This study examines the design provisions of the Chinese GB 50011-2010 code for seismic design of buildings for the special boundary elements of T-shaped reinforced concrete walls and proposes an improved design metho...This study examines the design provisions of the Chinese GB 50011-2010 code for seismic design of buildings for the special boundary elements of T-shaped reinforced concrete walls and proposes an improved design method. Comparison of the design provisions of the GB 50011-2010 code and those of the American code ACI 318-14 indicates a possible deficiency in the T-shaped wall design provisions in GB 50011-2010. A case study of a typical T-shaped wall designed in accordance with GB 50011-2010 also indicates the insufficient extent of the boundary element at the non-flange end and overly conservative design of the flange end boundary element. Improved designs for special boundary elements ofT-shaped walls are developed using a displacement-based method. The proposed design formulas produce a longer boundary element at the non-flange end and a shorter boundary element at the flange end, relative to those of the GB 50011-2010 provisions. Extensive numerical analysis indicates that T-shaped walls designed using the proposed formulas develop inelastic drift of 0.01 for both cases of the flange in compression and in tension.展开更多
Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method...Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method. Top-down excavation of the Metro Line 10 in Shanghai was modeled with finite element analysis software ABAQUS and parameters of subsoil were obtained by inverse analysis. Based on the finite element model and parameters, changes in the following factors were made to find more effective methods to restrain differential uplift and settlement: length of diaphragm wall, thickness of jet-grouting reinforcement layer, ways of subsoil reinforcement, sequence of pit excavation, connection between slabs and diaphragm wall or column and width of pit. Several significant results are acquired. The longer the diaphragm wall is, the greater the differential uplift between column and diaphragm wall is. Rigidity of roof slab is in general not strong enough to keep diaphragm wall and column undergoing the same uplift during excavation; Uplift at head of column and differential uplift between column and diaphragm wall decrease when subsoil from-16.6 to-43 m in pit is reinforced through jet-grouting. But, as excavation proceeds to a lower level, benefit from soil reinforcement diminishes. During the process applying vertical load, the larger the depth of diaphragm wall is, the smaller the settlement is at head of column and diaphragm wall, and the greater the differential settlement is between column and diaphragm wall. When friction connection is implemented between column, diaphragm wall and floor slabs, uplifts at head of column and diaphragm wall are larger than those of the case when tie connection is implemented, and so does differential uplift between column and diaphragm wall. The maximum deflection of diaphragm wall decreases by 58% on account of soil reinforcement in pit. The maximum deflection of diaphragm wall decreases by 61.2% when friction connection is implemented instead of tie connection.展开更多
Deep excavation during the construction of underground systems can cause movement on the ground,especially in soft clay layers.At high levels,excessive ground movements can lead to severe damage to adjacent structures...Deep excavation during the construction of underground systems can cause movement on the ground,especially in soft clay layers.At high levels,excessive ground movements can lead to severe damage to adjacent structures.In this study,finite element analyses(FEM)and the hardening small strain(HSS)model were performed to investigate the deflection of the diaphragm wall in the soft clay layer induced by braced excavations.Different geometric and mechanical properties of the wall were investigated to study the deflection behavior of the wall in soft clays.Accordingly,1090 hypothetical cases were surveyed and simulated based on the HSS model and FEM to evaluate the wall deflection behavior.The results were then used to develop an intelligent model for predicting wall deflection using the functional linked neural network(FLNN)with different functional expansions and activation functions.Although the FLNN is a novel approach to predict wall deflection;however,in order to improve the accuracy of the FLNN model in predicting wall deflection,three swarm-based optimization algorithms,such as artificial bee colony(ABC),Harris’s hawk’s optimization(HHO),and hunger games search(HGS),were hybridized to the FLNN model to generate three novel intelligent models,namely ABC-FLNN,HHO-FLNN,HGS-FLNN.The results of the hybrid models were then compared with the basic FLNN and MLP models.They revealed that FLNN is a good solution for predicting wall deflection,and the application of different functional expansions and activation functions has a significant effect on the outcome predictions of the wall deflection.It is remarkably interesting that the performance of the FLNN model was better than the MLP model with a mean absolute error(MAE)of 19.971,root-mean-squared error(RMSE)of 24.574,and determination coefficient(R^(2))of 0.878.Meanwhile,the performance of the MLP model only obtained an MAE of 20.321,RMSE of 27.091,and R^(2)of 0.851.Furthermore,the results also indicated that the proposed hybrid models,i.e.,ABC-FLNN,HHO-FLNN,HGS-FLNN,yielded more superior performances than those of the FLNN and MLP models in terms of the prediction of deflection behavior of diaphragm walls with an MAE in the range of 11.877 to 12.239,RMSE in the range of 15.821 to 16.045,and R^(2)in the range of 0.949 to 0.951.They can be used as an alternative tool to simulate diaphragm wall deflections under different conditions with a high degree of accuracy.展开更多
