Construction issues of high-speed rail infrastructures have been increasingly concerned worldwide,of which the subgrade settlement in soft soil area becomes a particularly critical problem.Due to the high compressibil...Construction issues of high-speed rail infrastructures have been increasingly concerned worldwide,of which the subgrade settlement in soft soil area becomes a particularly critical problem.Due to the high compressibility and low permeability of soft soil,the post-construction settlement of the subgrade is extremely difficult to control in these regions,which seriously threatens the operation safety of high-speed trains.In this work,the significant issues of high-speed railway subgrades in soft soil regions are discussed.The theoretical and experimental studies on foundation treatment methods for ballasted and ballastless tracks are reviewed.The settlement evolution and the settlement control effect of different treatment methods are highlighted.Control technologies of subgrade differential settlement are subsequently briefly presented.Settlement calculation algorithms of foundations reinforced by different treatment methods are discussed in detail.The defects of existing prediction methods and the challenges faced in their practical applications are analyzed.Furthermore,the guidance on future improvement in control theories and technologies of subgrade settlement for high-speed railway lines and the corresponding challenges are provided.展开更多
In view of the characteristics of soft soil deep foundation pit for the construction and geotechnical characteristics of the special medium,it is difficult to calculate theoreti- cally accurately structural deformatio...In view of the characteristics of soft soil deep foundation pit for the construction and geotechnical characteristics of the special medium,it is difficult to calculate theoreti- cally accurately structural deformation of the foundation pit,so in the course of excavation on the construction of the information is particularly important.The analysis and compari- son of several popular non-linear forecasting methods,combined with the actual projects, set up a grey theoretical prediction model,time series forecasting model,improved neural network model to predict deformation of the foundation pit.The results show that the use of neural network to predict with high accuracy solution,it is the foundation deformation prediction effective way in underground works with good prospects.展开更多
Different criteria and factors are used in different methods of soft soil foundation settlement calculation and engineering geological zoning.The methods used are not universally suitable for complex geological enviro...Different criteria and factors are used in different methods of soft soil foundation settlement calculation and engineering geological zoning.The methods used are not universally suitable for complex geological environments.The post-construction settlement of soft soil foundations are especially large and difficult to calculate.In addition,there are many deficiencies in the current methods used for engineering geological zoning.Focusing on the need of establishing engineering geological zoning for areas with soft soil foundations in the Tianjin Marine Economic Area,combination weighting and extension methods were introduced.An evaluation model for the settlement of soft soil foundations was established using multiple factors and large amounts of data.This evaluation model is accurate and objective for delineating engineering geological zoning.These methods eliminate deficiencies by considering both objective and subjective factors,and help obtain an objective and accurate result.展开更多
Immersed tube tunnels are usually placed on soft soil layers in cross-sea tunnelling engineering.Owing to the influence of stratum conditions and slope design,the longitudinal distribution of substratum layers is gene...Immersed tube tunnels are usually placed on soft soil layers in cross-sea tunnelling engineering.Owing to the influence of stratum conditions and slope design,the longitudinal distribution of substratum layers is generally uneven.Thus,the inhomogeneous deformation of the element-joint becomes the key factor in the failure of the immersed tube tun-nel.Therefore,a corresponding calculation method for joint deformation is needed to explore the deformation law of immersed tube tunnels.By constructing a three-section immersed tube tunnel analysis model(TTM),the relationship between the two types of deformation of the immersed tube tunnel structure in a longitudinal nonuniform soft soil foundation is described,and the deformation characteristics of the immersed structure under different boundaries are discussed.Based on the mechanical behaviour of the joint and foundation,according to the Timoshenko beam on the Vlasov two-parameter foundation(VTM),considering the tidal cyclic load during the operation and maintenance period,an example analysis is given.Moreover,the deformation characteristics and development trend of the immersed tube tunnel under the influence of different soil layers are discussed.The obtained results have a certain guiding significance for the deformation calculation of immersed tube tunnels.展开更多
To determine the appropriate soft foundation treatment for a river-crossing tunnel, freezing reinforcement design and technology were introduced based on the channel tunnel design and construction practice. Through fi...To determine the appropriate soft foundation treatment for a river-crossing tunnel, freezing reinforcement design and technology were introduced based on the channel tunnel design and construction practice. Through finite element analysis and engineering practices, two rows of horizontal perforated freezing pipes were designed and installed on both sides of a passage for tunnel rein- forcement, which produced the thickness and strength of frozen crust that satisfied the design requirements. These information are valuable for guiding the design and construction of river-crossing tunnels in coastal areas.展开更多
基金National Natural Science Foundation of China(No.51778485).
