The quality of the software product is a crucial factor that contributes to its success. Therefore, it is important to specify the right software quality requirements that will establish the basis for desired quality ...The quality of the software product is a crucial factor that contributes to its success. Therefore, it is important to specify the right software quality requirements that will establish the basis for desired quality of the final system/software product. There are several known methodologies/ processes that support the specification of the system/software functional requirements starting from the user needs to finally obtain the system requirements that the developers can implement through their development process. System/software quality requirements are interdependent with functional requirements, which means that the system/software quality requirements are meant to be specified in parallel with the latter. The ISO/IEC 25000 [1] SQuaRE series of standards include the standard ISO/IEC 25030—Software engineering—Software Quality Requirements and Evaluation—Quality requirements [2], which has as main goal to help specify software quality requirements. As to date, this standard does not offer clear and concise steps that a software quality engineer could follow in order to specify them. This article presents modifications recommended for ISO/IEC 25030 standard, with, among the others, a new requirements definition process that allows for specifying the system/software quality requirements taking into account the existing published system and software quality model ISO/IEC 25010 [3] as well as all the stake- holders of the project.展开更多
Due to the complex,uncertainty and dynamics in the modern manufacturing environment,a flexible and robust shop floor scheduler is essential to achieve the production goals.A design framework of a shop floor dynamical ...Due to the complex,uncertainty and dynamics in the modern manufacturing environment,a flexible and robust shop floor scheduler is essential to achieve the production goals.A design framework of a shop floor dynamical scheduler is presented in this paper.The workflow and function modules of the scheduler are discussed in detail.A multi-step adaptive scheduling strategy and a process specification language,which is an ontology-based representation of process plan,are utilized in the proposed scheduler.The scheduler acquires the dispatching rule from the knowledge base and uses the build-in on-line simulator to evaluate the obtained rule.These technologies enable the scheduler to improve its fine-tune ability and effectively transfer process information into other heterogeneous information systems in a shop floor.The effectiveness of the suggested structure will be demonstrated via its application in the scheduling system of a manufacturing enterprise.展开更多
As part of a recent analysis of exclusive two-photon production of W+W- pairs at the LHC, the CMS experiment used di-lepton data to obtain an "effective" photon-photon luminosity. We show how the CMS analysis on th...As part of a recent analysis of exclusive two-photon production of W+W- pairs at the LHC, the CMS experiment used di-lepton data to obtain an "effective" photon-photon luminosity. We show how the CMS analysis on their 8 TeV data, along with some assumptions about the likelihood for events in which the proton breaks up to pass the selection criteria, can be used to significantly constrain the photon parton distribution functions, such as those from the CTEQ, MRST, and NNPDF collaborations. We compare the data with predictions using these photon distributions, as well as the new LUXqed photon distribution. We study the impact of including these data on the NNPDF2.3QED, NNPDF3.0QED and CT14QEDinc fits. We find that these data place a useful and complementary cross-check on the photon distribution, which is consistent with the LUXqed prediction while suggesting that the NNPDF photon error band should be significantly reduced. Additionally, we propose a simple model for describing the two-photon production of W^+W^- at the LHC. Using this model, we constrain the number of inelastic photons that remain after the experimental cuts are applied.展开更多
文摘The quality of the software product is a crucial factor that contributes to its success. Therefore, it is important to specify the right software quality requirements that will establish the basis for desired quality of the final system/software product. There are several known methodologies/ processes that support the specification of the system/software functional requirements starting from the user needs to finally obtain the system requirements that the developers can implement through their development process. System/software quality requirements are interdependent with functional requirements, which means that the system/software quality requirements are meant to be specified in parallel with the latter. The ISO/IEC 25000 [1] SQuaRE series of standards include the standard ISO/IEC 25030—Software engineering—Software Quality Requirements and Evaluation—Quality requirements [2], which has as main goal to help specify software quality requirements. As to date, this standard does not offer clear and concise steps that a software quality engineer could follow in order to specify them. This article presents modifications recommended for ISO/IEC 25030 standard, with, among the others, a new requirements definition process that allows for specifying the system/software quality requirements taking into account the existing published system and software quality model ISO/IEC 25010 [3] as well as all the stake- holders of the project.
基金National Defense Fund(No.20030119)NSFC(No.60775060)the Foundation Research Fund of Harbin Engineering University(No.HEUFT07027)
文摘Due to the complex,uncertainty and dynamics in the modern manufacturing environment,a flexible and robust shop floor scheduler is essential to achieve the production goals.A design framework of a shop floor dynamical scheduler is presented in this paper.The workflow and function modules of the scheduler are discussed in detail.A multi-step adaptive scheduling strategy and a process specification language,which is an ontology-based representation of process plan,are utilized in the proposed scheduler.The scheduler acquires the dispatching rule from the knowledge base and uses the build-in on-line simulator to evaluate the obtained rule.These technologies enable the scheduler to improve its fine-tune ability and effectively transfer process information into other heterogeneous information systems in a shop floor.The effectiveness of the suggested structure will be demonstrated via its application in the scheduling system of a manufacturing enterprise.
基金Supported by the U.S.National Science Foundation(PHY-1417326,PHY-1719914)the National Natural Science Foundation of China(11465018)
文摘As part of a recent analysis of exclusive two-photon production of W+W- pairs at the LHC, the CMS experiment used di-lepton data to obtain an "effective" photon-photon luminosity. We show how the CMS analysis on their 8 TeV data, along with some assumptions about the likelihood for events in which the proton breaks up to pass the selection criteria, can be used to significantly constrain the photon parton distribution functions, such as those from the CTEQ, MRST, and NNPDF collaborations. We compare the data with predictions using these photon distributions, as well as the new LUXqed photon distribution. We study the impact of including these data on the NNPDF2.3QED, NNPDF3.0QED and CT14QEDinc fits. We find that these data place a useful and complementary cross-check on the photon distribution, which is consistent with the LUXqed prediction while suggesting that the NNPDF photon error band should be significantly reduced. Additionally, we propose a simple model for describing the two-photon production of W^+W^- at the LHC. Using this model, we constrain the number of inelastic photons that remain after the experimental cuts are applied.