A plane strain finite element model was established to investigate the effect of friction between diaphragm wall and soil on braced excavation. The behavior of interface between diaphragm wall and soil was simulated w...A plane strain finite element model was established to investigate the effect of friction between diaphragm wall and soil on braced excavation. The behavior of interface between diaphragm wall and soil was simulated with the interface model of ABAQUS. Parametric studies were conducted with different diaphragm wall external friction angles δ. The results show that deflection of diaphragm wall and ground surface settlement decrease with the decrease of δ. However, the reduction effect on diaphragm wall deflection is the most significant at the depth where the maximum wall deflection occurs and can be neglected at the wall base. The ratio between wall deep inward component and wall cantilever component reaches its peak value 2.7 when δ=5°. The ratio of the maximum ground surface settlement to the maximum wall lateral deflection decreases at a reduced rate with the increase of δ. For excavation with braced diaphragm wall, the effect of friction between diaphragm and soil on the deflection of diaphragm wall and ground settlement, especially the distribution of ground surface settlement behind diaphragm, should be taken into account.展开更多
According to the blasting construction of the diaphragm wall of Puxi approaching section of East Fuxing Road river-crossing tunnel, the monitoring project of the vibration of the existing tun-nel induced by the blasti...According to the blasting construction of the diaphragm wall of Puxi approaching section of East Fuxing Road river-crossing tunnel, the monitoring project of the vibration of the existing tun-nel induced by the blasting construction is put forward, which includes the sensors’ location, moni-tor method and the vibration monitoring system. Based on the monitoring data of the explosion vibration, the vibration wave forms, velocities, acceleration responses, main frequencies and fields of measure points are analyzed under the conditions of three locations and different charge quanti-ties. According to the safety-judging standard of explosion vibration, the conclusion that the exist- ing tunnel is safe under the explosion vibration is then drawn. Furthermore, the spectrum character-istics of three explosion vibrations and the spectrum changing properties of explosion vi-bration wave transmitting in different directions are concluded, which can provide reference to similar projects.展开更多
This paper presents a case study on an ultra-deep diaphragm wall with a depth of 110 m constructed in Ningbo City. The in-situ application shows that using Bauer BC40 cutter machine in conjunction with cutter wheels s...This paper presents a case study on an ultra-deep diaphragm wall with a depth of 110 m constructed in Ningbo City. The in-situ application shows that using Bauer BC40 cutter machine in conjunction with cutter wheels specified for different strata would be qualified for constructing the 110 m diaphragm wall with high efficiency and precision given that the quality of slurry and poured concrete can be guaranteed. The ground settlement can be effectively controlled by using the overlapping construction method. Sliding failure as a whole characterized by pronounced lateral deformation is likely to occur in the upper muddy clay layer due to its high compressibility and sensitivity. In contrast, local collapse of trench walls tends to happen in the sandy silt strata. Furthermore, careful attention should be paid to sandy silt during the entire construction period as the vertical displacement of the sandy silt continues to develop even atter concrete pouring.展开更多
基金International Science&Technology Cooperation Program of China under Grant No.2014DFA70950Tsinghua University Initiative Scientific Research Program under Grant No.2012THZ02-1National Natural Science Foundation of China under Grant No.91315301
文摘This study examines the design provisions of the Chinese GB 50011-2010 code for seismic design of buildings for the special boundary elements of T-shaped reinforced concrete walls and proposes an improved design method. Comparison of the design provisions of the GB 50011-2010 code and those of the American code ACI 318-14 indicates a possible deficiency in the T-shaped wall design provisions in GB 50011-2010. A case study of a typical T-shaped wall designed in accordance with GB 50011-2010 also indicates the insufficient extent of the boundary element at the non-flange end and overly conservative design of the flange end boundary element. Improved designs for special boundary elements ofT-shaped walls are developed using a displacement-based method. The proposed design formulas produce a longer boundary element at the non-flange end and a shorter boundary element at the flange end, relative to those of the GB 50011-2010 provisions. Extensive numerical analysis indicates that T-shaped walls designed using the proposed formulas develop inelastic drift of 0.01 for both cases of the flange in compression and in tension.
