期刊文献+
共找到23篇文章
< 1 2 >
每页显示 20 50 100
Spatio-temporal distribution of phytoplankton in the Danjiangkou Reservoir, a water source area for the South-to-North Water Diversion Project (Middle Route), China 被引量:12
1
作者 殷大聪 郑凌凌 宋立荣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2011年第3期531-540,共10页
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ... One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR. 展开更多
关键词 Danjiangkou Reservoir PHYTOPLANKTON south-to-north water diversion project EUTROPHICATION
下载PDF
Land Cover Changes and Drivers in the Water Source Area of the Middle Route of the South-to-North Water Diversion Project in China from 2000 to 2015 被引量:4
2
作者 GAO Wenwen ZENG Yuan +2 位作者 ZHAO Dan WU Bingfang REN Zhiyuan 《Chinese Geographical Science》 SCIE CSCD 2020年第1期115-126,共12页
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u... The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas. 展开更多
关键词 remote sensing land cover change object-based classification Middle Route of the south-to-north water diversion project(MR-snwdp) China
下载PDF
Critical chain construction with multi-resource constraints based on portfolio technology in South-to-North Water Diversion Project 被引量:3
3
作者 Jing-chun FENG Lei LI +4 位作者 Nan YANG Yu-zhen HONG Min PANG Xiong YAO Li-cheng WANG 《Water Science and Engineering》 EI CAS 2011年第2期225-236,共12页
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy... Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields. 展开更多
关键词 multi-resource constraints south-to-north water diversion project project portfolio critical chain
下载PDF
Reliability model of organization management chain of South-to-North Water Diversion Project during construction period 被引量:3
4
作者 Feng Jingchun Zhou Yang +2 位作者 Hong Yuzhen Zhao Shixin Ren Xiaoqiang 《Water Science and Engineering》 EI CAS 2008年第4期107-113,共7页
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio... In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up. 展开更多
关键词 south-to-north water diversion project reliability model management chain parallel connection series connection
下载PDF
Wet-Dry Runoff Correlation in Western Route of South-to-North Water Diversion Project,China 被引量:2
5
作者 HUANG Xiao-rong ZHAO Jing-wei YANG Peng-peng 《Journal of Mountain Science》 SCIE CSCD 2015年第3期592-603,共12页
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst... The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area. 展开更多
关键词 south-to-north water diversion project Yangtze River Streamflow Encounter probability Correlation coefficient Cycle Hydrologicalcompensation
下载PDF
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs 被引量:2
6
作者 Jing-chun FENG Ya-fang REN +2 位作者 Zhong-nan DUAN Zhan-jun LIU Hai-yang LI 《Water Science and Engineering》 EI CAS 2012年第3期350-360,共11页
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio... According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably, 展开更多
关键词 program establishment program management bidding section construction period critical path method (CPM) penaly model south-to-north water diversion project
下载PDF
IMPACTS OF THE SOUTH-TO-NORTH WATER DIVERSION PROJECTS (MIDDLE ROUTE)ON THE WATER ENVIRONMENT OF THE MIDDLE AND LOWER REACHES OF THE HANJIANG RIVER
7
作者 FAN Bei-Lin, WAN Jian-Rong, ZHANG Jie and LIN Qiu-Sheng (Yangtze River Scientific Research Institute,River Research Deparment, Wuhan 430010,China) 《水生生物学报》 CAS CSCD 北大核心 2006年第6期643-646,共4页
