After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and de...After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and demand in the distribution network,exacerbating the phenomenon of wind and solar power wastage.As a novel power system model,the fundamental concept of Regional Autonomous Power Grids(RAPGs)is to achieve localized management and energy autonomy,thereby facilitating the effective consumption of DGs.Therefore,this paper proposes a distributed resource planning strategy that enhances the autonomy capabilities of regional power grids by considering multiple evaluation indexes for autonomy.First,a regional Energy Storage(ES)configuration strategy is proposed.This strategy can select a suitable reference value for the upper limit of ES configuration based on the regional load andDGoutput to maximize the elimination of source load deviations in the region as the upper limit constraint of ES capacity.Then,a control strategy for regional ES is proposed,the charging and discharging reference line of ES is set,and multiple autonomy and economic indexes are used as objective functions to select different proportions of ES to control the distributed resources of the regional power grid and establish evaluation indexes of the internal regional generation and load power ratio,the proportion of power supply matching hours,new energy consumption rate and tie line power imbalance outside the region to evaluate changes in the regional autonomy capabilities.The final simulation results showthat in the real regional grid example,the planning method in the planning year in the region of the overall power supply matching hour ratio and new energy consumption rate increased by 3.9%and 4.8%on average,and the power imbalance of the tie line decreased by 7.8%on average.The proposed planning approach enables the maximization of regional autonomy while effectively smoothing the fluctuation of power exchange between the regional grid and the higher-level grid.This presents a rational and effective planning solution for the regional grid,facilitating the coordinated development between the region and the distribution network.展开更多
The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety...The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.展开更多
Power industry is one of the key fields for energy conservation and emissions reduction (ECER) in China. In order to achieve the nation's overall energy consumption target and pollutant emission target set by the ...Power industry is one of the key fields for energy conservation and emissions reduction (ECER) in China. In order to achieve the nation's overall energy consumption target and pollutant emission target set by the 11th Five-Year Plan, to build the resource-conservation and environment-friendly society during the 11th Five-Year Plan period (2006-2010), it is crucial to implement the policy of "Large (units) In and Small (units) Out (LISO)" (i.e., replacing small units with large ones) and accelerate the retirement of small thermal units. According to the statistics, the power industry has made a significant progress in SO2 emission reduction during the first half of 2007. Specifically, with 18.3% growth in power generation, the SO2 emission was reduced by 5.2% compared with the same period in 2006. By the end of July 2007, the retired small units have totaled 6950 MW, 85% of which belongs to the five major power generation groups such as Guodian and Huadian. In this article, the achievements and remaining issues in Henan, Jiangsu, Sichuan Power Companies and East China Grid Company were presented and discussed thoroughly.展开更多
This research investigates the relation between regional power policies of Turkey and the media strategy of President Erdogan.After the coup attempt on July 15,2016,the Justice and Development Party started to impleme...This research investigates the relation between regional power policies of Turkey and the media strategy of President Erdogan.After the coup attempt on July 15,2016,the Justice and Development Party started to implement regional power policies,which are focusing on security affairs.The political power fell into the hands of the President.Regional power policies are used as a legitimised as a tool for the transition to authoritarianism.The main purpose of this transition is to suppress dissident voices by controlling the media.In this article,I argue that President Erdogan uses regional power policies as a tool to control the national media.The President is trying to create the image of a world leader for himself by using the pro-government media companies.Turkey's of natural gas,the Libya issue and the NATO Summit in Madrid will be discussed in terms of media's perspectives.展开更多
In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of avail...In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of available data of regional surveys and historical earthquakes and field investigations of active faults and ancient earthquakes. This model was examined and verified by physical and mathematical simulation experiments, and quantitative relations and data were obtained.展开更多