基金Projects(51208071,51108312) supported by the National Natural Science Foundation of China
文摘Top structure and basement will confront the risk of being damaged on account of large stress and strain fields incurred by differential uplift and settlement between inner column and diaphragm wall in top-down method. Top-down excavation of the Metro Line 10 in Shanghai was modeled with finite element analysis software ABAQUS and parameters of subsoil were obtained by inverse analysis. Based on the finite element model and parameters, changes in the following factors were made to find more effective methods to restrain differential uplift and settlement: length of diaphragm wall, thickness of jet-grouting reinforcement layer, ways of subsoil reinforcement, sequence of pit excavation, connection between slabs and diaphragm wall or column and width of pit. Several significant results are acquired. The longer the diaphragm wall is, the greater the differential uplift between column and diaphragm wall is. Rigidity of roof slab is in general not strong enough to keep diaphragm wall and column undergoing the same uplift during excavation; Uplift at head of column and differential uplift between column and diaphragm wall decrease when subsoil from-16.6 to-43 m in pit is reinforced through jet-grouting. But, as excavation proceeds to a lower level, benefit from soil reinforcement diminishes. During the process applying vertical load, the larger the depth of diaphragm wall is, the smaller the settlement is at head of column and diaphragm wall, and the greater the differential settlement is between column and diaphragm wall. When friction connection is implemented between column, diaphragm wall and floor slabs, uplifts at head of column and diaphragm wall are larger than those of the case when tie connection is implemented, and so does differential uplift between column and diaphragm wall. The maximum deflection of diaphragm wall decreases by 58% on account of soil reinforcement in pit. The maximum deflection of diaphragm wall decreases by 61.2% when friction connection is implemented instead of tie connection.
基金financially supported by the Natural Science Foundation of Hunan Province(2021JJ30679)。
文摘Deep excavation during the construction of underground systems can cause movement on the ground,especially in soft clay layers.At high levels,excessive ground movements can lead to severe damage to adjacent structures.In this study,finite element analyses(FEM)and the hardening small strain(HSS)model were performed to investigate the deflection of the diaphragm wall in the soft clay layer induced by braced excavations.Different geometric and mechanical properties of the wall were investigated to study the deflection behavior of the wall in soft clays.Accordingly,1090 hypothetical cases were surveyed and simulated based on the HSS model and FEM to evaluate the wall deflection behavior.The results were then used to develop an intelligent model for predicting wall deflection using the functional linked neural network(FLNN)with different functional expansions and activation functions.Although the FLNN is a novel approach to predict wall deflection;however,in order to improve the accuracy of the FLNN model in predicting wall deflection,three swarm-based optimization algorithms,such as artificial bee colony(ABC),Harris’s hawk’s optimization(HHO),and hunger games search(HGS),were hybridized to the FLNN model to generate three novel intelligent models,namely ABC-FLNN,HHO-FLNN,HGS-FLNN.The results of the hybrid models were then compared with the basic FLNN and MLP models.They revealed that FLNN is a good solution for predicting wall deflection,and the application of different functional expansions and activation functions has a significant effect on the outcome predictions of the wall deflection.It is remarkably interesting that the performance of the FLNN model was better than the MLP model with a mean absolute error(MAE)of 19.971,root-mean-squared error(RMSE)of 24.574,and determination coefficient(R^(2))of 0.878.Meanwhile,the performance of the MLP model only obtained an MAE of 20.321,RMSE of 27.091,and R^(2)of 0.851.Furthermore,the results also indicated that the proposed hybrid models,i.e.,ABC-FLNN,HHO-FLNN,HGS-FLNN,yielded more superior performances than those of the FLNN and MLP models in terms of the prediction of deflection behavior of diaphragm walls with an MAE in the range of 11.877 to 12.239,RMSE in the range of 15.821 to 16.045,and R^(2)in the range of 0.949 to 0.951.They can be used as an alternative tool to simulate diaphragm wall deflections under different conditions with a high degree of accuracy.
