The test scheme of static postponing time given in our actual national military test standard on shrapnels used to control riot is a nine-point test scheme on the combined action of three kinds of temperatures and thr...The test scheme of static postponing time given in our actual national military test standard on shrapnels used to control riot is a nine-point test scheme on the combined action of three kinds of temperatures and three kinds of pressures, the consumed ammunitions are more excessive. Statistic analysis and tentative checkout about a lot of test data are done, feasibility gists are put forward for optimizing of the test design scheme. The optimizing design and data analysis of test scheme of the item are done by managing uniformity design theory, two scientific and reasonable six-point test schemes are confirmed. The feasibility and reliability of the optimizing design schemes put forward above are proved ulteriorly by test validating. The gained schemes not only have good design uniformity and little ammunition wastage and meet the test demand, but also have better forecast ability for the result data of other points using the mathematic models from the actual test points.展开更多
文摘The test scheme of static postponing time given in our actual national military test standard on shrapnels used to control riot is a nine-point test scheme on the combined action of three kinds of temperatures and three kinds of pressures, the consumed ammunitions are more excessive. Statistic analysis and tentative checkout about a lot of test data are done, feasibility gists are put forward for optimizing of the test design scheme. The optimizing design and data analysis of test scheme of the item are done by managing uniformity design theory, two scientific and reasonable six-point test schemes are confirmed. The feasibility and reliability of the optimizing design schemes put forward above are proved ulteriorly by test validating. The gained schemes not only have good design uniformity and little ammunition wastage and meet the test demand, but also have better forecast ability for the result data of other points using the mathematic models from the actual test points.