文摘Construction issues of high-speed rail infrastructures have been increasingly concerned worldwide,of which the subgrade settlement in soft soil area becomes a particularly critical problem.Due to the high compressibility and low permeability of soft soil,the post-construction settlement of the subgrade is extremely difficult to control in these regions,which seriously threatens the operation safety of high-speed trains.In this work,the significant issues of high-speed railway subgrades in soft soil regions are discussed.The theoretical and experimental studies on foundation treatment methods for ballasted and ballastless tracks are reviewed.The settlement evolution and the settlement control effect of different treatment methods are highlighted.Control technologies of subgrade differential settlement are subsequently briefly presented.Settlement calculation algorithms of foundations reinforced by different treatment methods are discussed in detail.The defects of existing prediction methods and the challenges faced in their practical applications are analyzed.Furthermore,the guidance on future improvement in control theories and technologies of subgrade settlement for high-speed railway lines and the corresponding challenges are provided.
基金the Educational Department of Liaoning Province Through Scientific Research Project(20060051)National Natural Science Foundation of China(50604009)Universities Excellent Talents Support Plan to Train Foundation of Liaoning(RC-04-13)
文摘In view of the characteristics of soft soil deep foundation pit for the construction and geotechnical characteristics of the special medium,it is difficult to calculate theoreti- cally accurately structural deformation of the foundation pit,so in the course of excavation on the construction of the information is particularly important.The analysis and compari- son of several popular non-linear forecasting methods,combined with the actual projects, set up a grey theoretical prediction model,time series forecasting model,improved neural network model to predict deformation of the foundation pit.The results show that the use of neural network to predict with high accuracy solution,it is the foundation deformation prediction effective way in underground works with good prospects.
基金National Natural Science Foundations of China(Nos.41172236,41402243)
文摘Different criteria and factors are used in different methods of soft soil foundation settlement calculation and engineering geological zoning.The methods used are not universally suitable for complex geological environments.The post-construction settlement of soft soil foundations are especially large and difficult to calculate.In addition,there are many deficiencies in the current methods used for engineering geological zoning.Focusing on the need of establishing engineering geological zoning for areas with soft soil foundations in the Tianjin Marine Economic Area,combination weighting and extension methods were introduced.An evaluation model for the settlement of soft soil foundations was established using multiple factors and large amounts of data.This evaluation model is accurate and objective for delineating engineering geological zoning.These methods eliminate deficiencies by considering both objective and subjective factors,and help obtain an objective and accurate result.
基金The work was financially supported by the Natural Science Foundation of Guangdong Province,China(Grant No.2022A1515011200)the State Key Laboratory for Geo-Mechanics and Deep Underground Engineering of China University of Mining&Technology(Grant No.SKLGDUEK2005)the Science and Technology Planning Project of Guangdong Province of China(Grant No.STKJ2021129).
文摘Immersed tube tunnels are usually placed on soft soil layers in cross-sea tunnelling engineering.Owing to the influence of stratum conditions and slope design,the longitudinal distribution of substratum layers is generally uneven.Thus,the inhomogeneous deformation of the element-joint becomes the key factor in the failure of the immersed tube tun-nel.Therefore,a corresponding calculation method for joint deformation is needed to explore the deformation law of immersed tube tunnels.By constructing a three-section immersed tube tunnel analysis model(TTM),the relationship between the two types of deformation of the immersed tube tunnel structure in a longitudinal nonuniform soft soil foundation is described,and the deformation characteristics of the immersed structure under different boundaries are discussed.Based on the mechanical behaviour of the joint and foundation,according to the Timoshenko beam on the Vlasov two-parameter foundation(VTM),considering the tidal cyclic load during the operation and maintenance period,an example analysis is given.Moreover,the deformation characteristics and development trend of the immersed tube tunnel under the influence of different soil layers are discussed.The obtained results have a certain guiding significance for the deformation calculation of immersed tube tunnels.
文摘To determine the appropriate soft foundation treatment for a river-crossing tunnel, freezing reinforcement design and technology were introduced based on the channel tunnel design and construction practice. Through finite element analysis and engineering practices, two rows of horizontal perforated freezing pipes were designed and installed on both sides of a passage for tunnel rein- forcement, which produced the thickness and strength of frozen crust that satisfied the design requirements. These information are valuable for guiding the design and construction of river-crossing tunnels in coastal areas.