The Hot Dry Rock(HDR)is considered as a clean and renewable energy,poised to significantly contribute to the global energy decarbonization agenda.Many HDR projects worldwide have accumulated valuable experience in eff...The Hot Dry Rock(HDR)is considered as a clean and renewable energy,poised to significantly contribute to the global energy decarbonization agenda.Many HDR projects worldwide have accumulated valuable experience in efficient drilling and completion,reservoir construction,and fracture simulation.In 2019,China Geological Survey(CGS)initiated a demonstration project of HDR exploration and production in the Gonghe Basin,aiming to overcome the setbacks faced by HDR projects.Over the ensuing four years,the Gonghe HDR project achieved the first power generation in 2021,followed by the second power generation test in 2022.After establishing the primary well group in the initial phase,two directional wells and one branch well were drilled.Noteworthy progress was made in successfully constructing the targeted reservoir,realizing inter-well connectivity,power generation and grid connection,implementing of the real-time micro-seismic monitoring.A closed-loop technical validation of the HDR exploration and production was completed.However,many technical challenges remain in the process of HDR industrialization,such as reservoir fracture network characterization,efficient drilling and completion,multiple fracturing treatment,continuous injection and production,as well as mitigation of induced seismicity and numerical simulation technology.展开更多
A number of geotechnical analyses were carried out on selected carbonate rock samples from eight sites located in Egypt. This analysis was to assess the suitability of these rocks for building construction aggregate. ...A number of geotechnical analyses were carried out on selected carbonate rock samples from eight sites located in Egypt. This analysis was to assess the suitability of these rocks for building construction aggregate. The analyses included properties of uniaxial compressive strength, tensile strength, porosity, water absorption, and dynamic fragmentation. The success of building construction depends to a large extent on the availability of raw materials at affordable prices. Raw materials commonly used in the building industry include sands, gravels, clays and clay-derived products. Despite the widespread occurrence of carbonate rocks throughout Egypt, the low premium placed on their direct application in the building sector may be explained in two ways: firstly, the lack of awareness of the potential uses of carbonate rocks in the building construction industry(beyond the production of asbestos, ceiling boards, roof sheets and Portland cement); and secondly, the aesthetic application of carbonate rocks in the building construction depends mainly on their physical attributes, a knowledge of which is generally restricted to within the confines of research laboratories and industries. Thus this paper addresses the physical and mechanical characteristics of some Egyptian carbonate rocks, evaluating them for their suitability as building construction aggregates.展开更多
This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Da...This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model.展开更多
A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the u...A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.展开更多
In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel const...In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.展开更多
It is very important to monitor surrounding rock deformation in tunnel construction. The principle, function, development and application of the system composed of a total station and computer for monitoring and analy...It is very important to monitor surrounding rock deformation in tunnel construction. The principle, function, development and application of the system composed of a total station and computer for monitoring and analyzing surrounding rock deformation were discussed. The new methods of two free station of 3D measurement and its mathematic adjustment mode were presented. The development of software for total station on-board and post for computer were also described. Without centering it and measuring its height, the total station controlled by the software on-board can fulfill the whole measurements to target points. Monitoring data can be processed by the post software and results of regression analysis, forecasting information of the tunnel surrounding rock deformation can be provided in time. The practical use shows that this system is practicable, highly accurate and efficient. It satisfies the needs of safety and information construction in tunnel construction of underground engineering.展开更多
Ecological protection technique of rock slope is a new slope protection technique,and it is used widely in some supporting engineering of rock slope at railway and highway.But it is always an important research in the...Ecological protection technique of rock slope is a new slope protection technique,and it is used widely in some supporting engineering of rock slope at railway and highway.But it is always an important research in the field of geotechnical engineering, because the study is related to many subjects and is not systemic and idiographic enough.The paper takes the rock slope of Luozhan(from Luoyang to Zhanjiang)展开更多
The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting ...The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting up to 102.83×10 6 m 3, it is, therefore, the largest project on a scale of geomechanical engineering. The involvement of numerous domestic and foreign research institutes in the scientific research has promoted the development of geomechanics. Some rock and soil mechanical issues arising during construction of the Three Gorges Project are discussed in this article.展开更多
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres...During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.展开更多
基金Funded by the“Investigation and Evaluation of the Hot Dry Rock Resources in the Guide-Dalianhai Area of the Gonghe Basin,Qinghai”(DD20211336,DD20211337,DD20211338)“Hot Dry Rock Resources Exploration and Production Demonstration Project”(DD20230018)of the China Geological Survey。
文摘The Hot Dry Rock(HDR)is considered as a clean and renewable energy,poised to significantly contribute to the global energy decarbonization agenda.Many HDR projects worldwide have accumulated valuable experience in efficient drilling and completion,reservoir construction,and fracture simulation.In 2019,China Geological Survey(CGS)initiated a demonstration project of HDR exploration and production in the Gonghe Basin,aiming to overcome the setbacks faced by HDR projects.Over the ensuing four years,the Gonghe HDR project achieved the first power generation in 2021,followed by the second power generation test in 2022.After establishing the primary well group in the initial phase,two directional wells and one branch well were drilled.Noteworthy progress was made in successfully constructing the targeted reservoir,realizing inter-well connectivity,power generation and grid connection,implementing of the real-time micro-seismic monitoring.A closed-loop technical validation of the HDR exploration and production was completed.However,many technical challenges remain in the process of HDR industrialization,such as reservoir fracture network characterization,efficient drilling and completion,multiple fracturing treatment,continuous injection and production,as well as mitigation of induced seismicity and numerical simulation technology.