Based on the energy distribution and economy status In the Northwest Region in China, this paper analyzes the probability of power sources complementation between Northwest Power Grid and the adjacent regional power g...Based on the energy distribution and economy status In the Northwest Region in China, this paper analyzes the probability of power sources complementation between Northwest Power Grid and the adjacent regional power grids, and points out that the strategic emphases for Northwest power development are to speed up 750 kV transmis-sion system construction, expand the Regional power market, rolling-develop hydrdpower stations on the Upper Yellow River, speed up thermal power bases construction and boost the interconnection between Northwest and North China, etc.展开更多
On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main pr...On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.展开更多
The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because th...The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.展开更多
Saudi foreign policy entered into a transformation period towardsa de-militarization and de-escalation with the regional and nonregionalactors since the Al-Ula Peace in January 2021. Under thesupervision of Crown Prin...Saudi foreign policy entered into a transformation period towardsa de-militarization and de-escalation with the regional and nonregionalactors since the Al-Ula Peace in January 2021. Under thesupervision of Crown Prince Mohammed bin Salman, Saudi decision-makers constructed a new domestic power paradigm basedon economic diversification and an ambitious Saudi nationdescribed in the 2030 Saudi Vision. Accordingly, the changingregional security perceptions of the regional actors based on diplomaticmanoeuvres awakened Saudi Arabia to invest in buildingsoft power apart from the religious leadership in the Muslimworld. Thus, the King Salman period experiences producing aSaudi soft power in cultural, social, political, and economic wayswhile silencing the religious rhetoric in foreign policy making.展开更多
Unlike the traditional fossil energy, wind, as the clean renewable energy, can reduce the emission of the greenhouse gas. To take full advantage of the environmental benefits of wind energy, wind power forecasting has...Unlike the traditional fossil energy, wind, as the clean renewable energy, can reduce the emission of the greenhouse gas. To take full advantage of the environmental benefits of wind energy, wind power forecasting has to be studied to overcome the troubles brought by the variable nature of wind. Power forecasting for regional wind farm groups is the problem that many power system operators care about. The high-dimensional feature sets with redundant information are frequently encountered when dealing with this problem. In this paper, two kinds of feature set construction methods are proposed which can achieve the proper feature set either by selecting the subsets or by transforming the original variables with specific combinations. The former method selects the subset according to the criterion of minimal-redundancy-maximal-relevance (mRMR), while the latter does so based on the method of principal component analysis (PCA). A locally weighted learning method is also proposed to utilize the processed feature set to produce the power forecast results. The proposed model is simple and easy to use with parameters optimized automatically. Finally, a case study of 28 wind farms in East China is provided to verify the effectiveness of the proposed method.展开更多
Accurate regional wind power prediction plays an important role in the security and reliability of power systems.For the performance improvement of very short-term prediction intervals(PIs),a novel probabilistic predi...Accurate regional wind power prediction plays an important role in the security and reliability of power systems.For the performance improvement of very short-term prediction intervals(PIs),a novel probabilistic prediction method based on composite conditional nonlinear quantile regression(CCNQR)is proposed.First,the hierarchical clustering method based on weighted multivariate time series motifs(WMTSM)is studied to consider the static difference,dynamic difference,and meteorological difference of wind power time series.Then,the correlations are used as sample weights for the conditional linear programming(CLP)of CCNQR.To optimize the performance of PIs,a composite evaluation including the accuracy of PI coverage probability(PICP),the average width(AW),and the offsets of points outside PIs(OPOPI)is used to quantify the appropriate upper and lower bounds.Moreover,the adaptive boundary quantiles(ABQs)are quantified for the optimal performance of PIs.Finally,based on the real wind farm data,the superiority of the proposed method is verified by adequate comparisons with the conventional methods.展开更多
