The dual transmitter implements the equivalent anti-magnetic flux transient electromagnetic method, which can effectively reduce the scope of the transient electromagnetic detection blind area. However, this method is...The dual transmitter implements the equivalent anti-magnetic flux transient electromagnetic method, which can effectively reduce the scope of the transient electromagnetic detection blind area. However, this method is rarely reported in the detection of pipelines in urban geophysical exploration and the application of coal mines. Based on this, this paper realizes the equivalent anti-magnetic flux transient electromagnetic method based on the dual launcher. The suppression effect of this method on the blind area is analyzed by physical simulation. And the detection experiment of underground pipelines is carried out outdoors. The results show that the dual launcher can significantly reduce the turn-off time, thereby effectively reducing the impact of the blind area on the detection results, and the pipeline detection results verify the device’s effectiveness. Finally, based on the ground experimental results, the application prospect of mine advanced detection is discussed. Compared with other detection fields, the formation of blind areas is mainly caused by the equipment. If the dual launcher can be used to reduce the blind area, the accuracy of advanced detection can be improved more effectively. The above research results are of great significance for improving the detection accuracy of the underground transient electromagnetic method.展开更多
Unmanned aerial vehicle transient electromagnetic(UAV-TEM)is a novel airborne exploration method that offers advantages such as low cost,simple operation,high exploration efficiency and suitability for near-surface ex...Unmanned aerial vehicle transient electromagnetic(UAV-TEM)is a novel airborne exploration method that offers advantages such as low cost,simple operation,high exploration efficiency and suitability for near-surface exploration in complex terrain areas.To improve the accuracy of data interpretation in this method,the authors conducted a systematic three-dimensional(3D)forward modeling and inversion of the UAV-TEM.This study utilized the finite element method based on unstructured tetrahedral elements and employed the second-order backward Euler method for time discretization.This allowed for accurate 3D modeling and accounted for the effects of complex terrain.Based on these,the influence characteristics of flight altitudes and the sizes,burial depths,and resistivities of anomalies are compared and analyzed to explore the UAV-TEM systems’exploration capability.Lastly,four typical geoelectrical models of landslides are designed,and the inversion method based on the Gauss-Newton optimization method is used to image the landslide models and analyze the imaging effect of the UAV-TEM method on landslide geohazards.Numerical results showed that UAV-TEM could have better exploration resolution and fine imaging of nearsurface structures,providing important technical support for monitoring,early warning,and preventing landslides and other geological hazards.展开更多
This study used the stable and convergent Dufort-Frankel method to differentially discretize the diffusion equation of the ground-well transient electromagnetic secondary field.The absorption boundary condition of com...This study used the stable and convergent Dufort-Frankel method to differentially discretize the diffusion equation of the ground-well transient electromagnetic secondary field.The absorption boundary condition of complex frequency-shifted perfectly matched layer(CFS-PML)was used for truncation so that the low-frequency electromagnetic wave can be better absorbed at the model boundary.A typical three-dimensional(3D)homogeneous half-space model was established and a low-resistivity cube model was analyzed under the half-space condition.The response patterns and drivers of the low-resistivity cube model were discussed under the influence of a low-resistivity overburden.The absorption boundary conditions of CFS-PML significantly affected the low-frequency electromagnetic waves.For a low-resistivity cube around the borehole,its response curve exhibited a single-peak,and the extreme point of the curve corresponded to the center of the low-resistivity body.When the low-resistivity cube was directly below the borehole,the response curve showed three extreme values(two high and one low),with the low corresponding to the center of the low-resistivity body.The total field response of the low-resistivity overburden was stronger than that of the uniform half-space model due to the low-resistivity shielding effect of electromagnetic waves.When the receiving-transmitting distance gradually increased,the effect of the low-resistivity overburden was gradually weakened,and the response of the low-resistivity cube was strengthened.It was affected by the ratio of the overburden resistivity to the resistivity of the low-resistivity body.展开更多
