Gas content of the hydraulic system directly affects the rate of pressure change of the hydraulic system. The purpose of this paper is to establish a mathematical model of oil gas content, hydraulic system pressure an...Gas content of the hydraulic system directly affects the rate of pressure change of the hydraulic system. The purpose of this paper is to establish a mathematical model of oil gas content, hydraulic system pressure and pressure rise rate, obtain corresponding oil pressure value when the pressure rise rate of different gas content is maximum, and verify the accuracy of this conclusion by the FLUENT simulation software. On this basis, a rapid pressure building device of the hydraulic system is developed and designed. The above oil pressure value is used as the working cut-off pressure of the rapid pressure building device, and then the hydraulic oil pump continues to pressurize to the highest working pressure required by the system. The research content can replace the hydraulic system from the initial low pressure to the rapid pressure build-up of the oil, thus increasing the construction pressure of the hydraulic system. The research results show that the rapid pressure building device effectively reduces the time for the hydraulic system to establish pressure. Through the analysis of theoretical derivation and the collected experimental data, the error is about 5.9%, which verifies the correctness of the theoretical formula.展开更多
基金Support by the National Natural Science Foundation of China(No.51505315)the Program for the Top Young Academic Leaders of Higher Learning Institutions of Shanxi+1 种基金the Collaborative Innovation Center of Taiyuan Heavy Machinery Equipment Fundedthe Fund for Shanxi“1331 Project”Key Subjects Construction
文摘Gas content of the hydraulic system directly affects the rate of pressure change of the hydraulic system. The purpose of this paper is to establish a mathematical model of oil gas content, hydraulic system pressure and pressure rise rate, obtain corresponding oil pressure value when the pressure rise rate of different gas content is maximum, and verify the accuracy of this conclusion by the FLUENT simulation software. On this basis, a rapid pressure building device of the hydraulic system is developed and designed. The above oil pressure value is used as the working cut-off pressure of the rapid pressure building device, and then the hydraulic oil pump continues to pressurize to the highest working pressure required by the system. The research content can replace the hydraulic system from the initial low pressure to the rapid pressure build-up of the oil, thus increasing the construction pressure of the hydraulic system. The research results show that the rapid pressure building device effectively reduces the time for the hydraulic system to establish pressure. Through the analysis of theoretical derivation and the collected experimental data, the error is about 5.9%, which verifies the correctness of the theoretical formula.