The rapidly developing global competition is leadin g to the worldwide enterprise alliance, with which the geographical dispersion of production, assembly and distribution operations comes into being. Supply chain sys...The rapidly developing global competition is leadin g to the worldwide enterprise alliance, with which the geographical dispersion of production, assembly and distribution operations comes into being. Supply chain system is such a kind of enterprise alliance, managing the material and informat ion flows both in and between enterprises, such as vendors, manufacturing and assembly plants and distribution centers. In the present research work, we can see that supply chain system can quickly respond to customer needs and adapt to the dynamic change of the market so as to improve the competence of enterprises in the chain. Thus, in supply chain system, it’s most important to enhance the speed with which the products are produced and distributed to the customers who order them and reduce the operating costs at the same time. However, because of the special characteristics, such as dynamic and distributed , etc., often in Agile Supply Chain System (ASCS), there are many dynamic tasks, and many urgent changes of the processes, which make the planning work and mana gement become very difficult and complex. Thus, in Agile Supply Chain System, we first need an efficient planning work, which can program the processes properly to get a primary scheme. And then the local scheduling work based on the primar y scheme will play a important role to deal with the dynamic and distributed pro blems in the business process in ASCS. So, this paper will be organized as below . At the first of this paper, we will discuss the situation in which Agile Suppl y Chain System is applied, and then we will elaborate the characteristics of Agi le Supply Chain System. With that, the shortcomings of the process managements t hat are, at present, used in Supply Chain Systems will be displayed clearly. Sec ond, we will introduce the planning methods in our research work. And then, the local scheduling will be discussed in detail, based on the primarily planned wor kflow. To realize the goal, first we build the mathematic model to describe the scheduling goal of system optimum, based on the categories of the cooperating-r elation among the operation nodes, which we defined in our research work, in Agi le Supply Chain System. And then the optimized algorithm to solve the model woul d be introduced, in succession. At the final of this paper, we will introduce some knowledge of the process mana gement and the realization of ASCS and summarize our work.展开更多
针对汽车电子生产车间作业排产面临的在制品(Work In Process,WIP)堆积、生产周期长和订单准时交付率低等问题,梳理汽车电子零/部件生产车间排程逻辑,依托于约束理论(Theory Of Constraint,TOC)和“鼓-缓冲-绳子”(Drum-Buffer-Rope,DBR...针对汽车电子生产车间作业排产面临的在制品(Work In Process,WIP)堆积、生产周期长和订单准时交付率低等问题,梳理汽车电子零/部件生产车间排程逻辑,依托于约束理论(Theory Of Constraint,TOC)和“鼓-缓冲-绳子”(Drum-Buffer-Rope,DBR)方法,识别瓶颈工序,以完工期限最早优先(Earliest Due Date,EDD)和提高产出率为原则,引入交付紧迫系数,建立了瓶颈工序影响下的订单优先排产计划模型。以某汽车电子零/部件企业的印刷线路板(PCBA)生产车间实际生产数据为例,结合订单优先排产计划模型对PCBA订单进行作业时间排程,验证了该模型的有效性,为汽车电子生产车间排程提供了一种新的可行方案。展开更多
Under the new situation of reform and opening up. new theory and practices ofurban planning are in urgent demand The contents and work focus in this regard shouldalso be changed respectively.Urban planning should pay ...Under the new situation of reform and opening up. new theory and practices ofurban planning are in urgent demand The contents and work focus in this regard shouldalso be changed respectively.Urban planning should pay more attention to economic de-velopment and cultivation of service awareness. Its administration should also be suited tothe characteristics of market展开更多
文摘The rapidly developing global competition is leadin g to the worldwide enterprise alliance, with which the geographical dispersion of production, assembly and distribution operations comes into being. Supply chain system is such a kind of enterprise alliance, managing the material and informat ion flows both in and between enterprises, such as vendors, manufacturing and assembly plants and distribution centers. In the present research work, we can see that supply chain system can quickly respond to customer needs and adapt to the dynamic change of the market so as to improve the competence of enterprises in the chain. Thus, in supply chain system, it’s most important to enhance the speed with which the products are produced and distributed to the customers who order them and reduce the operating costs at the same time. However, because of the special characteristics, such as dynamic and distributed , etc., often in Agile Supply Chain System (ASCS), there are many dynamic tasks, and many urgent changes of the processes, which make the planning work and mana gement become very difficult and complex. Thus, in Agile Supply Chain System, we first need an efficient planning work, which can program the processes properly to get a primary scheme. And then the local scheduling work based on the primar y scheme will play a important role to deal with the dynamic and distributed pro blems in the business process in ASCS. So, this paper will be organized as below . At the first of this paper, we will discuss the situation in which Agile Suppl y Chain System is applied, and then we will elaborate the characteristics of Agi le Supply Chain System. With that, the shortcomings of the process managements t hat are, at present, used in Supply Chain Systems will be displayed clearly. Sec ond, we will introduce the planning methods in our research work. And then, the local scheduling will be discussed in detail, based on the primarily planned wor kflow. To realize the goal, first we build the mathematic model to describe the scheduling goal of system optimum, based on the categories of the cooperating-r elation among the operation nodes, which we defined in our research work, in Agi le Supply Chain System. And then the optimized algorithm to solve the model woul d be introduced, in succession. At the final of this paper, we will introduce some knowledge of the process mana gement and the realization of ASCS and summarize our work.
文摘针对汽车电子生产车间作业排产面临的在制品(Work In Process,WIP)堆积、生产周期长和订单准时交付率低等问题,梳理汽车电子零/部件生产车间排程逻辑,依托于约束理论(Theory Of Constraint,TOC)和“鼓-缓冲-绳子”(Drum-Buffer-Rope,DBR)方法,识别瓶颈工序,以完工期限最早优先(Earliest Due Date,EDD)和提高产出率为原则,引入交付紧迫系数,建立了瓶颈工序影响下的订单优先排产计划模型。以某汽车电子零/部件企业的印刷线路板(PCBA)生产车间实际生产数据为例,结合订单优先排产计划模型对PCBA订单进行作业时间排程,验证了该模型的有效性,为汽车电子生产车间排程提供了一种新的可行方案。
文摘Under the new situation of reform and opening up. new theory and practices ofurban planning are in urgent demand The contents and work focus in this regard shouldalso be changed respectively.Urban planning should pay more attention to economic de-velopment and cultivation of service awareness. Its administration should also be suited tothe characteristics of market