For building Global Energy Interconnection(GEI), it is necessary to implement new breakthroughs on largepower system simulation. Key routes for implementing full electromagnetic transient simulation of large-power sys...For building Global Energy Interconnection(GEI), it is necessary to implement new breakthroughs on largepower system simulation. Key routes for implementing full electromagnetic transient simulation of large-power systems are described in this paper, and a top framework is designed. A combination of the new large time step algorithm and the traditional small-time step algorithm is proposed where both parts A and B are calculated independently. The method for integrating the Norton equivalence of the power electronic system to the entire power grid is proposed. A two-level gird division structure is proposed, which executes a multi-rate parallel calculation among subsystems and element parallel calculation in each subsystem. The initialization method of combining load flow derivation and automatic trial-and-error launching is introduced. The feasibility of the method is demonstrated through a practical power grid example, which lays a foundation for further research.展开更多
Transient electromagnetic (TEM) technique plays a significant role in mineral exploration. To accommodate the complicated survey environments in the west part of China, we developed a portable array TEM equipment (ATE...Transient electromagnetic (TEM) technique plays a significant role in mineral exploration. To accommodate the complicated survey environments in the west part of China, we developed a portable array TEM equipment (ATEM-1), which was implemented based upon the idea to apply the GPS timing signal for the synchronization among transmitters and receivers. The structure of the system and its performance are discussed and the case study is also described.展开更多
With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of l...With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of large scale photovoltaic power station. The computational speed will be very slow if electromagnetic transient model is used for stability study because of its complexity. Therefore, study on electromechanical transient model of grid-connected photovoltaic power generation system is of great meaning. In this paper, electromagnetic transient model of photovoltaic power generation system is introduced first, and then a general electromechanical transient model is proposed. These two kinds of simulation model are set up in PSCAD. By comparing the simulation results of two models, the correctness and validity of the electromechanical transient model is verified. It provides reference model for efficient simulation and modeling of grid-connected photovoltaic power station in large-scale power systems.展开更多
In the investigation of debris flow, the detection of the source area of the post-disaster debris flow is an important basis for evaluating the distribution of the debris flow accumulation layer and the subsequent con...In the investigation of debris flow, the detection of the source area of the post-disaster debris flow is an important basis for evaluating the distribution of the debris flow accumulation layer and the subsequent control. In this paper, a shallow high-resolution TEM is used to detect the debris flow source area in Dashigou village, Yongji County, Jilin Province. The purpose of this investigation is to determine the depth range of debris flow damage. The detection results show that there is an obvious low resistance zone at about 10 m depth along the survey line, which is in good agreement with the drilling data and the high density electrical detection. It is proved that the depth is the maximum impact depth of the debris flow. The practical engineering proves that the method has high resolution in shallow layer detection, high efficiency and convenience in field acquisition. The maximum detection depth range of this method is 30--40 m, which meets the requirements of high efficiency and accurate detection for regional debris flow source area, and has high practical application value.展开更多
This paper presents a mathematical model to calculate transients in grounding systems. The derived equations arise from direct application of basic electromagnetic equations in frequency domain, whose solution is obta...This paper presents a mathematical model to calculate transients in grounding systems. The derived equations arise from direct application of basic electromagnetic equations in frequency domain, whose solution is obtained by the application of the Moment Methods. A formulation based on experimental measurements is applied to quantify the soil parameters for each frequency. The unified approach is applied in the calculation of the grounding impedance of horizontal electrodes. Results show that the inclusion of frequency dependence of the soil parameters leads to a reduction of the values of grounding impedance, in comparison with results for soils with parameters independent of frequency.展开更多
The results of searching of equivalent for electromagnetic transient calculation in power system with the big number of transmission lines are shown. Brief information on the proper transmission line model is given. C...The results of searching of equivalent for electromagnetic transient calculation in power system with the big number of transmission lines are shown. Brief information on the proper transmission line model is given. Comparison of results of simulation in real and reduced system is presented taking into consideration three methods of identification. Some example are examined for different number of transmission lines in reduced system and consequently the recommendation are given for searching of equivalents of systems with many lines.展开更多
