Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on...Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons.展开更多
In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth constru...In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.展开更多
文摘Considering the additional electric energy generated after the full operation of the underground hydropower station, the electric energy accommodation of the Three Gorges Project (TGP) is reviewed. It is .focused on the additional electricity accommodation, based on the research at the earl), stage. The electric energ), accommodation solutions ate recommended as that. based on the cost-benefit analysis of the power distribution area, the additional electric energy of the Three Gorges should be given ptqority to meet the needs at the supply end of Hubei and Chongqing. The results of this research has a reference value on the implementation of the Three Gorges electric power accommodation, after the further optimization of the transmission curves in both wet and dry seasons.
文摘In view of its huge installed capacity and very complex transmission system,the design process of China's Three Gorges Hydropower Station had been repeatedly demonstrated for more than ten years.The smooth construction,bringing into production and operation show that the planning scheme for Three Gorges power transmission project is successful.In this paper the design course of Three Gorges power transmission system is retrospected;the main planning schemes for Three Gorges power transmission system are reviewed;and the design results in different design stages are summarized.