According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through ...The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined.展开更多
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘The water-diverting route project’s characteristics,natural landscapes,and histories and humanism of the Jiangsu Section of the Eastern Route South-to-North Water Diversion Project were systemically analyzed through proposing and studying the canal culture routes,the water resources heritage corridors,the landscape and recreation corridors,and the town economic corridors.The station areas along the water-diverting route were scientifically zoned and graded through quantitative and qualitative synthetic methods.Both planning compendiums and construction controlling methods were proposed based on the project grades of points,lines,and areas.Conservation and development of architecture and environment in the large-scale national infrastructure construction were explored systemically.Theories and methods of developing harmonious water-supplying functions,ecological functions,landscape effects,and cultural effects of large-scale water resources were examined.