The research about subsurface characteristics by using transient electromagnetic method(TEM) and high density resistivity method(HDRM) were already conducted in Ordos. The objective of this research is to detect c...The research about subsurface characteristics by using transient electromagnetic method(TEM) and high density resistivity method(HDRM) were already conducted in Ordos. The objective of this research is to detect coalmine goaf areas based on rock resistivity. The data processing using wavelet transform, three point smoothing, RES2 DINV and Maxwell processing software to obtain 2D resistivity structure. The results showed that the layers with maximum resistivity values(30e33 U m on Line 1, 30e31 U m on Line 2, 32e40 U m on Line3) are founded at station 1e7, and 14e20 on Line 1,13e18 on Line 2, and 8e13 and 16e20 on Line 3 which is predicted as goaf layer, and the minimum resistivity values(20e26 U m of TEM, 45e75 U m of HDRM) at the other layers. This resistivity difference was caused by the geology and characteristics of the study area which is located close by the cleugh with rich coal, so the goaf area distinguishable with aquifer layer and coal seam. The results were also significant accidents and serious destruction of ecological environment.展开更多
The electromagnetic concentrative coils are indispensable in the functional magnetic stimulation and have potential applications in nondestructive testing. In this paper, we propose a figure-8-shaped coil being compos...The electromagnetic concentrative coils are indispensable in the functional magnetic stimulation and have potential applications in nondestructive testing. In this paper, we propose a figure-8-shaped coil being composed of two arbitrary oblique elliptical coils, which can change the electromagnetic concentrative region and the magnitude of eddy current density by changing the elliptical shape and/or spread angle between two elliptical coils. Pulsed current is usually the excitation source in the functional magnetic stimulation, so in this paper we derive the analytical solutions of transient pulsed eddy current field in the time domain due to the elliptical concentrative coil placed in an arbitrary position over a half-infinite plane conductor by making use of the scale-transformation, the Laplace transform and the Fourier transform are used in our derivation. Calculation results of field distributions produced by the figure-8-shaped elliptical coil show some behaviours as follows: 1) the eddy currents are focused on the conductor under the geometric symmetric centre of figure-8-shaped coil; 2) the greater the scale factor of ellipse is, the higher the eddy current density is and the wider the concentrative area of eddy current along y axis is; 3) the maximum magnitude of eddy current density increases with the increase of spread angle. When spread angle is 180°, there are two additional reverse concentrative areas on both sides of x axis.展开更多
Herein,a three-dimensional(3D)inversion method in the frequency domain based on a time–frequency transformation was developed to improve the efficiency of the 3D inversion of transient electromagnetic(TEM)data.The Fo...Herein,a three-dimensional(3D)inversion method in the frequency domain based on a time–frequency transformation was developed to improve the efficiency of the 3D inversion of transient electromagnetic(TEM)data.The Fourier transform related to the electromagnetic response in the frequency and time domains becomes a sine or cosine transform under the excitation of downward-step current.We established a transformation matrix based on the digital fi ltering calculation for the sine transform,and then the frequency domain projection of the TEM data was determined from the linear transformation system using the smoothing constrained least squares inversion method,in which only the imaginary part was used to maintain the TEM data transformation equivalence in the bidirectional projection.Thus,the time-domain TEM inversion problem was indirectly and effectively solved in the frequency domain.In the 3D inversion of the transformed frequency-domain data,the limited-memory Broyden–Fletcher–Goldfarb–Shannoquasi–Newton(L-BFGS)method was used and modifi ed with a restart strategy to adjust the regularization parameter when the algorithm tended to a local minimum.Synthetic data tests showed that our domain transformation method can stably project the TEM data into the frequency domain with very high accuracy;furthe rmore,the 3D inversion of the transformed frequency-domain data is stable,can be used to recover the real resistivity model with an acceptable effi ciency.展开更多
For conveniently calculating the radiated electric field of transverse electromagnetic(TEM) horn antenna,an approximate simplified analytical calculation method is suggested.This method divides the horn to a system of...For conveniently calculating the radiated electric field of transverse electromagnetic(TEM) horn antenna,an approximate simplified analytical calculation method is suggested.This method divides the horn to a system of V-antennas and superimposes the fields of all V-antennas to obtain the field of the TEM horn.The method is compared with the traditional analytical method and numerical method.The obtained results suggest that the proposed method is valid,simple and that it can fastly calculate the radiated electric field of the TEM horn antenna in an arbitrary space with an arbitrary excitation voltage.Based on this method,radiation of the TEM horn antenna of a high-altitude electromagnetic pulse(HEMP) simulator is simulated.Rise time,pulse width,peak value of electric field,and field distribution are analyzed.Results show that the TEM horn antenna can be used in HEMP simulators: the near field waveform is closer to the standard waveform than to the far field waveform; the standards for the rise time and the peak value of electric field are easily satisfied; the pulse width of the radiated field can be increased by broadening the pulse width of an excitation source and by making the antenna of a proper展开更多
