The researchers who study the local area network( LAN) eXtension for instrumentation( LXI) instrument are pursuing instrument's high-precision synchronization. In the paper,three synchronization modes were discuss...The researchers who study the local area network( LAN) eXtension for instrumentation( LXI) instrument are pursuing instrument's high-precision synchronization. In the paper,three synchronization modes were discussed which were clock synchronization, trigger synchronization, and response synchronization. Synchronous process between LXI instruments was analyzed and each time factor affecting the synchronization accuracy was discussed. On the basis of the analysis,it can be found that delay trigger plays an important role in the network testing system's synchronization. Delay trigger can produce an additional time interval to correct the difference of each LXI instrument's response time. Then,a method to realize the delay trigger was introduced. Delay time can be adjustable according to the actual demand. Finally,synchronization accuracy of network testing system can reach nanoseconds.展开更多
The coseismic Coulomb stress change caused by fault interaction and its influences on the triggering and delaying of earthquake are briefly discussed. The Xianshuihe fault belt consists of Luhuo, Daofu, Kangding, Qian...The coseismic Coulomb stress change caused by fault interaction and its influences on the triggering and delaying of earthquake are briefly discussed. The Xianshuihe fault belt consists of Luhuo, Daofu, Kangding, Qianning and Ganzi fault. Luohuo (MS=7.6, 1973)-Kangding (MS=6.2, 1975)-Daofu (MS=6.9, 1981)-Ganzi (MS=6.0, 1982) earthquake is a seismic sequence continuous on the time axis with magnitude greater than 6.0. They occurred on the Luhuo, Kangding, Daofu and Ganzi fault, respectively. The coseismic Coulomb stress changes caused by each earthquake on its surrounding major faults and microcracks are calculated, and their effects on the triggering and delaying of the next earthquake and aftershocks are analyzed. It is shown that each earthquake of the sequence occurred on the fault segment with coseismic Coulomb stress increases caused by its predecessors, and most after-shocks are distributed along the microcracks with relatively larger coseismic Coulomb stress increases resulted from the main shock. With the fault interaction considered, the seismic potential of each segment along Xianshuihe fault belt is reassessed, and contrasted with those predicted results ignoring coseismic Coulomb stress change, the significance of fault interaction and its effect on triggering and delaying of earthquake are emphasized. It is con-cluded that fault interaction plays a very important role on seismic potential of Xianshuihe fault belt, and the maximal change of future earthquake probability on fault segment is up to 30.5%.展开更多
In order to investigate the process of optically triggered discharge formation,a model of ion space-charge formation based on classical plane electrodes and revised for a characteristic hollow-cathode discharge(HCD)co...In order to investigate the process of optically triggered discharge formation,a model of ion space-charge formation based on classical plane electrodes and revised for a characteristic hollow-cathode discharge(HCD)configuration is proposed in this paper.The primary modified factor in our model is the penetrating electric-field parameter,which influences the ionization of trigger electrons and is calculated via particle simulation.Optical-trigger experiments are carried out using different voltages and under different seed-electron conditions,provided by two different photocathodes,Cu and Mg.The ion-accumulation rates calculated by our model are compared to the discharge-formation time,which is deduced from optical-trigger experiments.The results demonstrate that the process of positive space-charge formation is dominant in the HCD formation process or trigger delay,which is highly dependent on the seeding-electron density and applied voltage,and can therefore be quantitatively described by our model.Additionally,electron-beam generation is investigated by optically triggered HCD experiments on Mg-and Cu-photocathode-based devices.The results show that a more efficient trigger device is capable of generating an electron beam with higher amplitude and density.展开更多
Output-pulse shaping capability of a linear transformer driver (LTD) module under different conditions is studied, by conducting the whole circuit model simulation by using the PSPICE code. Results indicate that a h...Output-pulse shaping capability of a linear transformer driver (LTD) module under different conditions is studied, by conducting the whole circuit model simulation by using the PSPICE code. Results indicate that a higher impedance profile of the internal transmission line would lead to a wider adjustment range for the output current rise time and a narrower adjustment range for the current peak. The number of cavities in series has a positive effect on the output- pulse shaping capability of LTD. Such an improvement in the output-pulse shaping capability can primarily be ascribed to the increment in the axial electric length of LTD. For a triggering time interval longer than the time taken by a pulse to propagate through the length of one cavity, the output parameters of LTD could be improved significantly. The present insulating capability of gas switches and other elements in the LTD cavities may only tolerate a slightly longer deviation in the triggering time interval. It is feasible for the LTD module to reduce the output current rise time, though it is not useful to improve the peak power effectively.展开更多
A whole circuit model of a linear transformer drivers (LTD) module composed of 60 cavities in series was developed in the software PSPICE to study the influence of switching jitter on the operational performances of...A whole circuit model of a linear transformer drivers (LTD) module composed of 60 cavities in series was developed in the software PSPICE to study the influence of switching jitter on the operational performances of LTDs. In the model, each brick in each cavity is capable of operating with jitter in its switch. Additionally, the manner of triggering cables entering into cavities was considered. The performances of the LTD module operating with three typical cavity-triggering sequences were simulated and the simulation results indicate that switching jitter affects slightly the peak and starting time of the output current pulse. However, the enhancement in switching jitter would significantly lengthen the rise time of the output current pulse. Without considering other factors, a jitter lower than 10 ns may be necessary for the switches in the LTD module to provide output current parameters with an acceptable deviation.展开更多
基金Sino-German Joint Research Project of the Sino-German Center for Science(No.GZ817)the Fundamental Research Funds for the Central Universities,China(No.ZYGX2012 J090)National Natural Science Foundation of China(No.61271035)
文摘The researchers who study the local area network( LAN) eXtension for instrumentation( LXI) instrument are pursuing instrument's high-precision synchronization. In the paper,three synchronization modes were discussed which were clock synchronization, trigger synchronization, and response synchronization. Synchronous process between LXI instruments was analyzed and each time factor affecting the synchronization accuracy was discussed. On the basis of the analysis,it can be found that delay trigger plays an important role in the network testing system's synchronization. Delay trigger can produce an additional time interval to correct the difference of each LXI instrument's response time. Then,a method to realize the delay trigger was introduced. Delay time can be adjustable according to the actual demand. Finally,synchronization accuracy of network testing system can reach nanoseconds.
