期刊文献+
共找到531篇文章
< 1 2 27 >
每页显示 20 50 100
Wind-sand flow simulation and radius optimization of highway embankment under different vertical curve radius
1
作者 LI Liangying LI Qi +2 位作者 WANG Xu XIN Guowei WANG Zhenqiang 《Journal of Mountain Science》 SCIE CSCD 2024年第8期2533-2546,共14页
It is of great practical value to explore the correlation between the vertical curve radius of desert highway and the increase of sand accumulation in local lines,and to select the appropriate vertical curve radius fo... It is of great practical value to explore the correlation between the vertical curve radius of desert highway and the increase of sand accumulation in local lines,and to select the appropriate vertical curve radius for reducing the risk of sand accumulation.In this study,three-dimensional models of desert highway embankments with different vertical curve radii were constructed,and Fluent software was used to simulate the wind-sand flow field and sand accumulation distribution of vertical curve embankments.The results show that:(1)Along the direction of the road,the concave and the convex vertical curve embankments have the effect of collecting and diverging the wind-sand flow,respectively.When the radius of the concave vertical curve is 3000 m,5000 m,8000 m,10000 m and 20000 m,the wind velocity in the middle of the vertical curve is 31.76%,22.58%,10.78%,10.53%and 10.44%,higher than that at both ends.When the radius of the convex vertical curve is 6500 m,8000 m,10000 m,20000 m and 30000 m,the wind velocity at both ends of the vertical curve is 14.06%,9.99%,6.14%,3.22%and 2.41%,higher than that in the middle.The diversion effect also decreases with the increase of the radius.(2)The conductivity of the concave and convex vertical curve embankments with different radii is greater than 1,which is the sediment transport roadbed.The conductivity increases with the increase of radius and gradually tends to be stable.When the radius of the concave and convex vertical curves reaches 8000 m and 20000 m respectively,the phenomenon of sand accumulation is no longer serious.Under the same radius condition,the concave vertical curve embankment is more prone to sand accumulation than the convex one.(3)Considering the strength of the collection and diversion of the vertical curve embankment with different radii,and the sand accumulation of the vertical curve embankment in the desert section of Wuma Expressway,the radius of the concave vertical curve is not less than 8000 m,and the radius of the convex vertical curve is not less than 20000 m,which can effectively reduce the sand accumulation of the vertical curve embankment.In the desert highway area,the research results of this paper can provide reference for the design of vertical curve to ensure the safe operation of desert highway. 展开更多
关键词 highway engineering Vertical curve Numerical simulation Embankment wind-sand flow Radius optimization
下载PDF
Cost Control Strategies for Hubei General Highway Greening Project
2
作者 ZHANG Qian HUANG Yaojun AN Yunhua 《Journal of Landscape Research》 2024年第4期17-20,共4页
In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect ... In order to respond to the national policy of focusing on the service of building a new development pattern and promoting high-quality development,and to reduce the cost of greening projects while ensuring the effect of highway landscape,a process and cost control points of highway greening design,construction,and maintenance are summarized through a review of the literature.Additionally,this paper examines the attributes of highway greening and proposes cost control strategies that are aligned with these attributes.It is proposed that the implementation of cost control strategies for highway greening should commence at the project establishment phase,with the objective of establishing a comprehensive and effective cost management control system.While guaranteeing the greening landscape effect and the duration of the project,it is essential to regulate the crucial nodes in each phase of the design,construction,and maintenance process.Furthermore,it is vital to facilitate close collaboration between all parties involved,thereby reducing costs,conserving resources,and lowering energy consumption.This approach can also lead to enhanced economic and social benefits for highway greening projects. 展开更多
关键词 General highway highway greening Greening project Cost control
下载PDF
Atmospheric Sulfur and Nitrogen Deposition in Five Nature Reserves of Sichuan Basin to Qinghai-Tibetan Plateau Transect Region,Southwest-ern China
3
作者 XU Zhongjun SHU Xi +5 位作者 YANG Han FU Liqiang LIU Tingting XIA Zhonglin QIAO Xue TANG Ya 《Chinese Geographical Science》 SCIE CSCD 2024年第6期1060-1072,共13页