In recent years,in order to meet the practical needs of deep edge mine detection with large depth and high precision,transient electromagnetic method(TEM)near emission source detection mode has become an international...In recent years,in order to meet the practical needs of deep edge mine detection with large depth and high precision,transient electromagnetic method(TEM)near emission source detection mode has become an international advanced method(Xue et al.,2020).展开更多
Tunneling machines, or excavators, are large and good conductors and affect the reliability of data gathering and inter-pretation in advanced detection using transient electromagnetic methods. In our experiment, we us...Tunneling machines, or excavators, are large and good conductors and affect the reliability of data gathering and inter-pretation in advanced detection using transient electromagnetic methods. In our experiment, we used a coincident-loop and central loop type of configuration, where the coil plane 1) vertical to and 2) parallel to the working face. A SIROTEM instrument at differ-ent locations was used to observe the transient electromagnetic responses of the excavator and to analyze the response amplitudes. The result shows that the tunneling machine affects the advanced detection data and is related to the way the coil is coupled. When the excavator is 6 m from the observatory, the interference of tunneling machine can be ignored.展开更多
Aiming at the complex electromagnetic transient process of EMU passing by phase-separation with electric load in high-speed railway, mechanism of overvoltage caused by switching off, overvoltage caused by switching on...Aiming at the complex electromagnetic transient process of EMU passing by phase-separation with electric load in high-speed railway, mechanism of overvoltage caused by switching off, overvoltage caused by switching on and impact current is analyzed systematically in this article. π-type equivalent circuit of feeding section is put forward in the analysis of overvoltage mechanism. Overvoltage and overcurrent model of passing by phase-separation with electric load are also built. Correctness of mechanism was validated by simulation. In addition, the methods to solve the influence on substations, transformers and protection devices in this process are put forward, which provides a new idea on passing by phase-separation with electric load technology.展开更多
Accuracy of time-depth conversion in data processing of transient electromagnetic prospecting always affects the accu- rate positioning of water bodies in coal mines. In order to improve the accuracy of time-depth con...Accuracy of time-depth conversion in data processing of transient electromagnetic prospecting always affects the accu- rate positioning of water bodies in coal mines. In order to improve the accuracy of time-depth conversion, we established a mathe- matical model of time-depth conversion for a transient electromagnetic method based on the theory of "double smoke ring effect" of full space transient electromagnetic field transmission. Using a 3-layer as well as a 4-layer geo-electric model for roadway floors, we performed the time-depth conversion of theoretical curves of apparent resistance varying over time. In these curves, the depth corresponding to extreme value points is nearly the same as the depth of a geo-electric model. The position of water body deter- mined by our time-depth conversion method agrees well with the result of borehole drilling, indicating that the established time-depth conversion model can clearly improve the accuracy of spatial positioning of water bodies in coal mines.展开更多
Buried water-conducting and water-bearing structures in front of the driving head may easily lead to water bursts in coal mines. Therefore,it is very important for the safety of production to make an accurate and time...Buried water-conducting and water-bearing structures in front of the driving head may easily lead to water bursts in coal mines. Therefore,it is very important for the safety of production to make an accurate and timely forecast about water bursts. Based on the smoke ring effect of transient electromagnetic fields,the principle of transient electro-magnetic method used in detecting buried water-bearing structures in coal mines in advance,is discussed. Small multi-turn loop configurations used in coal mines are proposed and a field procedure of semicircular sector scanning is presented. The application of this method in one coal mine indicates that the technology has many advantages compared with others. The method is inexpensive,highly accurate and efficient. Suggestions are presented for future solutions to some remaining problems.展开更多
