The goal of this work is creation of optimal grounding model at the substation 10/0.4 kV of the urban power distribution network. The electric current can pose a major threat to the man’s life and health. In addition...The goal of this work is creation of optimal grounding model at the substation 10/0.4 kV of the urban power distribution network. The electric current can pose a major threat to the man’s life and health. In addition to pose a threat for health, the rise of the short circuit, as a consequence of insulation faults, poses a threat to retirement of electric systems and fire risks. The reliable grounding system design has significant implications for protection of human being as well as for electrical facility protection. The set objective was performed on the base of analytical and software-based methods. Analytical method gives a qualitative indication at each step in analysis. It also allows evaluating the values effect on the result, but the method is not susceptible of tolerable accuracy, that is why analytical method serves as initial approximation in differentiating. Specified estimation can be performed in such software package as MATLAB or ETAP. Software-based estimation is based on the finite element method (FEM), the main advantage of which is the ability to create different forms of grounding and allows obtaining distribution graphs of the step potential on the earth’s surface and touch potential. The calculation results in comparison of analytical and software-based methods taking into account the grounding optimization. There are conclusions on the most effective ground network.展开更多
针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示...针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。展开更多
文摘The goal of this work is creation of optimal grounding model at the substation 10/0.4 kV of the urban power distribution network. The electric current can pose a major threat to the man’s life and health. In addition to pose a threat for health, the rise of the short circuit, as a consequence of insulation faults, poses a threat to retirement of electric systems and fire risks. The reliable grounding system design has significant implications for protection of human being as well as for electrical facility protection. The set objective was performed on the base of analytical and software-based methods. Analytical method gives a qualitative indication at each step in analysis. It also allows evaluating the values effect on the result, but the method is not susceptible of tolerable accuracy, that is why analytical method serves as initial approximation in differentiating. Specified estimation can be performed in such software package as MATLAB or ETAP. Software-based estimation is based on the finite element method (FEM), the main advantage of which is the ability to create different forms of grounding and allows obtaining distribution graphs of the step potential on the earth’s surface and touch potential. The calculation results in comparison of analytical and software-based methods taking into account the grounding optimization. There are conclusions on the most effective ground network.
文摘针对在越江海高水压水下超大直径盾构隧道联络通道施工过程中缺乏足够的工程技术标准和案例经验、设计与施工面临众多挑战问题,以广州海珠湾超大直径盾构隧道区间的6条联络通道工程为例,对工程地质补勘资料及现场施工情况进行分析,揭示原矿山法设计施工方案存在的不足,并基于此提出“矿山法结合地层冻结加固方案”和“机械顶管法施工方案”2种优化方案;随后在安全性、经济性、施工工期等方面对不同工法进行综合优选分析,同时引入碳排放指标进行绿色低碳评估。研究结果表明:1)机械顶管法在安全性和施工效率上优于其他方案,能够显著缩短施工周期;2)相比矿山法结合地层冻结加固方案,机械顶管法方案碳排放量减少了2 747.51 t CO_(2e)。