Enhanced sulfur and nitrogen deposition has been observed in many transect regions worldwide,from urban/agricultural areas to mountains.The Sichuan Basin(SCB),with 18 prefectural cities,is the most economically-develo... Enhanced sulfur and nitrogen deposition has been observed in many transect regions worldwide,from urban/agricultural areas to mountains.The Sichuan Basin(SCB),with 18 prefectural cities,is the most economically-developed region in western China,while the rural Qinghai-Tibetan Plateau(QTP)lies west of the SCB.Previous regional and national atmospheric modeling studies have sug-gested that large areas in the SCB-to-QTP transect region experience excessive deposition of sulfur and nitrogen.In this study,we ap-plied a passive monitoring method at 1l sites(one in urban Chengdu and 10 from fivenature reserves)in this transect region from September 2021 to October 2022 to confirm the high sulfur and nitrogen deposition fluxes and to understand the gaps between the mod-eling and observation results for this transect region.These observations suggest that the five reserves are under eutrophication risk,and only two reserves are partially under acidification risk.Owing to the complex topography and landscapes,both sulfur and nitrogen de-position and critical loads exhibit large spatial variations within a reserve,such as Mount Emei.Regional atmospheric modeling may not accurately capture the spatial variations in deposition fluxes within a reserve;however,it can capture general spatial patterns over the entire transect.This study demonstrates that a combination of state-of-the-art atmospheric chemical models and low-cost monitoring methods is helpful for ecological risk assessments at a regional scale. 展开更多
关键词 acid deposition ion exchange resin critical load ACIDIFICATION EUTROPHICATION Sichuan Basin to qinghai-tibetan Plateau transect region China
下载PDF
Intelligent Diagnosis of Highway Bridge Technical Condition Based on Defect Information
4
作者 Yanxue Ma Xiaoling Liu +1 位作者 Bing Wang Ying Liu 《Structural Durability & Health Monitoring》 EI 2024年第6期871-889,共19页
In the bridge technical condition assessment standards,the evaluation of bridge conditions primarily relies on the defects identified through manual inspections,which are determined using the comprehensive hierarchica... In the bridge technical condition assessment standards,the evaluation of bridge conditions primarily relies on the defects identified through manual inspections,which are determined using the comprehensive hierarchical analysis method.However,the relationship between the defects and the technical condition of the bridges warrants further exploration.To address this situation,this paper proposes a machine learning-based intelligent diagnosis model for the technical condition of highway bridges.Firstly,collect the inspection records of highway bridges in a certain region of China,then standardize the severity of diverse defects in accordance with relevant specifications.Secondly,in order to enhance the independence between the defects,the key defect indicators were screened using Principal Component Analysis(PCA)in combination with the weights of the building blocks.Based on this,an enhanced Naive Bayesian Classification(NBC)algorithm is established for the intelligent diagnosis of technical conditions of highway bridges,juxtaposed with four other algorithms for comparison.Finally,key defect variables that affect changes in bridge grades are discussed.The results showed that the technical condition level of the superstructure had the highest correlation with cracks;the PCA-NBC algorithm achieved an accuracy of 93.50%of the predicted values,which was the highest improvement of 19.43%over other methods.The purpose of this paper is to provide inspectors with a convenient and predictive information-rich method to intelligently diagnose the technical condition of bridges based on bridge defects.The results of this research can help bridge inspectors and even non-specialists to better understand the condition of bridge defects. 展开更多
关键词 highway bridges DEFECTS Naive Bayesian classification principal component analysis machine learning
下载PDF
Analysis of the Application of Span-Bridge Technology for Building Highway Tunnels that Go Over Solutional Caves
5
作者 Ruiquan Liu 《Journal of World Architecture》 2024年第1期103-107,共5页