Effective utilization of renewable energy sources and efficient management of electric energy are essential for any developing countries like India. This can be envisioned through the implementation of concepts of sma...Effective utilization of renewable energy sources and efficient management of electric energy are essential for any developing countries like India. This can be envisioned through the implementation of concepts of smart grid (SG). One of the key requisites for SG implementation is that the grid should be completely observable. Renovation of conventional Indian power grid to a SG necessitates incorporation of the phasor measure- ment units (PMUs) in the present power grid measurement and monitoring system. Since the cost of PMU is high and any bus containing a PMU makes the neighboring connected buses observable, optimal placement of PMUs is very important for complete observability of the grid. This paper proposes optimal redundant geographical locations in the northern, eastern and north-eastern regions of Indian power grid for PMU placement. The PMUs installed in these geographical locations will make the grid completely observable and maintain the observability under the conditions of failure of some PMUs or branch outages. Integer linear programming has been used for finding the optimal PMU locations. The results proposed in this paper can be a stepping stone for revamping the Indian power grid to a SG ensuring complete observability during different contingency conditions.展开更多
Efficient utilization of energy resources is essential for a developing country like India. The concept of smart grid (SG) can provide a highly reliable power system with optimized utilization of available resources...Efficient utilization of energy resources is essential for a developing country like India. The concept of smart grid (SG) can provide a highly reliable power system with optimized utilization of available resources. The present Indian power grid requires revolutionary changes to meet the growing demands and to make the grid smarter and reliable. One of the important requirements for SG is the instantaneous monitoring of the voltage, current and power flows at all buses in the grid. The traditional monitoring system cannot satisfy this requirement since they are based on nonlinear power flow equations. Synchro-phasor-measurement devices like phasor mea- surement units (PMUs) can measure the phasor values of voltages at installed buses. Consequently, the currents passing through all branches connected to that bus can be computed. Since the voltage phasor values at the neighboring buses of a bus containing the PMU can be estimated using Ohm's law, it is redundant to install PMUs at all the buses in a power grid for its complete observability. This paper proposes the optimal geographi- cal locations for the PMUs in southern region Indian power grid for the implementation of SG, using Integer Linear Programming. The proposed optimal geographical locations for PMU placement can be a stepping stone for the implementation of SG in India.展开更多
基金supported by the State Grid Henan Economic Research Institute Science and Technology Project“Calculation and Demonstration of Distributed Photovoltaic Open Capacity Based on Multi-Source Heterogeneous Data”(5217L0230013).
文摘After the integration of large-scale DistributedGeneration(DG)into the distribution network,the randomness and volatility of its output result in a reduction of spatiotemporal alignment between power generation and demand in the distribution network,exacerbating the phenomenon of wind and solar power wastage.As a novel power system model,the fundamental concept of Regional Autonomous Power Grids(RAPGs)is to achieve localized management and energy autonomy,thereby facilitating the effective consumption of DGs.Therefore,this paper proposes a distributed resource planning strategy that enhances the autonomy capabilities of regional power grids by considering multiple evaluation indexes for autonomy.First,a regional Energy Storage(ES)configuration strategy is proposed.This strategy can select a suitable reference value for the upper limit of ES configuration based on the regional load andDGoutput to maximize the elimination of source load deviations in the region as the upper limit constraint of ES capacity.Then,a control strategy for regional ES is proposed,the charging and discharging reference line of ES is set,and multiple autonomy and economic indexes are used as objective functions to select different proportions of ES to control the distributed resources of the regional power grid and establish evaluation indexes of the internal regional generation and load power ratio,the proportion of power supply matching hours,new energy consumption rate and tie line power imbalance outside the region to evaluate changes in the regional autonomy capabilities.The final simulation results showthat in the real regional grid example,the planning method in the planning year in the region of the overall power supply matching hour ratio and new energy consumption rate increased by 3.9%and 4.8%on average,and the power imbalance of the tie line decreased by 7.8%on average.The proposed planning approach enables the maximization of regional autonomy while effectively smoothing the fluctuation of power exchange between the regional grid and the higher-level grid.This presents a rational and effective planning solution for the regional grid,facilitating the coordinated development between the region and the distribution network.
文摘The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.