In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well... In this paper, according to the rule of unbalanced sediment transport and the analysis of field data, different water diversion schemes were theoretically studied, including the erosion and sedimentation trend as well as their impacts on the environment of the middle and lower reaches of the Hanjiang River. The results showed that the 95×10 8m 3 water diversion scheme will cause less erosion and water level decrease than the 15×10 8m 3 water diversion scheme. Using a water diversion scheme of 95×10 8m 3, the decrease of water quantity can impact the river hydrodynamic regime substantially and the environments of the middle and lower reaches of the Hanjiang River will be greatly affected. It is therefore necessary to develop new water resources or build projects to meet the need of the environment and the needs for navigation. 展开更多
关键词 south-to-north water diversion project River regime water environment Mathematical model
下载PDF
Critical discharge at Datong for controlling operation of South-to-North Water Transfer Project in dry seasons 被引量:3
8
作者 Wang Yigang Huang Huiming Li Xi 《Water Science and Engineering》 EI CAS 2008年第2期47-58,共12页
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec... Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years. 展开更多
关键词 saltwater intrusion critical discharge at Datong water diversion the south-to-north water Transfer project
下载PDF
Water diversion and agricultural production:Evidence from China 被引量:1
9
作者 YANG Rui XU Hang 《Journal of Integrative Agriculture》 SCIE CAS CSCD 2023年第4期1244-1257,共14页
Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the pref... Water diversion can alleviate water shortages caused by the uneven distribution of water resources.China’s Southto-North Water Diversion Project(SNWD)is the largest water diversion project worldwide.Based on the prefecturelevel data of China’s Huang-Huai-Hai Plain from 2000 to 2020,this study employs an empirical strategy of Differencesin-Differences(DID)to analyze the impact of SNWD on agricultural production.The results show that SNWD has significantly increased agricultural production,measured by the agricultural value added.The estimated results of the benchmark model remain robust when the contemporaneous policy is addressed,an alternative outcome is used,subsamples are estimated,and alternative estimation techniques are employed.This study argues that the potential impact mechanism may be that SNWD significantly increases the acreage for cash crops but reduces that for grain crops.Heterogeneity analysis shows that in prefectures with high temperature or land potential,SNWD’s impact on agricultural value added is relatively low.In contrast,in areas with prolonged sunshine or high slopes,SNWD’s impact on agricultural value added is relatively large.Given the low added value of grain crops,the government should consider strengthening food security by subsidizing water supply to sustain grain production. 展开更多
关键词 south-to-north water diversion project agricultural production Differences-in-Differences China
下载PDF
Water-saving potential evaluation of water-receiving regions in Shandong province on the East Route of the South-to-North Water Transfer Project of China
10
作者 YIN Xiao-lin GAO Yuan-yuan +1 位作者 WU Hai-ping ZHAO Xue-ming 《Journal of Groundwater Science and Engineering》 2020年第3期287-297,共11页
Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route... Taking 13 water-receiving areas on the East Route of the South-to-North Water Diversion Project(ERSNWDP)in Shandong Province as the study area,and comparing it with Jiangsu Province on the ERSNWDP and the Middle Route of the South-to-North(MRSNWDP),the current water-saving potential of the water-receiving areas within the municipalities of Shandong was analyzed.Different water-saving scenarios were constructed and analyzed with key water-saving indexes in various industries.These indexes include the effective utilization coefficient of farmland irrigation water,total water consumption of industrial sectors with an added value of over 10000 RMB,average leakage rate of the urban public water supply pipe network and the penetration rate of water-saving appliances.Based on the scenarios,comprehensive water-saving potential of the 13 water-receiving area cities was calculated.The results show that the water-saving potential of the study area is at a relative high level.However,some cities still have a certain amount of water-saving potential for agriculture and industry to be elevated.Under the recommended water-saving scenario,the water-saving potential is 1.134 billion m3,accounting for 5.33%of the current total water consumption,of which 460 million m3 is in agriculture,600 million m3 in industry,is and 74.20 million m3 in urban domestic sector.Comprehensive water-saving measures for the study area were proposed from the aspects of agricultural,industrial and domestic water uses.Agricultural and industrial water saving are more significant.The major cities for agricultural water saving include Jining City,Heze City,Weifang City and Jinan City;the focus cities of industrial water saving mainly include Weihai City,Jining City and Qingdao City and etc.;the key water-saving areas for urban use mainly include Zaozhuang City,Jining City and Heze City. 展开更多
关键词 East Route of south-to-north water diversion project Shandong water receiving area water-saving level water-saving potential
下载PDF
On conservation and development of architecture and environment in the construction of large-scale national infrastructure——Exemplified by the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project 被引量:1
11
作者 DUAN Jin ,LUO JianLi,WANG XingPing,TANG Jun&YU Gang School of Architecture,Southeast University,Nanjing 210096,China 《Science China(Technological Sciences)》 SCIE EI CAS 2009年第12期3613-3625,共13页
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ... The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined. 展开更多
关键词 Jiangsu Section of Eastern Route south-to-north water diversion project CANAL culture routes water resources heritage CORRIDORS landscape and RECREATION CORRIDORS town economic CORRIDORS synthetical ZONING and grading
原文传递
Application of SEDEA to evaluation of degree of harmony between water resources and economic development 被引量:1
12
作者 Jun MA Chui-yong ZHENG 《Water Science and Engineering》 EI CAS 2011年第1期110-120,共11页
This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North W... This paper introduces the method of data envelopment analysis (DEA) for evaluation of the degree of harmony between water resources and economic development of the water conservancy area of China's South-to-North Water Diversion Project (SNWDP). For this evaluation, a super-efficiency DEA (SEDEA) model was developed based on the super-efficiency method. To verify the applicability of the SEDEA model, both the SEDEA model and a normal-efficiency DEA (NEDEA) model were used to evaluate the degree of harmony between water resources and economic development of typical cities in the SNWDP water conservancy area. The results show that the SEDEA model ranks the degree of harmony of typical cities more efficiently than the NEDEA model, and thus can better evaluate the degree of harmony between water resources and economic development of different cities than the NEDEA model. Furthermore, the SEDEA model can be applied as an operational research tool in regional water resources management. 展开更多
关键词 degree of harmony super-efficiency DEA model water conservancy area south-to-north water diversion project
