In order to settle the problem of workflow data consis-tency under the distributed environment, an invalidation strategy based-on timely updating record list is put forward. The strategy adopting the method of updatin...In order to settle the problem of workflow data consis-tency under the distributed environment, an invalidation strategy based-on timely updating record list is put forward. The strategy adopting the method of updating the records list and the recovery mechanism of updating message proves the classical invalidation strategy. When the request cycle of duplication is too long, the strategy uses the method of updating the records list to pause for sending updating message; when the long cycle duplication is requested again, it uses the recovery mechanism to resume the updating message. This strategy not only ensures the consistency of the workflow data, but also reduces the unnecessary network traffic. From theoretical comparison with those common strategies, the unnecessary network traffic of this strategy is fewer and more stable. The simulation results validate this conclusion.展开更多
To improve the weather forecasting over the Beijing area for the 2008 Olympic Games,a triple-nested(27/9/3km) WRFVar/WRF system with 3-h update cycle was established.Experiments have been done for a convective event t...To improve the weather forecasting over the Beijing area for the 2008 Olympic Games,a triple-nested(27/9/3km) WRFVar/WRF system with 3-h update cycle was established.Experiments have been done for a convective event that occurred on August 1,2006.The results showed that the high-resolution rapid update cycle gave a good precipitation forecast;the tunings of background error statistics(BES) and observation-error statistics in WRFVar improved the skill of the precipitation forecast;the BES for the fine domain(3 km) obtained by interpolation from its parent domain(9 km) can be used in 3 km WRFVar as a reasonable approximation.The user can now save a great deal of work related to the derivation of the fine mesh BES from the forecast over a period of time;the rapid update cycle with 3-h frequency has satisfied the forecast,and the update cycle with 1-h frequency was not necessary.展开更多
To support short-range weather forecasts,a high-resolution model(1km)is developed and technically upgraded in the South China Regional Center,including the improvement of the 3D reference scheme and the predictor-corr...To support short-range weather forecasts,a high-resolution model(1km)is developed and technically upgraded in the South China Regional Center,including the improvement of the 3D reference scheme and the predictor-corrector method for semi-implicit semi-Lagrangian(SISL)in model dynamical core,as well as the improvement of physical parameterization.Furthermore,the multi-process parallel I/O and parallel nudging techniques are developed and have facilitated rapid updating in the assimilation prediction system and fast-output post processing process.The experimental results show that the improved 3D reference scheme and upgraded physic schemes can effectively improve the prediction accuracy and stability with a longer integration time step.The batch test shows that the precipitation forecast performance of 1-km model is significantly better than that of 3-km model.The 1-km model is in operation with a rapidly updating cycle at 12-minute intervals,which can be applied to short-range forecasts and nowcasting.展开更多
基金National Basic Research Program of China (973 Program) (2005CD312904)
文摘In order to settle the problem of workflow data consis-tency under the distributed environment, an invalidation strategy based-on timely updating record list is put forward. The strategy adopting the method of updating the records list and the recovery mechanism of updating message proves the classical invalidation strategy. When the request cycle of duplication is too long, the strategy uses the method of updating the records list to pause for sending updating message; when the long cycle duplication is requested again, it uses the recovery mechanism to resume the updating message. This strategy not only ensures the consistency of the workflow data, but also reduces the unnecessary network traffic. From theoretical comparison with those common strategies, the unnecessary network traffic of this strategy is fewer and more stable. The simulation results validate this conclusion.
文摘To improve the weather forecasting over the Beijing area for the 2008 Olympic Games,a triple-nested(27/9/3km) WRFVar/WRF system with 3-h update cycle was established.Experiments have been done for a convective event that occurred on August 1,2006.The results showed that the high-resolution rapid update cycle gave a good precipitation forecast;the tunings of background error statistics(BES) and observation-error statistics in WRFVar improved the skill of the precipitation forecast;the BES for the fine domain(3 km) obtained by interpolation from its parent domain(9 km) can be used in 3 km WRFVar as a reasonable approximation.The user can now save a great deal of work related to the derivation of the fine mesh BES from the forecast over a period of time;the rapid update cycle with 3-h frequency has satisfied the forecast,and the update cycle with 1-h frequency was not necessary.
基金National Key R&D Program of China(2018YFC1506901)National Natural Science Foundation of China(U18114641010846)。
文摘To support short-range weather forecasts,a high-resolution model(1km)is developed and technically upgraded in the South China Regional Center,including the improvement of the 3D reference scheme and the predictor-corrector method for semi-implicit semi-Lagrangian(SISL)in model dynamical core,as well as the improvement of physical parameterization.Furthermore,the multi-process parallel I/O and parallel nudging techniques are developed and have facilitated rapid updating in the assimilation prediction system and fast-output post processing process.The experimental results show that the improved 3D reference scheme and upgraded physic schemes can effectively improve the prediction accuracy and stability with a longer integration time step.The batch test shows that the precipitation forecast performance of 1-km model is significantly better than that of 3-km model.The 1-km model is in operation with a rapidly updating cycle at 12-minute intervals,which can be applied to short-range forecasts and nowcasting.