Steeply dipping,vein and tabular orebodies are traditionally extracted with longitudinal retreat mining methods such as Eureka and Avoca in a bottom-up sequence with delayed backfill.To increase productivity,sill pill...Steeply dipping,vein and tabular orebodies are traditionally extracted with longitudinal retreat mining methods such as Eureka and Avoca in a bottom-up sequence with delayed backfill.To increase productivity,sill pillars in the orebody are used to separate mining zones thus allowing production to take place simultaneously in two or more zones.While such mining methods are productive,they may be accompanied with high volumes of hanging wall overbreak causing significant unplanned ore dilution.In this work,it is shown through a mine design case study of a narrow vein deposit that a sill pillar could also play a significant role in limiting hanging wall overbreak.To demonstrate the role of sill pillar,a novel numerical modelling scheme is proposed to account for progressive stope wall overbreak.A numerical modelling approach of element death and rebirth is developed to allow for the detected stope overbreak to be immediately removed and replaced with backfill material before upper-level stope extraction.It is further shown that the average overbreak volume could be reduced by as much as 33%when the sill pillar is strategically placed in the lower half of a mine plan.展开更多
Maintaining stability as well as optimizing recovery of crown pillar, a pillar separating surface area with the uppermost stope in overhand cut and fill underground mining method, is important. Failures in stope may l...Maintaining stability as well as optimizing recovery of crown pillar, a pillar separating surface area with the uppermost stope in overhand cut and fill underground mining method, is important. Failures in stope may lead to crown pillar failures and cause surface subsidence. Increasing crown pillar thickness will increase crown pillar stability yet reduce mining recovery because part of crown pillar is formed by ore body. Preventing stope failure is the key to maintain stability and optimize recovery of crown pillar. Therefore, it is important to study countermeasure method for stope failure especially in crown pillar area. An attempt has been made to investigate the effectiveness of various countermeasures for stope failure in crown pillar area by means of parametric study. The result shows active type support system is effective for supporting stope in high vertical stress condition while the passive one needs to be installed if the stope is opened in high horizontal stress condition. In general, more supporting capacity from both type support systems is needed if the stope is opened in more severe geological condition. Another countermeasures, sill pillar and surface pile, are introduced for stope instability in crown pillar and non-crown pillar area. Sill pillar is an abandoned slice of unstable stope based on stability analysis. Sill pillar is very effective to stabilize stope both in crown pillar and non-crown pillar area, especially for stope in high horizontal stress condition. Sill pillar application in model with stress ratio 2 can optimize 20 meter thickness of crown pillar into 5 meter. Another proposed countermeasure is surface pile. Surface pile can be installed from the surface to improve stability of crown pillar and stope. The most effective use of surface pile is found in simulation of model with stress ratio 0.75 where surface pile can optimize 15 meter thickness of crown pillar into 5 meter.展开更多
基金financially supported by the Natural Science and Engineering Research Council(NSERC)-Discovery Grants Program。
文摘Steeply dipping,vein and tabular orebodies are traditionally extracted with longitudinal retreat mining methods such as Eureka and Avoca in a bottom-up sequence with delayed backfill.To increase productivity,sill pillars in the orebody are used to separate mining zones thus allowing production to take place simultaneously in two or more zones.While such mining methods are productive,they may be accompanied with high volumes of hanging wall overbreak causing significant unplanned ore dilution.In this work,it is shown through a mine design case study of a narrow vein deposit that a sill pillar could also play a significant role in limiting hanging wall overbreak.To demonstrate the role of sill pillar,a novel numerical modelling scheme is proposed to account for progressive stope wall overbreak.A numerical modelling approach of element death and rebirth is developed to allow for the detected stope overbreak to be immediately removed and replaced with backfill material before upper-level stope extraction.It is further shown that the average overbreak volume could be reduced by as much as 33%when the sill pillar is strategically placed in the lower half of a mine plan.
文摘Maintaining stability as well as optimizing recovery of crown pillar, a pillar separating surface area with the uppermost stope in overhand cut and fill underground mining method, is important. Failures in stope may lead to crown pillar failures and cause surface subsidence. Increasing crown pillar thickness will increase crown pillar stability yet reduce mining recovery because part of crown pillar is formed by ore body. Preventing stope failure is the key to maintain stability and optimize recovery of crown pillar. Therefore, it is important to study countermeasure method for stope failure especially in crown pillar area. An attempt has been made to investigate the effectiveness of various countermeasures for stope failure in crown pillar area by means of parametric study. The result shows active type support system is effective for supporting stope in high vertical stress condition while the passive one needs to be installed if the stope is opened in high horizontal stress condition. In general, more supporting capacity from both type support systems is needed if the stope is opened in more severe geological condition. Another countermeasures, sill pillar and surface pile, are introduced for stope instability in crown pillar and non-crown pillar area. Sill pillar is an abandoned slice of unstable stope based on stability analysis. Sill pillar is very effective to stabilize stope both in crown pillar and non-crown pillar area, especially for stope in high horizontal stress condition. Sill pillar application in model with stress ratio 2 can optimize 20 meter thickness of crown pillar into 5 meter. Another proposed countermeasure is surface pile. Surface pile can be installed from the surface to improve stability of crown pillar and stope. The most effective use of surface pile is found in simulation of model with stress ratio 0.75 where surface pile can optimize 15 meter thickness of crown pillar into 5 meter.