This article presents a real engineering project showcasing the application of span-bridge construction technology for building a highway that goes over a solutional cave.An overview of the project and the details of ... This article presents a real engineering project showcasing the application of span-bridge construction technology for building a highway that goes over a solutional cave.An overview of the project and the details of applying this technology in highway construction are provided.Besides,strategies for enhancing its construction quality are also proposed.The objective of this analysis is to improve the safety and quality of similar projects. 展开更多
关键词 highway Span-bridge technology Cave penetration
下载PDF
Site Management Strategy in Highway Project Management
6
作者 Huan Deng 《Journal of Architectural Research and Development》 2024年第3期75-79,共5页
Highway project management involves overseeing the on-site construction of a highway project,taking into account the specific circumstances and conditions of the site.This type of management requires a high level of e... Highway project management involves overseeing the on-site construction of a highway project,taking into account the specific circumstances and conditions of the site.This type of management requires a high level of expertise and is characterized by its dynamic and systematic approach.Effective on-site management can ensure the quality,cost-saving,smooth progress,and safety of highway construction.However,there are still some problems in the implementation of site management in some highway projects,which seriously affect the improvement of site management.This paper analyzes the characteristics and existing problems of highway engineering management,and puts forward the effective strategies of site management,hoping that this study will help to improve highway engineering site management. 展开更多
关键词 highway engineering CHARACTERISTICS PROBLEMS Site management
下载PDF
Application of Earthquake-Proof Design in Highway Bridge Design
7
作者 Meng Wan 《Journal of World Architecture》 2024年第4期1-6,共6页
Highway bridges are an important part of transportation infrastructure.With the rapid development of transportation,the design of bridge construction has received significant attention.The complex environment of some ... Highway bridges are an important part of transportation infrastructure.With the rapid development of transportation,the design of bridge construction has received significant attention.The complex environment of some regions necessitates the selection of seismic design to improve the stability of the structure during the design phase of highway bridge construction.This article briefly discusses bridge structures that may be subject to seismic hazards and analyzes seismic design standards to explore their application in the design process of highway bridges,with the aim of providing support for bridge construction. 展开更多
关键词 Seismic design highway bridges DESIGN
下载PDF
Analysis of the Current Situation of Cost Management and Control of Highway Construction Projects
8
作者 Pei Liu 《Journal of Architectural Research and Development》 2024年第5期30-35,共6页
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma... The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering. 展开更多
关键词 highway engineering Cost management Management status Cost control
下载PDF
Mountain Highway Design Based on New Green Design Concepts
9
作者 Zhuang Hu Yazhou Liu 《Journal of World Architecture》 2024年第2期118-122,共5页
This article analyzes the implementation of new environmentally friendly design practices in the construction of mountain highways.It covers topics such as green highway design concepts,alignment principles,and green ... This article analyzes the implementation of new environmentally friendly design practices in the construction of mountain highways.It covers topics such as green highway design concepts,alignment principles,and green practices specifically for mountainous highway design.This analysis aims to provide useful insights for creating green mountain highways that meet the demands of modern times. 展开更多
关键词 Mountainous areas highwayS Green design concepts
下载PDF
Settlement Control Standards of Construction and Expansion for Mountainous Highway Roadbeds
10
作者 Zhipan Yang Wei Gan Haonan Ding 《Journal of Architectural Research and Development》 2024年第2期43-49,共7页
This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade sett... This article analyzes the differential settlement of new and old roadbeds after widening and its characteristics based on a highway reconstruction and expansion project case study.The research proposes a subgrade settlement control standard that states that the maximum differential settlement value should be less than 5 cm when the embankment fill height exceeds 20 m.Similarly,the maximum differential settlement value should be less than 10 cm when the embankment fill height does not exceed 20 m.The findings of the study can provide a useful reference for the design of roadbed widening in highway reconstruction and expansion projects. 展开更多