基金State Natural Science Foundation of China (No49834002) United foundation of Seismological Science (No100061) and Key Project of China Seismological Bureau (No95041007).
文摘The coseismic Coulomb stress change caused by fault interaction and its influences on the triggering and delaying of earthquake are briefly discussed. The Xianshuihe fault belt consists of Luhuo, Daofu, Kangding, Qianning and Ganzi fault. Luohuo (MS=7.6, 1973)-Kangding (MS=6.2, 1975)-Daofu (MS=6.9, 1981)-Ganzi (MS=6.0, 1982) earthquake is a seismic sequence continuous on the time axis with magnitude greater than 6.0. They occurred on the Luhuo, Kangding, Daofu and Ganzi fault, respectively. The coseismic Coulomb stress changes caused by each earthquake on its surrounding major faults and microcracks are calculated, and their effects on the triggering and delaying of the next earthquake and aftershocks are analyzed. It is shown that each earthquake of the sequence occurred on the fault segment with coseismic Coulomb stress increases caused by its predecessors, and most after-shocks are distributed along the microcracks with relatively larger coseismic Coulomb stress increases resulted from the main shock. With the fault interaction considered, the seismic potential of each segment along Xianshuihe fault belt is reassessed, and contrasted with those predicted results ignoring coseismic Coulomb stress change, the significance of fault interaction and its effect on triggering and delaying of earthquake are emphasized. It is con-cluded that fault interaction plays a very important role on seismic potential of Xianshuihe fault belt, and the maximal change of future earthquake probability on fault segment is up to 30.5%.
文摘In order to investigate the process of optically triggered discharge formation,a model of ion space-charge formation based on classical plane electrodes and revised for a characteristic hollow-cathode discharge(HCD)configuration is proposed in this paper.The primary modified factor in our model is the penetrating electric-field parameter,which influences the ionization of trigger electrons and is calculated via particle simulation.Optical-trigger experiments are carried out using different voltages and under different seed-electron conditions,provided by two different photocathodes,Cu and Mg.The ion-accumulation rates calculated by our model are compared to the discharge-formation time,which is deduced from optical-trigger experiments.The results demonstrate that the process of positive space-charge formation is dominant in the HCD formation process or trigger delay,which is highly dependent on the seeding-electron density and applied voltage,and can therefore be quantitatively described by our model.Additionally,electron-beam generation is investigated by optically triggered HCD experiments on Mg-and Cu-photocathode-based devices.The results show that a more efficient trigger device is capable of generating an electron beam with higher amplitude and density.
基金supported by National Natural Science Foundation of China (Nos. 50637010, 51077111)the State Key Laboratory of Electrical Insulation and Power Equipment of Xi'an Jiaotong University of China (EIPE 09207)
文摘Output-pulse shaping capability of a linear transformer driver (LTD) module under different conditions is studied, by conducting the whole circuit model simulation by using the PSPICE code. Results indicate that a higher impedance profile of the internal transmission line would lead to a wider adjustment range for the output current rise time and a narrower adjustment range for the current peak. The number of cavities in series has a positive effect on the output- pulse shaping capability of LTD. Such an improvement in the output-pulse shaping capability can primarily be ascribed to the increment in the axial electric length of LTD. For a triggering time interval longer than the time taken by a pulse to propagate through the length of one cavity, the output parameters of LTD could be improved significantly. The present insulating capability of gas switches and other elements in the LTD cavities may only tolerate a slightly longer deviation in the triggering time interval. It is feasible for the LTD module to reduce the output current rise time, though it is not useful to improve the peak power effectively.
基金supported partly by National Natural Science Foundation of China(Nos.50637010,51077111)partly by the State Key Laboratory of Electrical Insulation and Power Equipment of Xi'an Jiaotong University of China(EIPE09207)
文摘A whole circuit model of a linear transformer drivers (LTD) module composed of 60 cavities in series was developed in the software PSPICE to study the influence of switching jitter on the operational performances of LTDs. In the model, each brick in each cavity is capable of operating with jitter in its switch. Additionally, the manner of triggering cables entering into cavities was considered. The performances of the LTD module operating with three typical cavity-triggering sequences were simulated and the simulation results indicate that switching jitter affects slightly the peak and starting time of the output current pulse. However, the enhancement in switching jitter would significantly lengthen the rise time of the output current pulse. Without considering other factors, a jitter lower than 10 ns may be necessary for the switches in the LTD module to provide output current parameters with an acceptable deviation.