecour,an ex-senior designer of the famous brand ONLY,appears at a news conference in Shanghai to attend signing ceremony for his design consulting service project with
文摘In architecture,interlace structural concept is considered as a new design approach for cosmopolitan cities with high density to minimize the land use and increase the interaction.With various architectural approach,land resources can be minimized by this interlace concept for residential complexes.Such buildings will eliminate the reduction of land resource problem and on the other side safety measures in structural design is incorporated by interlace concept of buildings.This new concept can be constructed steel or reinforced concrete.In this paper,an analytical approach has been presented for these buildings in architecture and structural design.In the research,design considerations were taken for interlaced structures with reinforced concrete and steel.Components of steel structure,isolated footing,and columns.This paper is presenting a step wise process for interlaced structures.They are identification of project area,layout and model preparation,analysis and design of concrete interlaced structure,analysis and design of steel interlaced structure,drafting of the plans and costing and estimation of the structures.Comparison of both reinforced concrete and steel structures were carried out.The main aim of the paper is to provide a comparison between steel and concrete interlaced structure.A cost estimation was carried out to determine optimum design and construction for interlaced structures.
文摘Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking place in the Nazilli irrigation system with an area of 1165 ha is the only system where all planned activities have been completed. It has been determined that the drainage system was constructed according to original drainage project. The depth of accumulated sediment in the drainage canals in the research area was determined from the difference between the measured elevation and the elevation given in the design projects. The reasons for siltation in the D-25 drainage canal group have been studied by looking at the results of the elevation measurements made in 2010-2012. The measurements made in D-25 drainage canal group showed that there were significant differences between the actual structure (bridge, culvert, and conduit) bottom elevations and the elevations given in the design projects. In addition, the length of some canals would not coincide with the design project either. 83.3% (93.3% in length) of the canals had differences in structure bottom elevations. Of the total 55 structures 45 (81.8%) had a 0.10 m or more difference in bottom elevation from the project. Of the erroneous structures 73.3% had an average of 0.40 m, and 26.7% had an average of -0.25 m difference in bottom elevations from the design projects.
文摘The DFI-1 gas South China Sea, contains thus there is great concern field, located in the western a high concentration of CO2, about the need to reduce the CO2 emissions. Many options have been considered in recent years to dispose of the CO2 separated from the natural gas stream on the Hainan Island. In this study, the feasibility of CO2 storage in the lateral saline aquifer of the DF 1-1 gas field is assessed, including aquifer selection and geological assessment, CO2 migration and storage safety, project design, and economic analysis. Six offshore aquifers have been investigated for CO2 geological storage. The lateral aquifer of the DFI-1 gas field has been selected as the best target for CO2 injection and storage because of its proven sealing ability, and the large storage capacity of the combined aquifer and hydrocarbon reservoir geological structure. The separated CO2 will be dehydrated on the Hainan Island and transported by a long- distance subsea pipeline in supercritical or liquid state to the central platform of the DFI-1 gas field for pressure adjustment. The CO2 will then be injected into the lateral aquifer via a subsea well-head through a horizontal well. Reservoir simulations suggest that the injected CO2 will migrate slowly upwards in the aquifer without disturbing the natural gas production. The scoping economic analysis shows that the unit storage cost of the project is approximately US$26-31/ton CO2 with the subsea pipe- line as the main contributor to capital expenditure (CAPEX), and the dehydration system as the main factor of operating expenditure (OPEX).