In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we d...In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we designed a scheduling algorithm based on genetic algorithm and proposed a flexible parallel decoding method which take full use of the personal capacity. Case study results indicate that the flexible personnel scheduling considering the order-shop scheduling, machine automatic capabilities and personnel flexible in the target of closing to the delivery date optimize the allocation of human resources, then maximize the efficiency.展开更多
基金Supported by Anhui Provincial Natural Science Foundation (1308085MF102)Fundamental Research Funds for the Central Universities(2012HGBZ0195)
文摘In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we designed a scheduling algorithm based on genetic algorithm and proposed a flexible parallel decoding method which take full use of the personal capacity. Case study results indicate that the flexible personnel scheduling considering the order-shop scheduling, machine automatic capabilities and personnel flexible in the target of closing to the delivery date optimize the allocation of human resources, then maximize the efficiency.