In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position inf...In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position information of measuring point.Utilizing very fast simulated annealing(VFSA) to fit the theoretical electromagnetic force(EMF) and measured EMF could obtain the all-time apparent resistivity of the measuring points in rectangular transmitting loop.The selective cope of initial model of VFSA could be confirmed by taking the late time apparent resistivity of transient electromagnetic method as the prior information.For verifying the correctness,the all-time apparent resistivities of the geoelectric models were calculated by VFSA and dichotomy,respectively.The results indicate that the relative differences of apparent resistivities calculated by these two methods are within 3%.The change of measuring point position has little influence on the tracing pattern of all-time apparent resistivity.The first branch of the curve of all-time apparent resistivity is close to the resistivity of the first layer medium and the last branch is close to the resistivity of the last layer medium,which proves the correctness of the arithmetics proposed.展开更多
文摘The dual transmitter implements the equivalent anti-magnetic flux transient electromagnetic method, which can effectively reduce the scope of the transient electromagnetic detection blind area. However, this method is rarely reported in the detection of pipelines in urban geophysical exploration and the application of coal mines. Based on this, this paper realizes the equivalent anti-magnetic flux transient electromagnetic method based on the dual launcher. The suppression effect of this method on the blind area is analyzed by physical simulation. And the detection experiment of underground pipelines is carried out outdoors. The results show that the dual launcher can significantly reduce the turn-off time, thereby effectively reducing the impact of the blind area on the detection results, and the pipeline detection results verify the device’s effectiveness. Finally, based on the ground experimental results, the application prospect of mine advanced detection is discussed. Compared with other detection fields, the formation of blind areas is mainly caused by the equipment. If the dual launcher can be used to reduce the blind area, the accuracy of advanced detection can be improved more effectively. The above research results are of great significance for improving the detection accuracy of the underground transient electromagnetic method.
基金Supported by Key Research and Development Project of Guangxi Pr ovince(No.AB21196028).
文摘Unmanned aerial vehicle transient electromagnetic(UAV-TEM)is a novel airborne exploration method that offers advantages such as low cost,simple operation,high exploration efficiency and suitability for near-surface exploration in complex terrain areas.To improve the accuracy of data interpretation in this method,the authors conducted a systematic three-dimensional(3D)forward modeling and inversion of the UAV-TEM.This study utilized the finite element method based on unstructured tetrahedral elements and employed the second-order backward Euler method for time discretization.This allowed for accurate 3D modeling and accounted for the effects of complex terrain.Based on these,the influence characteristics of flight altitudes and the sizes,burial depths,and resistivities of anomalies are compared and analyzed to explore the UAV-TEM systems’exploration capability.Lastly,four typical geoelectrical models of landslides are designed,and the inversion method based on the Gauss-Newton optimization method is used to image the landslide models and analyze the imaging effect of the UAV-TEM method on landslide geohazards.Numerical results showed that UAV-TEM could have better exploration resolution and fine imaging of nearsurface structures,providing important technical support for monitoring,early warning,and preventing landslides and other geological hazards.
基金This work was supported by China Postdoctoral Science Foundation(No.2022M723391)the Science and Technology Innovation Project of Higher Education in Shanxi Province(No.2019L0754)+1 种基金the Central Guiding Local Science and Technology Development Fund Project(No.YDZJSX2021B021)Shanxi Province Basic Research Plan General Project(No.202203021221294).
文摘This study used the stable and convergent Dufort-Frankel method to differentially discretize the diffusion equation of the ground-well transient electromagnetic secondary field.The absorption boundary condition of complex frequency-shifted perfectly matched layer(CFS-PML)was used for truncation so that the low-frequency electromagnetic wave can be better absorbed at the model boundary.A typical three-dimensional(3D)homogeneous half-space model was established and a low-resistivity cube model was analyzed under the half-space condition.The response patterns and drivers of the low-resistivity cube model were discussed under the influence of a low-resistivity overburden.The absorption boundary conditions of CFS-PML significantly affected the low-frequency electromagnetic waves.For a low-resistivity cube around the borehole,its response curve exhibited a single-peak,and the extreme point of the curve corresponded to the center of the low-resistivity body.When the low-resistivity cube was directly below the borehole,the response curve showed three extreme values(two high and one low),with the low corresponding to the center of the low-resistivity body.The total field response of the low-resistivity overburden was stronger than that of the uniform half-space model due to the low-resistivity shielding effect of electromagnetic waves.When the receiving-transmitting distance gradually increased,the effect of the low-resistivity overburden was gradually weakened,and the response of the low-resistivity cube was strengthened.It was affected by the ratio of the overburden resistivity to the resistivity of the low-resistivity body.