基金Project (07FDZDSF01200) supported by Tianjin Science and Technology Innovation Special Funds
文摘A plane strain finite element model was established to investigate the effect of friction between diaphragm wall and soil on braced excavation. The behavior of interface between diaphragm wall and soil was simulated with the interface model of ABAQUS. Parametric studies were conducted with different diaphragm wall external friction angles δ. The results show that deflection of diaphragm wall and ground surface settlement decrease with the decrease of δ. However, the reduction effect on diaphragm wall deflection is the most significant at the depth where the maximum wall deflection occurs and can be neglected at the wall base. The ratio between wall deep inward component and wall cantilever component reaches its peak value 2.7 when δ=5°. The ratio of the maximum ground surface settlement to the maximum wall lateral deflection decreases at a reduced rate with the increase of δ. For excavation with braced diaphragm wall, the effect of friction between diaphragm and soil on the deflection of diaphragm wall and ground settlement, especially the distribution of ground surface settlement behind diaphragm, should be taken into account.
文摘According to the blasting construction of the diaphragm wall of Puxi approaching section of East Fuxing Road river-crossing tunnel, the monitoring project of the vibration of the existing tun-nel induced by the blasting construction is put forward, which includes the sensors’ location, moni-tor method and the vibration monitoring system. Based on the monitoring data of the explosion vibration, the vibration wave forms, velocities, acceleration responses, main frequencies and fields of measure points are analyzed under the conditions of three locations and different charge quanti-ties. According to the safety-judging standard of explosion vibration, the conclusion that the exist- ing tunnel is safe under the explosion vibration is then drawn. Furthermore, the spectrum character-istics of three explosion vibrations and the spectrum changing properties of explosion vi-bration wave transmitting in different directions are concluded, which can provide reference to similar projects.
基金Funded by the National Basic Research Program of China(973 Program,No.2014CB046905)the National Natural Science Foundation of China(Grant Nos.41172249 and 51509186)+1 种基金the State Key Laboratory for Geomechanics and Deep Underground Engineering(No.SKLGDUEK1303)the funding provided by Zhuhai Da Heng Qin Company Limited(Grant No.SG25-2014-173B1)
文摘This paper presents a case study on an ultra-deep diaphragm wall with a depth of 110 m constructed in Ningbo City. The in-situ application shows that using Bauer BC40 cutter machine in conjunction with cutter wheels specified for different strata would be qualified for constructing the 110 m diaphragm wall with high efficiency and precision given that the quality of slurry and poured concrete can be guaranteed. The ground settlement can be effectively controlled by using the overlapping construction method. Sliding failure as a whole characterized by pronounced lateral deformation is likely to occur in the upper muddy clay layer due to its high compressibility and sensitivity. In contrast, local collapse of trench walls tends to happen in the sandy silt strata. Furthermore, careful attention should be paid to sandy silt during the entire construction period as the vertical displacement of the sandy silt continues to develop even atter concrete pouring.