关键词 Mountainous highway Reconstruction and expansion Roadbed widening Settlement control
下载PDF
Application Strategies of BIM Technology in Highway Electromechanical Engineering
11
作者 Li Liu 《Journal of World Architecture》 2024年第2期123-128,共6页
The transportation system is vital for social and economic development.With the rapid economic development,the demand for highways has been increasing.Mechanical and electrical engineering is a crucial part of highway... The transportation system is vital for social and economic development.With the rapid economic development,the demand for highways has been increasing.Mechanical and electrical engineering is a crucial part of highway construction,affecting the expressway’s later use.Applying building information modeling(BIM)technology in highway electromechanical engineering allows for the visibility and simulation of mechanical and electrical engineering construction,providing scientific guidance for construction.In this research,the author analyzes the advantages of BIM technology in highway electromechanical engineering and the basic composition of electromechanical engineering.The research proposes strategies and cases for applying BIM technology in highway electromechanical engineering.The ultimate goal of this research is to improve the construction of highways in terms of electromechanical engineering. 展开更多
关键词 BIM technology highway Mechanical and electrical engineering
下载PDF
Cost Control Strategies in the Pre-Construction Period of Highway Construction
12
作者 Chunbo Chen 《Journal of Architectural Research and Development》 2024年第3期104-109,共6页
Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading ... Effective cost control in the investment and design phases of highway construction is crucial for managing project expenses.However,current management practices often overlook pre-construction cost management,leading to budget overruns and project delays during later stages.To ensure the smooth execution and cost control of highway construction projects,this paper examines the significance of cost control,evaluates the current state and challenges of highway construction,and proposes strategies for cost management.These strategies aim to establish a robust foundation for cost management in highway projects. 展开更多
关键词 highway construction Preliminary management Cost control Contract management Investment estimate
下载PDF
Analysis and Comparison of Slope-cutting Widening Schemes in Highway Reconstruction and Expansion Project Based on MIDAS Software
13
作者 Zhiqiang Qiu Yun Shi Lei Jiang 《Journal of Architectural Research and Development》 2024年第2期75-83,共9页
In this paper,the geological condition of the right-side slope of the K114+694–K115+162 section of Yong-tai-wen Expressway is investigated and analyzed with the results showing that the strength of rock mass is the m... In this paper,the geological condition of the right-side slope of the K114+694–K115+162 section of Yong-tai-wen Expressway is investigated and analyzed with the results showing that the strength of rock mass is the main contributor to the stability of the slope.Then,two widening schemes are proposed,which are the steep slope with strong support and the gentle slope with general support schemes.The static/slope module of MIDAS GTS finite element analysis software and the strength reduction method were used to compare the two schemes.The results show that the steep slope with a strong support scheme has obvious advantages in land requisition,environmental protection,and safety and is more suitable for reconstructing and expanding the highway slope. 展开更多
关键词 highway reconstruction and expansion Slope excavation MIDAS GTS Scheme selection
下载PDF
Application Strategies of Shotcrete Anchor Support Technology in Highway Bridge and Tunnel Engineering
14
作者 Ruiquan Liu 《Journal of Architectural Research and Development》 2024年第1期56-61,共6页
This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan for... This article analyzes the application strategies of shotcrete anchor support technology using a highway bridge-tunnel construction project as an example.The article covers various strategies,including support plan formulation,mortar shotcrete anchor construction,grid steel frame construction,steel mesh construction,and concrete support construction.This analysis aims to provide a guideline for those interested in applying this technology and improving the quality and safety of highway bridges and tunnels construction. 展开更多