基金supported by key project of smart grid technology and equipment of national key research and development plan of China (2016YFB0900601)
文摘For building Global Energy Interconnection(GEI), it is necessary to implement new breakthroughs on largepower system simulation. Key routes for implementing full electromagnetic transient simulation of large-power systems are described in this paper, and a top framework is designed. A combination of the new large time step algorithm and the traditional small-time step algorithm is proposed where both parts A and B are calculated independently. The method for integrating the Norton equivalence of the power electronic system to the entire power grid is proposed. A two-level gird division structure is proposed, which executes a multi-rate parallel calculation among subsystems and element parallel calculation in each subsystem. The initialization method of combining load flow derivation and automatic trial-and-error launching is introduced. The feasibility of the method is demonstrated through a practical power grid example, which lays a foundation for further research.
文摘Transient electromagnetic (TEM) technique plays a significant role in mineral exploration. To accommodate the complicated survey environments in the west part of China, we developed a portable array TEM equipment (ATEM-1), which was implemented based upon the idea to apply the GPS timing signal for the synchronization among transmitters and receivers. The structure of the system and its performance are discussed and the case study is also described.
文摘With the development of new energy technology, there are increasing applications of grid-connected photovoltaic power generation system. However, there is little research on development of electromechanical model of large scale photovoltaic power station. The computational speed will be very slow if electromagnetic transient model is used for stability study because of its complexity. Therefore, study on electromechanical transient model of grid-connected photovoltaic power generation system is of great meaning. In this paper, electromagnetic transient model of photovoltaic power generation system is introduced first, and then a general electromechanical transient model is proposed. These two kinds of simulation model are set up in PSCAD. By comparing the simulation results of two models, the correctness and validity of the electromechanical transient model is verified. It provides reference model for efficient simulation and modeling of grid-connected photovoltaic power station in large-scale power systems.
文摘In the investigation of debris flow, the detection of the source area of the post-disaster debris flow is an important basis for evaluating the distribution of the debris flow accumulation layer and the subsequent control. In this paper, a shallow high-resolution TEM is used to detect the debris flow source area in Dashigou village, Yongji County, Jilin Province. The purpose of this investigation is to determine the depth range of debris flow damage. The detection results show that there is an obvious low resistance zone at about 10 m depth along the survey line, which is in good agreement with the drilling data and the high density electrical detection. It is proved that the depth is the maximum impact depth of the debris flow. The practical engineering proves that the method has high resolution in shallow layer detection, high efficiency and convenience in field acquisition. The maximum detection depth range of this method is 30--40 m, which meets the requirements of high efficiency and accurate detection for regional debris flow source area, and has high practical application value.
基金financial support provided by Energetic Company of Minas Gerais(CE-MIG)
文摘This paper presents a mathematical model to calculate transients in grounding systems. The derived equations arise from direct application of basic electromagnetic equations in frequency domain, whose solution is obtained by the application of the Moment Methods. A formulation based on experimental measurements is applied to quantify the soil parameters for each frequency. The unified approach is applied in the calculation of the grounding impedance of horizontal electrodes. Results show that the inclusion of frequency dependence of the soil parameters leads to a reduction of the values of grounding impedance, in comparison with results for soils with parameters independent of frequency.
文摘The results of searching of equivalent for electromagnetic transient calculation in power system with the big number of transmission lines are shown. Brief information on the proper transmission line model is given. Comparison of results of simulation in real and reduced system is presented taking into consideration three methods of identification. Some example are examined for different number of transmission lines in reduced system and consequently the recommendation are given for searching of equivalents of systems with many lines.
基金supported by the Institute of Seismology Foundation, China Earthquake Administration (201326126)
文摘The research about subsurface characteristics by using transient electromagnetic method(TEM) and high density resistivity method(HDRM) were already conducted in Ordos. The objective of this research is to detect coalmine goaf areas based on rock resistivity. The data processing using wavelet transform, three point smoothing, RES2 DINV and Maxwell processing software to obtain 2D resistivity structure. The results showed that the layers with maximum resistivity values(30e33 U m on Line 1, 30e31 U m on Line 2, 32e40 U m on Line3) are founded at station 1e7, and 14e20 on Line 1,13e18 on Line 2, and 8e13 and 16e20 on Line 3 which is predicted as goaf layer, and the minimum resistivity values(20e26 U m of TEM, 45e75 U m of HDRM) at the other layers. This resistivity difference was caused by the geology and characteristics of the study area which is located close by the cleugh with rich coal, so the goaf area distinguishable with aquifer layer and coal seam. The results were also significant accidents and serious destruction of ecological environment.
