To effectively solve the traffic data problems such as data invalidation in the process of the acquisition of road traffic states,a road traffic states estimation algorithm based on matching of the regional traffic at...To effectively solve the traffic data problems such as data invalidation in the process of the acquisition of road traffic states,a road traffic states estimation algorithm based on matching of the regional traffic attracters was proposed in this work.First of all,the road traffic running states were divided into several different modes.The concept of the regional traffic attracters of the target link was put forward for effective matching.Then,the reference sequences of characteristics of traffic running states with the contents of the target link's traffic running states and regional traffic attracters under different modes were established.In addition,the current and historical regional traffic attracters of the target link were matched through certain matching rules,and the historical traffic running states of the target link corresponding to the optimal matching were selected as the initial recovery data,which were processed with Kalman filter to obtain the final recovery data.Finally,some typical expressways in Beijing were adopted for the verification of this road traffic states estimation algorithm.The results prove that this traffic states estimation approach based on matching of the regional traffic attracters is feasible and can achieve a high accuracy.展开更多
Traffic is a function of land use. Based on the understanding of mutual influences between transportation investment and land development, transportation corridors of various levels in Great Chengdu Area (GCA) were ...Traffic is a function of land use. Based on the understanding of mutual influences between transportation investment and land development, transportation corridors of various levels in Great Chengdu Area (GCA) were investigated. Trip generation was predicted based on population expansion, and trip attraction was estimated based on land use intensity coefficient. Lane assignment of transportation corridors with case studies is expected with two-way-six-lane routes connecting county-cities, two-way-four-lane routes connecting new towns in plane area, and two-way-two-lane connecting new towns in hilly area and prime villages.展开更多
基金Projects(D07020601400707,D101106049710005)supported by the Beijing Science Foundation Plan Project,ChinaProjects(2006AA11Z231,2012AA112401)supported by the National High Technology Research and Development Program of China(863 Program)Project(61104164)supported by the National Natural Science Foundation of China
文摘To effectively solve the traffic data problems such as data invalidation in the process of the acquisition of road traffic states,a road traffic states estimation algorithm based on matching of the regional traffic attracters was proposed in this work.First of all,the road traffic running states were divided into several different modes.The concept of the regional traffic attracters of the target link was put forward for effective matching.Then,the reference sequences of characteristics of traffic running states with the contents of the target link's traffic running states and regional traffic attracters under different modes were established.In addition,the current and historical regional traffic attracters of the target link were matched through certain matching rules,and the historical traffic running states of the target link corresponding to the optimal matching were selected as the initial recovery data,which were processed with Kalman filter to obtain the final recovery data.Finally,some typical expressways in Beijing were adopted for the verification of this road traffic states estimation algorithm.The results prove that this traffic states estimation approach based on matching of the regional traffic attracters is feasible and can achieve a high accuracy.
文摘Traffic is a function of land use. Based on the understanding of mutual influences between transportation investment and land development, transportation corridors of various levels in Great Chengdu Area (GCA) were investigated. Trip generation was predicted based on population expansion, and trip attraction was estimated based on land use intensity coefficient. Lane assignment of transportation corridors with case studies is expected with two-way-six-lane routes connecting county-cities, two-way-four-lane routes connecting new towns in plane area, and two-way-two-lane connecting new towns in hilly area and prime villages.