文摘Power industry is one of the key fields for energy conservation and emissions reduction (ECER) in China. In order to achieve the nation's overall energy consumption target and pollutant emission target set by the 11th Five-Year Plan, to build the resource-conservation and environment-friendly society during the 11th Five-Year Plan period (2006-2010), it is crucial to implement the policy of "Large (units) In and Small (units) Out (LISO)" (i.e., replacing small units with large ones) and accelerate the retirement of small thermal units. According to the statistics, the power industry has made a significant progress in SO2 emission reduction during the first half of 2007. Specifically, with 18.3% growth in power generation, the SO2 emission was reduced by 5.2% compared with the same period in 2006. By the end of July 2007, the retired small units have totaled 6950 MW, 85% of which belongs to the five major power generation groups such as Guodian and Huadian. In this article, the achievements and remaining issues in Henan, Jiangsu, Sichuan Power Companies and East China Grid Company were presented and discussed thoroughly.
文摘This research investigates the relation between regional power policies of Turkey and the media strategy of President Erdogan.After the coup attempt on July 15,2016,the Justice and Development Party started to implement regional power policies,which are focusing on security affairs.The political power fell into the hands of the President.Regional power policies are used as a legitimised as a tool for the transition to authoritarianism.The main purpose of this transition is to suppress dissident voices by controlling the media.In this article,I argue that President Erdogan uses regional power policies as a tool to control the national media.The President is trying to create the image of a world leader for himself by using the pro-government media companies.Turkey's of natural gas,the Libya issue and the NATO Summit in Madrid will be discussed in terms of media's perspectives.
文摘In the stability study of the regional structures in the area of the Longyang Gorge Hydroelectrical Power Station, a model of the current stress-deformation field of the area was constructed based on analyses of available data of regional surveys and historical earthquakes and field investigations of active faults and ancient earthquakes. This model was examined and verified by physical and mathematical simulation experiments, and quantitative relations and data were obtained.
文摘Based on the energy distribution and economy status In the Northwest Region in China, this paper analyzes the probability of power sources complementation between Northwest Power Grid and the adjacent regional power grids, and points out that the strategic emphases for Northwest power development are to speed up 750 kV transmis-sion system construction, expand the Regional power market, rolling-develop hydrdpower stations on the Upper Yellow River, speed up thermal power bases construction and boost the interconnection between Northwest and North China, etc.
文摘On the basis of summing up the development of electric power industry in the 10th Five-Year Plan period, the idea of electric power development planning from 2006 to 2020 is presented. The authors analyzed ten main problems that existed in electric development during the 10th Five-Year Plan period, forecasted the electricity generation from 2006 to 2020, put forward the development strategy of power industry, discussed the component and development program of hydropower, thermal power, nuclear power, natural gas power and renewable power, outlined the present situations of six regional power grids, power transmission from western to eastern regions, UHV AC/DC power transmission and nationwide power grid interconnections, and finally gave out seven suggestions about electric power development in the future.
文摘The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.
文摘Saudi foreign policy entered into a transformation period towardsa de-militarization and de-escalation with the regional and nonregionalactors since the Al-Ula Peace in January 2021. Under thesupervision of Crown Prince Mohammed bin Salman, Saudi decision-makers constructed a new domestic power paradigm basedon economic diversification and an ambitious Saudi nationdescribed in the 2030 Saudi Vision. Accordingly, the changingregional security perceptions of the regional actors based on diplomaticmanoeuvres awakened Saudi Arabia to invest in buildingsoft power apart from the religious leadership in the Muslimworld. Thus, the King Salman period experiences producing aSaudi soft power in cultural, social, political, and economic wayswhile silencing the religious rhetoric in foreign policy making.