基金Project supported by the National Natural Science Foundation of China (Grant No. 50807001)
文摘The electromagnetic concentrative coils are indispensable in the functional magnetic stimulation and have potential applications in nondestructive testing. In this paper, we propose a figure-8-shaped coil being composed of two arbitrary oblique elliptical coils, which can change the electromagnetic concentrative region and the magnitude of eddy current density by changing the elliptical shape and/or spread angle between two elliptical coils. Pulsed current is usually the excitation source in the functional magnetic stimulation, so in this paper we derive the analytical solutions of transient pulsed eddy current field in the time domain due to the elliptical concentrative coil placed in an arbitrary position over a half-infinite plane conductor by making use of the scale-transformation, the Laplace transform and the Fourier transform are used in our derivation. Calculation results of field distributions produced by the figure-8-shaped elliptical coil show some behaviours as follows: 1) the eddy currents are focused on the conductor under the geometric symmetric centre of figure-8-shaped coil; 2) the greater the scale factor of ellipse is, the higher the eddy current density is and the wider the concentrative area of eddy current along y axis is; 3) the maximum magnitude of eddy current density increases with the increase of spread angle. When spread angle is 180°, there are two additional reverse concentrative areas on both sides of x axis.
基金the National Key Research and Development Program of China(No.2016YFC060110403).
文摘Herein,a three-dimensional(3D)inversion method in the frequency domain based on a time–frequency transformation was developed to improve the efficiency of the 3D inversion of transient electromagnetic(TEM)data.The Fourier transform related to the electromagnetic response in the frequency and time domains becomes a sine or cosine transform under the excitation of downward-step current.We established a transformation matrix based on the digital fi ltering calculation for the sine transform,and then the frequency domain projection of the TEM data was determined from the linear transformation system using the smoothing constrained least squares inversion method,in which only the imaginary part was used to maintain the TEM data transformation equivalence in the bidirectional projection.Thus,the time-domain TEM inversion problem was indirectly and effectively solved in the frequency domain.In the 3D inversion of the transformed frequency-domain data,the limited-memory Broyden–Fletcher–Goldfarb–Shannoquasi–Newton(L-BFGS)method was used and modifi ed with a restart strategy to adjust the regularization parameter when the algorithm tended to a local minimum.Synthetic data tests showed that our domain transformation method can stably project the TEM data into the frequency domain with very high accuracy;furthe rmore,the 3D inversion of the transformed frequency-domain data is stable,can be used to recover the real resistivity model with an acceptable effi ciency.
基金Project supported by National Natural Science Foundation of China(51177174).
文摘For conveniently calculating the radiated electric field of transverse electromagnetic(TEM) horn antenna,an approximate simplified analytical calculation method is suggested.This method divides the horn to a system of V-antennas and superimposes the fields of all V-antennas to obtain the field of the TEM horn.The method is compared with the traditional analytical method and numerical method.The obtained results suggest that the proposed method is valid,simple and that it can fastly calculate the radiated electric field of the TEM horn antenna in an arbitrary space with an arbitrary excitation voltage.Based on this method,radiation of the TEM horn antenna of a high-altitude electromagnetic pulse(HEMP) simulator is simulated.Rise time,pulse width,peak value of electric field,and field distribution are analyzed.Results show that the TEM horn antenna can be used in HEMP simulators: the near field waveform is closer to the standard waveform than to the far field waveform; the standards for the rise time and the peak value of electric field are easily satisfied; the pulse width of the radiated field can be increased by broadening the pulse width of an excitation source and by making the antenna of a proper
基金project supported by Science and Technology Innovation Fund(Grant No.KDY2019001)Integrated Geophysical Simulation Lab of Chang’an University(Key Laboratory of Chinese Geophysical Society)
文摘In recent years,in order to meet the practical needs of deep edge mine detection with large depth and high precision,transient electromagnetic method(TEM)near emission source detection mode has become an international advanced method(Xue et al.,2020).
