期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
The research and demonstration of some major geological problems of Three Gorges Project
1
作者 Chen Deji Man Zuowu 《Engineering Sciences》 EI 2011年第3期49-56,共8页
The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic st... The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003. 展开更多
关键词 Three Gorges Project (TGP) major geological problems research and demonstration
下载PDF
An application of network modeling method to scientific research and demonstration platform-Connector load analysis 被引量:1
2
作者 Rui Ding Du-lei Yan +7 位作者 Hai-cheng Zhang Ye Lu Qi-jia Shi Chao Tian Jia-le Zhang Xin-yun Ni Dao-lin Xu You-sheng Wu 《Journal of Hydrodynamics》 SCIE EI CSCD 2021年第1期33-42,共10页
A new approach referred as“the network modeling method”was developed by the authors to analyze the behaviors of marine structures.In this paper the method is briefly described and applied to predict the loads acting... A new approach referred as“the network modeling method”was developed by the authors to analyze the behaviors of marine structures.In this paper the method is briefly described and applied to predict the loads acting on the connectors between the two modules of the Scientific Research and Demonstration Platform(SRDP),which was deployed in a complicated wave environment near islands and reefs in South China Sea.Based on this method,the response amplitude operators(RAOs)of the connector loads of the SRDP in regular waves,and the time variations of the connector loads of the SRDP in an on-site measured random sea state are predicted and presented.The significant stresses at 20 spots of the local connection structure induced by the connector loads in the sea state are further calculated.The comparisons between the predicted and the on-site measured stresses confirm that the network modeling method is feasible to some extent and especially useful for design of the connectors’arrangement,estimation of the connector loads and the related structural safety of a multi-module floating structure in early design stage. 展开更多
关键词 Network modeling method wave loads hinge type connector on-site measurements Scientific research and demonstration Platform(SRDP)
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部