In this study, we reported the repaid construction of a molecular marker linkage map of rice (Oryza sativa L.). An F-2 population from the cross between Annong S-1 and Nanjing 11 was used to construct a genetic linkag...In this study, we reported the repaid construction of a molecular marker linkage map of rice (Oryza sativa L.). An F-2 population from the cross between Annong S-1 and Nanjing 11 was used to construct a genetic linkage map of rice. Total of 142 newly screened AFLP markers and 30 anchor markers (25 SSR markers and 5 RFLP markers) were mapped on the 12 chromosomes covering 1537.4 cM of rice genome. The average interval between these markers was 9.0 cM. The total work which usually was finished in more than one year was finished within only 3 months by one person. This is the first plant AFLP map developed in China. A new thermosensitive genic male sterile gene in rice, tms5, was Egged and mapped onto chromosome 2 during the development of the linkage map.展开更多
The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in...The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.展开更多
A protective layer(PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or th...A protective layer(PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or three thin layers and excavated with the shallow-hole blasting method, even by pneumatic pick method in case of soft rock mass. The aforementioned layered excavation of the PL delays the construction of the whole project. After nearly 30-year practices, several safe and effcient methods for the PL excavation of dam foundation are gradually developed. They include shallow-hole bench blasting with cushion material(SBC) at the bottom of the hole, and horizontal smooth blasting(HSB). The PL is even cancelled on the condition that horizontal pre-split technique is employed during dam foundation excavation. This paper introduces the aforementioned two PL excavation methods(shallow-hole blasting and bench blasting) and horizontal pre-split technique of dam foundation without protective layer(HPP). The basic principles of blasting method, blasting geometry, charge structure, drill-and-blast parameters of typical projects are examined. Meanwhile, the merits and limitations of each method are compared. Engineering practices in China show that HSB is basically the optimal method for dam foundation PL excavation in terms of foundation damage control and rapid construction. Some new problems for dam foundation PL excavation arising, such as strong unloading and relaxation phenomenon that encountered in the gorge region of southwest China, are needed to be addressed; and the corresponding countermeasures are discussed as well.展开更多
In order to further speed up the construction progress,shorten the rolling time and reduce the rolling times of roller compacted concrete after analyzing work of construction progress improvement measures of roller co...In order to further speed up the construction progress,shorten the rolling time and reduce the rolling times of roller compacted concrete after analyzing work of construction progress improvement measures of roller compacted concrete,research on vibration sensitive admixture is carried out and satisfactory results are acquired.The new type vibration sensitive admixture was used in the project of Jinghong hydropower station in Yunnan Province,China.The engineering experimental results show that various indexes have been verified.Meanwhile,the compactness of roller compacted concrete is improved under the same rolling times,the rolling times and the duration time can be reduced under the same compactness requirement in construction practice.展开更多
The microbial molecular ecology techniques, which were developed on the basis of molecular, were applied in studying the bacteria in Constructed Rapid Infiltration (CRI) system. These techniques are very efficient i...The microbial molecular ecology techniques, which were developed on the basis of molecular, were applied in studying the bacteria in Constructed Rapid Infiltration (CRI) system. These techniques are very efficient in better describing the bacterial diversity, microbial community distribution, and relations between microbial group structure and nitrogen contamination through the analysis of microbial nucleic acid sequence fragment in CRI. The results further revealed the removal mechanism of contamination, which is essential for the improvement of wastewater treatment in CRI.展开更多
文摘In this study, we reported the repaid construction of a molecular marker linkage map of rice (Oryza sativa L.). An F-2 population from the cross between Annong S-1 and Nanjing 11 was used to construct a genetic linkage map of rice. Total of 142 newly screened AFLP markers and 30 anchor markers (25 SSR markers and 5 RFLP markers) were mapped on the 12 chromosomes covering 1537.4 cM of rice genome. The average interval between these markers was 9.0 cM. The total work which usually was finished in more than one year was finished within only 3 months by one person. This is the first plant AFLP map developed in China. A new thermosensitive genic male sterile gene in rice, tms5, was Egged and mapped onto chromosome 2 during the development of the linkage map.
基金Project(41202220)supported by the National Natural Science Foundation of ChinaProject(20120022120003)supported by the Research Fund for the Doctoral Program of Higher Education,China+1 种基金Project(2652012065)supported by the Fundamental Research Funds for the Central Universities of ChinaProject(2013006)supported by the Research Fund for Key Laboratory on Deep Geo Drilling Technology,Ministry of Land and Resources,China
文摘The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.
基金supported by the National Science Fund for Distinguished Young Scholars of China(51125037)the National Key Basic Research Program(973 Program) of China(2011CB013501)+1 种基金the National Natural Science Foundation of China(51279135 and 51079111)the Doctoral Scientifc Fund Project of the Ministry of Education of China(20110141110026)
文摘A protective layer(PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or three thin layers and excavated with the shallow-hole blasting method, even by pneumatic pick method in case of soft rock mass. The aforementioned layered excavation of the PL delays the construction of the whole project. After nearly 30-year practices, several safe and effcient methods for the PL excavation of dam foundation are gradually developed. They include shallow-hole bench blasting with cushion material(SBC) at the bottom of the hole, and horizontal smooth blasting(HSB). The PL is even cancelled on the condition that horizontal pre-split technique is employed during dam foundation excavation. This paper introduces the aforementioned two PL excavation methods(shallow-hole blasting and bench blasting) and horizontal pre-split technique of dam foundation without protective layer(HPP). The basic principles of blasting method, blasting geometry, charge structure, drill-and-blast parameters of typical projects are examined. Meanwhile, the merits and limitations of each method are compared. Engineering practices in China show that HSB is basically the optimal method for dam foundation PL excavation in terms of foundation damage control and rapid construction. Some new problems for dam foundation PL excavation arising, such as strong unloading and relaxation phenomenon that encountered in the gorge region of southwest China, are needed to be addressed; and the corresponding countermeasures are discussed as well.
文摘In order to further speed up the construction progress,shorten the rolling time and reduce the rolling times of roller compacted concrete after analyzing work of construction progress improvement measures of roller compacted concrete,research on vibration sensitive admixture is carried out and satisfactory results are acquired.The new type vibration sensitive admixture was used in the project of Jinghong hydropower station in Yunnan Province,China.The engineering experimental results show that various indexes have been verified.Meanwhile,the compactness of roller compacted concrete is improved under the same rolling times,the rolling times and the duration time can be reduced under the same compactness requirement in construction practice.
基金supported by the National Key Project for Basic Research (No. 2007CB815600)the Project of the Ministry of Science and Technology of China (No. 2006BAD25B04)
文摘The microbial molecular ecology techniques, which were developed on the basis of molecular, were applied in studying the bacteria in Constructed Rapid Infiltration (CRI) system. These techniques are very efficient in better describing the bacterial diversity, microbial community distribution, and relations between microbial group structure and nitrogen contamination through the analysis of microbial nucleic acid sequence fragment in CRI. The results further revealed the removal mechanism of contamination, which is essential for the improvement of wastewater treatment in CRI.