Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulatio...Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.展开更多
The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.T...The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.展开更多
This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of i...This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.展开更多
The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To impr...The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.展开更多
The power demand around the world is increasing rapidly.The aging distribution network architectures are used by the existing utility companies to deliver power to the consumers,which significantly affects the reliabi...The power demand around the world is increasing rapidly.The aging distribution network architectures are used by the existing utility companies to deliver power to the consumers,which significantly affects the reliability,stability and quality of the delivered power.Different techniques such as compensation devices have been used by power system engineers and researchers to maintain the quality of power transmitted to end users.In this paper,wattage and volt-amp reactive(VAR)planning scheme has been proposed by using the combination of battery energy storage systems(BESS)and compensators to deal with the vulnerability of networks to voltage drop and system inefficiency.The cost-effective combination of BESS and shunt capacitor bank will then be analyzed to indicate the benefit of the proposed scheme.展开更多
基金Science and Technology Projects of State Grid Corporation of China(No.SGGSKY00FJJS1800140)。
文摘Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.
文摘The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.
文摘This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.
基金supported by the International Postdoctoral Exchange Fellowship Program (Talent-Introduction Program)(No.YJ20210337)the Fundamental Research Funds for the Central Universities (No.2022CDJXY-007)。
文摘The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.
文摘The power demand around the world is increasing rapidly.The aging distribution network architectures are used by the existing utility companies to deliver power to the consumers,which significantly affects the reliability,stability and quality of the delivered power.Different techniques such as compensation devices have been used by power system engineers and researchers to maintain the quality of power transmitted to end users.In this paper,wattage and volt-amp reactive(VAR)planning scheme has been proposed by using the combination of battery energy storage systems(BESS)and compensators to deal with the vulnerability of networks to voltage drop and system inefficiency.The cost-effective combination of BESS and shunt capacitor bank will then be analyzed to indicate the benefit of the proposed scheme.