关键词 highway bridge engineering Tunnel construction Shotcrete support Support plan Support construction
下载PDF
Analysis of Roadbed Pavement Designs for Highway Reconstruction and Upgrading
15
作者 Haonan Ding Zhipan Yang Wei Gan 《Journal of Architectural Research and Development》 2024年第3期93-97,共5页
This paper focuses on the route and roadbed pavement design in highway reconstruction and upgrading projects.It discusses the importance of project design for highway reconstruction and upgrading,highlighting key aspe... This paper focuses on the route and roadbed pavement design in highway reconstruction and upgrading projects.It discusses the importance of project design for highway reconstruction and upgrading,highlighting key aspects of route design and roadbed pavement design.The analysis reveals that the main design considerations in these projects include controlling factors of route reconstruction,expansion,and upgrading,as well as route plan design and longitudinal section design combined with roadbed pavement.In roadbed pavement design,it is crucial for designers to thoroughly collect existing data and make reasonable use of the current roadbed and pavement to develop a comprehensive design scheme.This analysis aims to provide a reference for the reasonable design of such projects. 展开更多
关键词 highway engineering Reconstruction and upgrading design Route design Roadbed and pavement design
下载PDF
Review of Power Supply and Distribution Construction Technology for Highway Electromechanical Engineering
16
作者 Li Liu 《Journal of Electronic Research and Application》 2024年第2期27-32,共6页
In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan... In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology. 展开更多
关键词 highway Mechanical and electrical engineering Power supply and distribution construction technology Construction process
下载PDF
Overall Selection Design Based on the Mega Highway Bridge Project
17
作者 Rongpeng Xu 《Journal of World Architecture》 2024年第4期27-32,共6页
In the continuous development of the modern highway and bridge engineering industry,the reasonable selection of mega highway bridges and their design is crucial.Based on this,this paper takes the actual bridge project... In the continuous development of the modern highway and bridge engineering industry,the reasonable selection of mega highway bridges and their design is crucial.Based on this,this paper takes the actual bridge project as an example,and analyses the overall selection design of such highway bridges,including the basic overview of the project,the basic selection principle of mega highway bridge project structure and its design strategy,etc.,to provide scientific reference for its selection design. 展开更多
关键词 Mega highway bridge Selection principle Selection design for railway crossing Selection design for road crossing
下载PDF
Geohazards and risk assessment along highway in Sichuan Province, China 被引量:2
18
作者 YANG Hong-zhi DONG Jia-yu GUO Xu-liang 《Journal of Mountain Science》 SCIE CSCD 2023年第6期1695-1711,共17页
Geohazards along highways are the main natural hazards that could affect the safety and operation of highway systems.Understanding the risks faced by highways in areas affected by geohazards is an urgent problem to be... Geohazards along highways are the main natural hazards that could affect the safety and operation of highway systems.Understanding the risks faced by highways in areas affected by geohazards is an urgent problem to be solved.This study used historical geohazard events from Sichuan Province and highway network data to propose a geohazard risk index that reflects the risk geohazards along highways.Furthermore,this work applied the entropy method and expert scoring to calculate the weight of the index.The spatial distributions of landslides,debris flows,collapses,and unstable slopes along the highways were analysed based on ArcGIS spatial statistics,and the highway geohazard intensity index were obtained.The relationships between slope,rainfall,vegetation coverage,rock type,land use,and incision depth with geohazards were analysed,and the highway geohazard susceptibility index was calculated by the weighted information method.Based on the intensity and susceptibility index,we obtained a geohazard risk index which can better evaluate the risk of highways,and made a highway geohazard risk map to aid the prevention and mitigation of geohazards along highways and assist with highway network planning. 展开更多
关键词 GEOHAZARDS highway network Geohazard risk index Intensity index SUSCEPTIBILITY
下载PDF