文摘A number of geotechnical analyses were carried out on selected carbonate rock samples from eight sites located in Egypt. This analysis was to assess the suitability of these rocks for building construction aggregate. The analyses included properties of uniaxial compressive strength, tensile strength, porosity, water absorption, and dynamic fragmentation. The success of building construction depends to a large extent on the availability of raw materials at affordable prices. Raw materials commonly used in the building industry include sands, gravels, clays and clay-derived products. Despite the widespread occurrence of carbonate rocks throughout Egypt, the low premium placed on their direct application in the building sector may be explained in two ways: firstly, the lack of awareness of the potential uses of carbonate rocks in the building construction industry(beyond the production of asbestos, ceiling boards, roof sheets and Portland cement); and secondly, the aesthetic application of carbonate rocks in the building construction depends mainly on their physical attributes, a knowledge of which is generally restricted to within the confines of research laboratories and industries. Thus this paper addresses the physical and mechanical characteristics of some Egyptian carbonate rocks, evaluating them for their suitability as building construction aggregates.
基金support by the National Natural Science Foundation of China(Grant Nos.52108377,52090084,and 51938008).
文摘This research explores the potential for the evaluation and prediction of earth pressure balance shield performance based on a gray system model.The research focuses on a shield tunnel excavated for Metro Line 2 in Dalian,China.Due to the large error between the initial geological exploration data and real strata,the project construction is extremely difficult.In view of the current situation regarding the project,a quantitative method for evaluating the tunneling efficiency was proposed using cutterhead rotation(R),advance speed(S),total thrust(F)and torque(T).A total of 80 datasets with three input parameters and one output variable(F or T)were collected from this project,and a prediction framework based gray system model was established.Based on the prediction model,five prediction schemes were set up.Through error analysis,the optimal prediction scheme was obtained from the five schemes.The parametric investigation performed indicates that the relationships between F and the three input variables in the gray system model harmonize with the theoretical explanation.The case shows that the shield tunneling performance and efficiency are improved by the tunneling parameter prediction model based on the gray system model.
基金Scientific and Technological Support and Guidance Plan Projects of Zhejiang Province(Grant No.2008C23019)
文摘A self-developed elasto-plastic finite element program was used to analyze the construction sequence of high rock slope's stabilization in a coal-coking plant, and the result was compared with that employing the ultimate equilibrium method. Based on the results of finite element analysis, the stress contour graphs and displacement vector graphs at different construction steps were obtained, and the behavior of the slope during stabilization construction process was analyzed quantitatively. Based on the analysis of safety factors of three different schemes of stabilization and two different construction schemes, the assessment of stability and bracing design of the construction process were performed. The results show that the original reinforcement design is improper; the stability of the rock slope is controlled by a developed structural plane, the stability factor after excavation is less than 1, and the free surface should be braced in time; for stability, the construction sequence should adopt that bracing follows excavation step by step up to down; the local slide occurred during the construction process agrees with the dangerous slide determined by the numerical analysis, which proves the validity and rationality of the adopted method.
文摘In the process of tunnel construction,if large-deformation occurs in high geostress soft rock,it will likely cause geological disasters.This situation will not only seriously affect the smooth progress of tunnel construction,but also cause serious safety threat to the construction personnel.Therefore,with the continuous growth in the number and scale of tunnel construction in recent years,the construction technology for high geostress soft rock with large-deformation has begun to receive more and more attention from the society.Based on this,this paper takes an actual project as an example to analyze the specific application of the technology in order to improve the construction effect and avoid the damage caused by the large-deformation of the high geostress soft rock.
基金Project(2000G033) supported by the S & T, Ministry of Railroad , China
文摘It is very important to monitor surrounding rock deformation in tunnel construction. The principle, function, development and application of the system composed of a total station and computer for monitoring and analyzing surrounding rock deformation were discussed. The new methods of two free station of 3D measurement and its mathematic adjustment mode were presented. The development of software for total station on-board and post for computer were also described. Without centering it and measuring its height, the total station controlled by the software on-board can fulfill the whole measurements to target points. Monitoring data can be processed by the post software and results of regression analysis, forecasting information of the tunnel surrounding rock deformation can be provided in time. The practical use shows that this system is practicable, highly accurate and efficient. It satisfies the needs of safety and information construction in tunnel construction of underground engineering.
文摘Ecological protection technique of rock slope is a new slope protection technique,and it is used widely in some supporting engineering of rock slope at railway and highway.But it is always an important research in the field of geotechnical engineering, because the study is related to many subjects and is not systemic and idiographic enough.The paper takes the rock slope of Luozhan(from Luoyang to Zhanjiang)
文摘The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting up to 102.83×10 6 m 3, it is, therefore, the largest project on a scale of geomechanical engineering. The involvement of numerous domestic and foreign research institutes in the scientific research has promoted the development of geomechanics. Some rock and soil mechanical issues arising during construction of the Three Gorges Project are discussed in this article.
基金National Natural Science Foundation of China(No.51379192)
文摘During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.