期刊文献+
共找到9篇文章
< 1 >
每页显示 20 50 100
1133.5 MW Small Thermal Power Units to be Shut Down in Jiangsu
1
《Electricity》 1999年第3期51-51,共1页
关键词 MW Small thermal power units to be Shut Down in Jiangsu DOWN
下载PDF
Primary Frequency Control Ability Evaluation of Valve Opening in Thermal Power Units Based on Artificial Neural Network 被引量:1
2
作者 LIAO Jinlong LUO Zhihao +4 位作者 YIN Feng CHEN Bo SHENG Deren LI Wei YU Zitao 《Journal of Thermal Science》 SCIE EI CAS CSCD 2020年第3期576-586,共11页
With the development of new energy,the primary frequency control(PFC)is becoming more and more important and complicated.To improve the reliability of the PFC,an evaluation method of primary frequency control ability(... With the development of new energy,the primary frequency control(PFC)is becoming more and more important and complicated.To improve the reliability of the PFC,an evaluation method of primary frequency control ability(PFCA)was proposed.First,based on the coupling model of the coordinated control system(CCS)and digital electro-hydraulic control system(DEH),principle and control mode of the PFC were introduced in detail.The simulation results showed that the PFC of the CCS and DEH was the most effective control mode.Then,the analysis of the CCS model and variable condition revealed the internal relationship among main steam pressure,valve opening and power.In term of this,the radial basis function(RBF)neural network was established to estimate the PFCA.Because the simulation curves fit well with the actual curves,the accuracy of the coupling model was verified.On this basis,simulation data was produced by coupling model to verify the proposed evaluation method.The low predication error of main steam pressure,power and the PFCA indicated that the method was effective.In addition,the actual data obtained from historical operation data were used to estimate the PFCA accurately,which was the strongest evidence for this method. 展开更多
关键词 primary frequency control valve opening main steam pressure thermal power unit artificial neural network EVALUATION
原文传递
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
3
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of thermal power Generating units Raise the Effectiveness of power Plant Comprehensively
下载PDF
Research on the Prediction of Load Regulation Capacity for Supercritical Thermal Power Unit
4
作者 Yong He Zhuo Huang +3 位作者 Yaohua Tang Weimin Guo Yuanli Cai Haonan Jiang 《Journal of Power and Energy Engineering》 2020年第8期23-36,共14页
Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is propos... Both the modeling and the load regulation capacity prediction of a supercritical power plant are investigated in this paper. Firstly, an indirect identification method based on subspace identification method is proposed. The obtained identification model is verified by the actual operation data and the dynamic characteristics of the system are well reproduced. Secondly, the model is used to predict the load regulation capacity of thermal power unit. The power, main steam pressure, main steam temperature and other parameters are simulated respectively when the unit load is going up and down. Under the actual constraints, the load regulation capacity of thermal power unit can be predicted quickly. 展开更多
关键词 Supercritical thermal power Unit Subspace Identification Indirect Identification Load Regulation
下载PDF
The Largest Thermal Power Unit in Northwest Network Starts Construction Soon
5
《Electricity》 1997年第3期50-50,共1页
关键词 The Largest thermal power Unit in Northwest Network Starts Construction Soon
下载PDF
Source-Load Coordinated Optimal Scheduling Considering the High Energy Load of Electrofused Magnesium and Wind Power Uncertainty
6
作者 Juan Li Tingting Xu +3 位作者 Yi Gu Chuang Liu Guiping Zhou Guoliang Bian 《Energy Engineering》 EI 2024年第10期2777-2795,共19页
In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional un... In fossil energy pollution is serious and the“double carbon”goal is being promoted,as a symbol of fresh energy in the electrical system,solar and wind power have an increasing installed capacity,only conventional units obviously can not solve the new energy as the main body of the scheduling problem.To enhance the systemscheduling ability,based on the participation of thermal power units,incorporate the high energy-carrying load of electro-melting magnesiuminto the regulation object,and consider the effects on the wind unpredictability of the power.Firstly,the operating characteristics of high energy load and wind power are analyzed,and the principle of the participation of electrofusedmagnesiumhigh energy-carrying loads in the elimination of obstructedwind power is studied.Second,a two-layer optimization model is suggested,with the objective function being the largest amount of wind power consumed and the lowest possible cost of system operation.In the upper model,the high energy-carrying load regulates the blocked wind power,and in the lower model,the second-order cone approximation algorithm is used to solve the optimizationmodelwithwind power uncertainty,so that a two-layer optimizationmodel that takes into account the regulation of the high energy-carrying load of the electrofused magnesium and the uncertainty of the wind power is established.Finally,the model is solved using Gurobi,and the results of the simulation demonstrate that the suggested model may successfully lower wind abandonment,lower system operation costs,increase the accuracy of day-ahead scheduling,and lower the final product error of the thermal electricity unit. 展开更多
关键词 High energy load of electrofused magnesium wind energy consumption thermal power unit wind power uncertainty two-layer optimization
下载PDF
500 MW Unit Simulator for Panshan Thermal Power Plant Passed Acceptance
7
《Electricity》 1996年第4期36-36,共1页
After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power w... After a thorough demonstration in Panshan Thermal Power Plant, the 500 MW super critical pressure unit simulator developed by the Simulation & Control Institute under the North China University of Electric Power was accepted by experts from the North China Electric Power Group Company on 3rd August 1996. 展开更多
关键词 MW Unit Simulator for Panshan thermal power Plant Passed Acceptance IP
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
8
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan thermal power Plant went into commercial operation
下载PDF
Research and Demonstration of Direct Air-Cooling System for 600-MW Fossil-Fired Power Plants
9
作者 Zhang Xiaolu 1 , Wang Jianping 2 , Hu Zhenling 3 1. China Power Investment Corporation 2. China Power Engineering Consulting Group Corporation 3. Harbin Air Conditioning Co., Ltd., 《Electricity》 2011年第4期46-51,共6页
Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant t... Given the distribution feature of resources such as coal and water, the requirements for the development of Chinese power industry, and the fact of monopoly by foreign companies, it is very necessary and significant to independently research and develop air-cooling technologies. Through experimental research, simulative calculation, process and equipment development, field tests and a demonstration project, the design and operation technologies for air-cooling system are grasped and relevant key equipment is developed. The results of the demonstration project show that the technical indicators for the air-cooling system have met or exceeded the design requirements. Part of the research results have been incorporated into the relevant national design standards. The technologies developed have been applied to more than 23 sets of thermal power units of or above 600 MW in China. 展开更多
关键词 thermal power generating unit air-cooling direct air-cooling project demonstration
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部