Risk management control (RMC) system is of vital importance to firms, especially the commercial banks. However, the existing models of risk management are always built from the perspective of financial regulators an...Risk management control (RMC) system is of vital importance to firms, especially the commercial banks. However, the existing models of risk management are always built from the perspective of financial regulators and neglect the practicability within the organization. In order to better facilitate the enterprise risk management (ERM), this paper is trying to construct a new framework of RMC system from the standpoint of the management team. The foundations of our design are COSO ERM report, as well as multi-disciplinary theories and methods, such as economy, psychology, and behavior. We establish a three-component RMC system for commercial banks, which include setting RMC standards, monitoring RMC execution, and rewarding results from standards execution. Then, we introduce an extended three-factor RMC system model. This system and its extended framework are meaningful and referential for both theory and practice of commercial banks' risk management.展开更多
There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological informatio...There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is therefore developed using the experience gained with such systems in Anglo American's South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on critical geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American's Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The system can be adjusted to meet local mine specific requirements. The implementation of this system, a computer program that automatically calculates the risks and recommends predetermined controls, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering.展开更多
Integrated risk management becomes gradually mainstream in worldwide. With China being a member of WTO, it put forward a higher requirement for risk management of Chinese commercial banks. So, it's of theoretical and...Integrated risk management becomes gradually mainstream in worldwide. With China being a member of WTO, it put forward a higher requirement for risk management of Chinese commercial banks. So, it's of theoretical and practical meaning to study the integrated risk management of Chinese commercial banks. Under the guidance of integrated risk management, it pointed out the identification scope, analysis methods and systematic control strategies of risk management in Chinese commercial banks.展开更多
Designer:Design Institute of Offshore Oil Engineering Co.,Ltd.,China Construction Integrator:Offshore Oil Engineering Co.,Ltd.,China 1 Background and characteristics of Brazil FPSO P67/P70 project Floating Production ...Designer:Design Institute of Offshore Oil Engineering Co.,Ltd.,China Construction Integrator:Offshore Oil Engineering Co.,Ltd.,China 1 Background and characteristics of Brazil FPSO P67/P70 project Floating Production Storage and Offloading(FPSO)is a comprehensive large-scale offshore oil and gas production unit that integrates oil and gas processing,oil storage and unloading,daily life,and power supply.展开更多
文摘Risk management control (RMC) system is of vital importance to firms, especially the commercial banks. However, the existing models of risk management are always built from the perspective of financial regulators and neglect the practicability within the organization. In order to better facilitate the enterprise risk management (ERM), this paper is trying to construct a new framework of RMC system from the standpoint of the management team. The foundations of our design are COSO ERM report, as well as multi-disciplinary theories and methods, such as economy, psychology, and behavior. We establish a three-component RMC system for commercial banks, which include setting RMC standards, monitoring RMC execution, and rewarding results from standards execution. Then, we introduce an extended three-factor RMC system model. This system and its extended framework are meaningful and referential for both theory and practice of commercial banks' risk management.
文摘There are a number of geotechnical systems used at open cut operations of Anglo American's Metallurgical Coal business unit in Australia. These systems are mainly mine site specific, based on geological information and used as hazard plans. They are qualitative and reliant upon the experienced judgement of site based engineers and the general workforce. They are not suitable for calculating the associated risks of geological structures and mining responses. A uniform risk rating system that can be used to provide an unbiased, standard and quantifiable assessment of the risk from highwall and lowwall failures is therefore developed using the experience gained with such systems in Anglo American's South African operations. This system is a semi-quantitative risk rating system and takes into account the relative differences in the importance of hazards as experienced at each mine site as a result of different combinations of geotechnical factors and mining conditions. It is based on critical geotechnical and other parameters that have been identified by site mining engineers, geologists and geotechnical engineers. The primary advantage of this risk rating system is that all open cut mines in the Anglo American's Metallurgical Coal operations use a near identical system, which enables the user to compare the risk after each blast and with other mines. The system can be adjusted to meet local mine specific requirements. The implementation of this system, a computer program that automatically calculates the risks and recommends predetermined controls, has been made as practical and as easy to use as possible. This program can be used by personnel from other mining disciplines not directly related to geotechnical engineering.
文摘Integrated risk management becomes gradually mainstream in worldwide. With China being a member of WTO, it put forward a higher requirement for risk management of Chinese commercial banks. So, it's of theoretical and practical meaning to study the integrated risk management of Chinese commercial banks. Under the guidance of integrated risk management, it pointed out the identification scope, analysis methods and systematic control strategies of risk management in Chinese commercial banks.
文摘Designer:Design Institute of Offshore Oil Engineering Co.,Ltd.,China Construction Integrator:Offshore Oil Engineering Co.,Ltd.,China 1 Background and characteristics of Brazil FPSO P67/P70 project Floating Production Storage and Offloading(FPSO)is a comprehensive large-scale offshore oil and gas production unit that integrates oil and gas processing,oil storage and unloading,daily life,and power supply.