Ground-Based Atmospheric CO_(2),CH_(4),and CO Column Measurements at Golmud in the Qinghai-Tibetan Plateau and Comparisons with TROPOMI/S5P Satellite Observations 被引量:2
19
作者 Minqiang ZHOU Qichen NI +7 位作者 Zhaonan CAI Bavo LANGEROCK Jingyi JIANG Ke CHE Jiaxin WANG Weidong NAN Yi LIU Pucai WANG 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 2023年第2期223-234,共12页
Measurements of carbon dioxide(CO_(2)),methane(CH_(4)),and carbon monoxide(CO)are of great importance in the Qinghai-Tibetan region,as it is the highest and largest plateau in the world affecting global weather and cl... Measurements of carbon dioxide(CO_(2)),methane(CH_(4)),and carbon monoxide(CO)are of great importance in the Qinghai-Tibetan region,as it is the highest and largest plateau in the world affecting global weather and climate systems.In this study,for the first time,we present CO_(2),CH_(4),and CO column measurements carried out by a Bruker EM27/SUN Fourier-transform infrared spectrometer(FTIR)at Golmud(36.42°E,94.91°N,2808 m)in August 2021.The mean and standard deviation of the column-average dry-air mixing ratio of CO_(2),CH_(4),and CO(XCO_(2),XCH_(4),and XCO)are 409.3±0.4 ppm,1905.5±19.4 ppb,and 103.1±7.7 ppb,respectively.The differences between the FTIR co-located TROPOMI/S5P satellite measurements at Golmud are 0.68±0.64%(13.1±12.2 ppb)for XCH_(4) and 9.81±3.48%(–10.7±3.8 ppb)for XCO,which are within their retrieval uncertainties.High correlations for both XCH_(4) and XCO are observed between the FTIR and S5P satellite measurements.Using the FLEXPART model and satellite measurements,we find that enhanced CH_(4) and CO columns in Golmud are affected by anthropogenic emissions transported from North India.This study provides an insight into the variations of the CO_(2),CH_(4),and CO columns in the Qinghai-Tibetan Plateau. 展开更多
关键词 Ground-based FTIR greenhouse gas remote sensing TROPOMI/S5P qinghai-tibetan Plateau
下载PDF
Spatiotemporal variation of ecological environment quality and extreme climate drivers on the Qinghai-Tibetan Plateau 被引量:2
20
作者 SUN Tao YANG Yan-mei +5 位作者 WANG Ze-gen YONG Zhi-wei XIONG Jun-nan MA Guo-li LI Jie LIU Ao 《Journal of Mountain Science》 SCIE CSCD 2023年第8期2282-2297,共16页
Protecting the ecological security of the Qinghai-Tibet Plateau(QTP)is of great importance for global ecology and climate.Over the past few decades,climate extremes have posed a significant challenge to the ecological... Protecting the ecological security of the Qinghai-Tibet Plateau(QTP)is of great importance for global ecology and climate.Over the past few decades,climate extremes have posed a significant challenge to the ecological environment of the QTP.However,there are few studies that explored the effects of climate extremes on ecological environment quality of the QTP,and few researchers have made quantitative analysis.Hereby,this paper proposed the Ecological Environmental Quality Index(EEQI)for analyzing the spatial and temporal variation of ecological environment quality on the QTP from 2000 to 2020,and explored the effects of climate extremes on EEQI based on Geographically and Temporally Weighted Regression(GTWR)model.The results showed that the ecological environment quality in QTP was poor in the west,but good in the east.Between 2000 and 2020,the area of EEQI variation was large(34.61%of the total area),but the intensity of EEQI variation was relatively low and occurred mainly by a slightly increasing level(EEQI change range of 0.05-0.1).The overall ecological environment quality of the QTP exhibited spatial and temporal fluctuations,which may be attributed to climate extremes.Significant spatial heterogeneity was observed in the effects of the climate extremes on ecological environment quality.Specifically,the effects of daily temperature range(DTR),number of frost days(FD0),maximum 5-day precipitation(RX5day),and moderate precipitation days(R10)on ecological environment quality were positive in most regions.Furthermore,there were significant temporal differences in the effects of consecutive dry days(CDD),consecutive wet days(CWD),R10,and FD0 on ecological environment quality.These differences may be attributed to variances in ecological environment quality,climate extremes,and vegetation types across different regions.In conclusion,the impact of climate extremes on ecological environment quality exhibits complex patterns.These findings will assist managers in identifying changes in the ecological environment quality of the QTP and addressing the effects of climate extremes. 展开更多
关键词 Ecological environment quality Extreme climate Geographically and Temporally Weighted Regression qinghai-tibetan Plateau
下载PDF
上一页 1 2 27 下一页 到第
使用帮助 返回顶部