下载PDF
基于DPSIR概念模型的水资源系统脆弱性分析 被引量:40
13
作者 董四方 董增川 陈康宁 《水资源保护》 CAS 2010年第4期1-3,25,共4页
从水资源复杂系统角度结合DPSIR概念模型,构建了水资源系统脆弱性评价指标体系。利用大样本数据、投影寻踪、粒子群算法、插值型曲线,建立了基于粒子群投影寻踪插值的水资源系统脆弱性评价模型。结合河北省南水北调受水区水资源系统的实... 从水资源复杂系统角度结合DPSIR概念模型,构建了水资源系统脆弱性评价指标体系。利用大样本数据、投影寻踪、粒子群算法、插值型曲线,建立了基于粒子群投影寻踪插值的水资源系统脆弱性评价模型。结合河北省南水北调受水区水资源系统的实例,从驱动力-压力-状态-影响-响应等5个方面计算分析了该系统的脆弱性。结果表明,以资源型缺水为主导的水资源基础条件薄弱已成为受水区水资源系统脆弱性的制约因素,且在未来很长一段时间内难以改变。 展开更多
关键词 水资源系统 脆弱性 DPSIR模型 投影寻踪 南水北调工程
下载PDF
南水北调工程工期影响因素的问卷调查及分析 被引量:7
14
作者 刘睿 张宇清 +1 位作者 王小雅 赵振宇 《土木工程学报》 EI CSCD 北大核心 2009年第5期133-138,共6页
南水北调工程是一项宏伟的跨流域水调工程,对我国经济发展起到重要作用。在对该项目业主方、设计方、承包商方、监理方等进行工期影响因素问卷调查的基础上,首先利用SPSS对问卷信度进行检验,在确保问卷可靠性的前提下,运用因子分析法简... 南水北调工程是一项宏伟的跨流域水调工程,对我国经济发展起到重要作用。在对该项目业主方、设计方、承包商方、监理方等进行工期影响因素问卷调查的基础上,首先利用SPSS对问卷信度进行检验,在确保问卷可靠性的前提下,运用因子分析法简化影响工期的影响因素,并对与项目相关因素、与业主相关因素以及与承包商相关因素进行重点研究。发现各方沟通与合同管理、合同方式与招投标、项目自身特点、业主要求、工程进度款、新技术与信息的利用等方面是最为重要的工期影响因素。这些结论为相关政府主管部门提供了决策依据,同时对其他大型复杂项目群的管理也提供了有益的参考。 展开更多
关键词 南水北调 建设工期 问卷调查 项目群
下载PDF
南水北调中线工程总干渠非正常工况下的水力响应分析 被引量:12
15
作者 张成 傅旭东 王光谦 《南水北调与水利科技》 CAS CSCD 2007年第6期8-12,20,共6页
非正常工况下的渠道水力响应对大型调水工程输水渠道的安全有着深刻的影响。以南水北调中线工程总干渠典型渠段作为研究对象,模拟分析了非正常工况下渠段的水力响应特征及退水闸的退水作用。计算结果表明,事故渠段上、下游端节制闸紧急... 非正常工况下的渠道水力响应对大型调水工程输水渠道的安全有着深刻的影响。以南水北调中线工程总干渠典型渠段作为研究对象,模拟分析了非正常工况下渠段的水力响应特征及退水闸的退水作用。计算结果表明,事故渠段上、下游端节制闸紧急关闭时,节制闸前(或后)水位壅高(或降落)的幅度很大,渠段内水位波动剧烈;节制闸关闭时间的延长虽能在一定程度上减小水位壅高和降落幅度,但效果并不明显;退水闸的启用能够较好减小水位的壅高幅度,有效降低水流的漫溢危险。 展开更多
关键词 南水北调 中线工程 非正常工况 水力响应
下载PDF
南水北调中线工程受水区生态补水目标及优先级研究 被引量:4
16
作者 张丽丽 殷峻暹 《水资源保护》 CAS 2010年第4期4-7,共4页
立足于南水北调中线工程生态补水调度的实际需要,以南水北调中线工程受水区水资源三级区为基本单元,从生态条件、水文条件以及人类活动影响等方面构建评价指标体系,对水资源三级区进行生态水文分级,为研究中线受水区生态补水目标及优先... 立足于南水北调中线工程生态补水调度的实际需要,以南水北调中线工程受水区水资源三级区为基本单元,从生态条件、水文条件以及人类活动影响等方面构建评价指标体系,对水资源三级区进行生态水文分级,为研究中线受水区生态补水目标及优先级别提供依据;在分析生态补水目标确定原则的基础上,依据南水北调中线工程生态补水方式,初步界定中线工程生态补水对象主要有三类:湿地、地下水、河流;最后根据水资源三级区生态水文分级结果,确定南水北调中线工程受水区生态补水目标及优先级别。 展开更多
关键词 南水北调中线工程 生态补水 生态水文分级 生态调度
下载PDF
创新院地合作模式的探讨——以南水北调中线渠首水源地林业生态示范区技术服务为例 被引量:4
17
作者 张艺华 《林业资源管理》 北大核心 2014年第4期151-155,共5页
院地合作对于加快科研院所科技成果转化与推广应用具有重要作用。通过南水北调中线渠首水源地林业生态示范区综合技术服务体系设计,展示了中国林科院院地合作新模式的创新点;并针对该模式的推广应用进行了讨论和展望;旨在倡导科研院所... 院地合作对于加快科研院所科技成果转化与推广应用具有重要作用。通过南水北调中线渠首水源地林业生态示范区综合技术服务体系设计,展示了中国林科院院地合作新模式的创新点;并针对该模式的推广应用进行了讨论和展望;旨在倡导科研院所的院地合作模式亦要与时俱进,不断创新,才能在科技服务于地方中发挥越来越大的作用。 展开更多
关键词 院地合作 国家科技平台 南水北调中线 渠首水源地
下载PDF
南水北调中线穿黄工程隧洞盾构施工规律的探讨 被引量:3
18
作者 陈曦川 《南水北调与水利科技》 CAS CSCD 2010年第4期152-154,共3页
在介绍南水北调中线穿黄隧洞设计参数、地质情况及盾构机选型参数的基础上,对中线穿黄隧洞盾构施工中盾构机刀盘刀具维护保养经验进行了分析,总结了施工过程中定期检查盾构机刀盘、定期带压进舱检查、根据不同地质情况灵活配置盾构刀具... 在介绍南水北调中线穿黄隧洞设计参数、地质情况及盾构机选型参数的基础上,对中线穿黄隧洞盾构施工中盾构机刀盘刀具维护保养经验进行了分析,总结了施工过程中定期检查盾构机刀盘、定期带压进舱检查、根据不同地质情况灵活配置盾构刀具、实时分析掘进参数的施工规律,保障隧洞掘进施工正常进行。 展开更多
关键词 南水北调中线工程 穿黄隧洞 盾构施工
下载PDF
基于水资源配置情景的地下水演变模拟研究——以海河流域平原区为例 被引量:5
19
作者 杜思思 游进军 +1 位作者 陆垂裕 张彬 《南水北调与水利科技》 CAS CSCD 2011年第2期64-68,共5页
在分析研究国内外地表水-地下水联合应用模型研究现状基础上,提出水资源配置模型与地下水模型联合运用实现用水变化情景下的海河平原区地下水演变模拟。通过数据展布构建两个模型不同时空尺度的数据转换输入。通过动态插值推求从水资源... 在分析研究国内外地表水-地下水联合应用模型研究现状基础上,提出水资源配置模型与地下水模型联合运用实现用水变化情景下的海河平原区地下水演变模拟。通过数据展布构建两个模型不同时空尺度的数据转换输入。通过动态插值推求从水资源配置水平年年数据结果到连续时间过程的地下水模拟模型动态时间序列数据输入,进而模拟以现状为初始状态的地下水演变趋势。通过不同条件的配置情景模拟得出未来海河平原地下水演变规律以及南水北调工程和地下水限采措施的影响。结果表明,在没有南水北调情景下,海河平原区在2005年-2020年期间地下水负均衡量将接近50亿m3,南水北调工程通水后负均衡量减少到不足14亿m3,典型漏斗区的水位将少下降525 m,地下水恶化的趋势将得到有力的缓解。 展开更多
关键词 水资源配置 地下水模拟 南水北调 海河流域
下载PDF
东线穿黄河工程滩地埋管设计分析与施工研究
20
作者 傅题善 罗辉 +2 位作者 方云益 孟繁义 崔玉静 《南水北调与水利科技》 CAS CSCD 2009年第4期31-34,共4页
东线穿黄河工程是南水北调东线的关键控制性项目,滩地埋管断面为内圆外城门洞型式,内径7.5m,为目前国内最大直径现浇直埋混凝土输水圆涵,结构型式独特,技术含量高,施工难度大,通过对设计、关键施工工艺、配合比优化、施工质量控制等方... 东线穿黄河工程是南水北调东线的关键控制性项目,滩地埋管断面为内圆外城门洞型式,内径7.5m,为目前国内最大直径现浇直埋混凝土输水圆涵,结构型式独特,技术含量高,施工难度大,通过对设计、关键施工工艺、配合比优化、施工质量控制等方面进行了必要分析和研究,从而保证了工程质量,同时对国内现浇输水圆涵工程施工有一定的指导意义。 展开更多
关键词 南水北调 混凝土输水管涵 设计分析 施工研究
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部