文摘Unlike the traditional fossil energy, wind, as the clean renewable energy, can reduce the emission of the greenhouse gas. To take full advantage of the environmental benefits of wind energy, wind power forecasting has to be studied to overcome the troubles brought by the variable nature of wind. Power forecasting for regional wind farm groups is the problem that many power system operators care about. The high-dimensional feature sets with redundant information are frequently encountered when dealing with this problem. In this paper, two kinds of feature set construction methods are proposed which can achieve the proper feature set either by selecting the subsets or by transforming the original variables with specific combinations. The former method selects the subset according to the criterion of minimal-redundancy-maximal-relevance (mRMR), while the latter does so based on the method of principal component analysis (PCA). A locally weighted learning method is also proposed to utilize the processed feature set to produce the power forecast results. The proposed model is simple and easy to use with parameters optimized automatically. Finally, a case study of 28 wind farms in East China is provided to verify the effectiveness of the proposed method.
基金This work was supported by the National Key R&D Program of China“Technology and Application of Wind Power/Photovoltaic Power Prediction for Promoting Renewable Energy Consumption”(No.2018YFB0904200)Complement S&T Program of State Grid Corporation of China(No.SGLNDKOOKJJS1800266).
文摘Accurate regional wind power prediction plays an important role in the security and reliability of power systems.For the performance improvement of very short-term prediction intervals(PIs),a novel probabilistic prediction method based on composite conditional nonlinear quantile regression(CCNQR)is proposed.First,the hierarchical clustering method based on weighted multivariate time series motifs(WMTSM)is studied to consider the static difference,dynamic difference,and meteorological difference of wind power time series.Then,the correlations are used as sample weights for the conditional linear programming(CLP)of CCNQR.To optimize the performance of PIs,a composite evaluation including the accuracy of PI coverage probability(PICP),the average width(AW),and the offsets of points outside PIs(OPOPI)is used to quantify the appropriate upper and lower bounds.Moreover,the adaptive boundary quantiles(ABQs)are quantified for the optimal performance of PIs.Finally,based on the real wind farm data,the superiority of the proposed method is verified by adequate comparisons with the conventional methods.
文摘Effective utilization of renewable energy sources and efficient management of electric energy are essential for any developing countries like India. This can be envisioned through the implementation of concepts of smart grid (SG). One of the key requisites for SG implementation is that the grid should be completely observable. Renovation of conventional Indian power grid to a SG necessitates incorporation of the phasor measure- ment units (PMUs) in the present power grid measurement and monitoring system. Since the cost of PMU is high and any bus containing a PMU makes the neighboring connected buses observable, optimal placement of PMUs is very important for complete observability of the grid. This paper proposes optimal redundant geographical locations in the northern, eastern and north-eastern regions of Indian power grid for PMU placement. The PMUs installed in these geographical locations will make the grid completely observable and maintain the observability under the conditions of failure of some PMUs or branch outages. Integer linear programming has been used for finding the optimal PMU locations. The results proposed in this paper can be a stepping stone for revamping the Indian power grid to a SG ensuring complete observability during different contingency conditions.
文摘Efficient utilization of energy resources is essential for a developing country like India. The concept of smart grid (SG) can provide a highly reliable power system with optimized utilization of available resources. The present Indian power grid requires revolutionary changes to meet the growing demands and to make the grid smarter and reliable. One of the important requirements for SG is the instantaneous monitoring of the voltage, current and power flows at all buses in the grid. The traditional monitoring system cannot satisfy this requirement since they are based on nonlinear power flow equations. Synchro-phasor-measurement devices like phasor mea- surement units (PMUs) can measure the phasor values of voltages at installed buses. Consequently, the currents passing through all branches connected to that bus can be computed. Since the voltage phasor values at the neighboring buses of a bus containing the PMU can be estimated using Ohm's law, it is redundant to install PMUs at all the buses in a power grid for its complete observability. This paper proposes the optimal geographi- cal locations for the PMUs in southern region Indian power grid for the implementation of SG, using Integer Linear Programming. The proposed optimal geographical locations for PMU placement can be a stepping stone for the implementation of SG in India.