基金support received from the National Basic Research Program of China (No2007CB209400)the National Natural Science Foundation of China (No50774085)the Young Scientists Fund of the School Science Foundation of CUMT (No2008A046)
文摘Tunneling machines, or excavators, are large and good conductors and affect the reliability of data gathering and inter-pretation in advanced detection using transient electromagnetic methods. In our experiment, we used a coincident-loop and central loop type of configuration, where the coil plane 1) vertical to and 2) parallel to the working face. A SIROTEM instrument at differ-ent locations was used to observe the transient electromagnetic responses of the excavator and to analyze the response amplitudes. The result shows that the tunneling machine affects the advanced detection data and is related to the way the coil is coupled. When the excavator is 6 m from the observatory, the interference of tunneling machine can be ignored.
文摘Aiming at the complex electromagnetic transient process of EMU passing by phase-separation with electric load in high-speed railway, mechanism of overvoltage caused by switching off, overvoltage caused by switching on and impact current is analyzed systematically in this article. π-type equivalent circuit of feeding section is put forward in the analysis of overvoltage mechanism. Overvoltage and overcurrent model of passing by phase-separation with electric load are also built. Correctness of mechanism was validated by simulation. In addition, the methods to solve the influence on substations, transformers and protection devices in this process are put forward, which provides a new idea on passing by phase-separation with electric load technology.
基金Project 2007CB209400 supported by the National Basic Research Program of China
文摘Accuracy of time-depth conversion in data processing of transient electromagnetic prospecting always affects the accu- rate positioning of water bodies in coal mines. In order to improve the accuracy of time-depth conversion, we established a mathe- matical model of time-depth conversion for a transient electromagnetic method based on the theory of "double smoke ring effect" of full space transient electromagnetic field transmission. Using a 3-layer as well as a 4-layer geo-electric model for roadway floors, we performed the time-depth conversion of theoretical curves of apparent resistance varying over time. In these curves, the depth corresponding to extreme value points is nearly the same as the depth of a geo-electric model. The position of water body deter- mined by our time-depth conversion method agrees well with the result of borehole drilling, indicating that the established time-depth conversion model can clearly improve the accuracy of spatial positioning of water bodies in coal mines.
基金Project 40674074 supported by the National Natural Science Foundation of China20050290501 by the Specialized Research Fund for the Doctoral Programof Higher EducationD200409 by the Scientific Research Fund for Youth of China University of Mining & Technology
文摘Buried water-conducting and water-bearing structures in front of the driving head may easily lead to water bursts in coal mines. Therefore,it is very important for the safety of production to make an accurate and timely forecast about water bursts. Based on the smoke ring effect of transient electromagnetic fields,the principle of transient electro-magnetic method used in detecting buried water-bearing structures in coal mines in advance,is discussed. Small multi-turn loop configurations used in coal mines are proposed and a field procedure of semicircular sector scanning is presented. The application of this method in one coal mine indicates that the technology has many advantages compared with others. The method is inexpensive,highly accurate and efficient. Suggestions are presented for future solutions to some remaining problems.
基金Projects(40804027,41074085) supported by the National Natural Science Foundation of ChinaProject(09JJ3048) supported by the Natural Science Foundation of Hunan Province,ChinaProject(200805331082) supported by the Research Fund for the Doctoral Program of Higher Education,China
文摘In large loop transient electromagnetic method(TEM),the late time apparent resistivity formula cannot truly reflect the geoelectric model,thus it needs to define the all-time apparent resistivity with the position information of measuring point.Utilizing very fast simulated annealing(VFSA) to fit the theoretical electromagnetic force(EMF) and measured EMF could obtain the all-time apparent resistivity of the measuring points in rectangular transmitting loop.The selective cope of initial model of VFSA could be confirmed by taking the late time apparent resistivity of transient electromagnetic method as the prior information.For verifying the correctness,the all-time apparent resistivities of the geoelectric models were calculated by VFSA and dichotomy,respectively.The results indicate that the relative differences of apparent resistivities calculated by these two methods are within 3%.The change of measuring point position has little influence on the tracing pattern of all-time apparent resistivity.The first branch of the curve of all-time apparent resistivity is close to the resistivity of the first layer medium and the last branch is close to the resistivity of the last layer medium,which proves the correctness of the arithmetics proposed.
基金Supported by the Key Projects of Anhui Provincial Scientific and Technological Program (11010401015) the Key Program of National Natural Science Foundation of China (51134012)