期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Gemdale Plaza Linked to Subway Line 1
1
《Beijing Review》 2009年第25期19-19,共1页
On May 26, 2009, Gemdale Plaza upgraded its convenient traffic network by connecting to Dawanglu Station on Subway Line 1 in Beijing. The shopping center at Gemdale Plaza provides easy access to the subway transport s... On May 26, 2009, Gemdale Plaza upgraded its convenient traffic network by connecting to Dawanglu Station on Subway Line 1 in Beijing. The shopping center at Gemdale Plaza provides easy access to the subway transport system.Located at the junction of Changan Avenue and CBD Commercial Circle, the link to subway transport will provide a major lift to the value of Gemdale Plaza. 展开更多
关键词 STUDIO Gemdale Plaza Linked to subway line 1
原文传递
Tengda Plaza Linked to Subway Line 4
2
《Beijing Review》 2009年第32期39-39,共1页
As we all know, this is a society where only efficiency wins, and only high speed may achieve high efficiency. Located near the National Library Station, Tengda Plaza will definitely embrace new development opportunit... As we all know, this is a society where only efficiency wins, and only high speed may achieve high efficiency. Located near the National Library Station, Tengda Plaza will definitely embrace new development opportunities provided by the official opening of Subway Line 4 this September. Tengda Plaza, as the 5A-grade office building in the western part of Beijing 展开更多
关键词 Tengda Plaza Linked to subway line 4
原文传递
Prediction of subsidence risk by FMEA using artificial neural network and fuzzy inference system 被引量:12
3
作者 Rafie Meraj Samimi Namin Farhad 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第4期655-663,共9页
Construction of metro tunnels in dense and crowded urban areas is faced with many risks, such as sub- sidence. The purpose of this paper was the prediction of subsidence risk by failure mode and effect anal- ysis (F... Construction of metro tunnels in dense and crowded urban areas is faced with many risks, such as sub- sidence. The purpose of this paper was the prediction of subsidence risk by failure mode and effect anal- ysis (FMEA) and fuzzy inference system (FIS). Fuzzy theory will be able to model uncertainties. Fuzzy FMEA provides a tool that can work in a better way with vague concepts and without sufficient informa- tion than conventional FMEA. In this paper, S and D are obtained from fuzzy rules and 0 is obtained from artificial neural network (ANN). FMEA is performed by developing a fuzzy risk priority number (FRPN). The FRPN for two stations in Tehran No.4 subway line is 3.1 and 5.5, respectively. To investigate the suit- ability of this approach, the predictions by FMEA have been compared with actual data. The results show that this method can be useful in the prediction of subsidence risk in urban tunnels. 展开更多
关键词 Subsidence risk Geotechnical uncertainty FMEA ANN Fuzzy Tehran No.4 subway line
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部