Li-rich Mn-based oxides(LRMOs)hold great promise as next-generation cathode materials for high-energy Li-ion batteries because of their low cost and high capacity.Nevertheless,the practical application of LRMOs is imp...Li-rich Mn-based oxides(LRMOs)hold great promise as next-generation cathode materials for high-energy Li-ion batteries because of their low cost and high capacity.Nevertheless,the practical application of LRMOs is impeded by their low initial Coulombic efficiency and rapid voltage decay.Herein,a V-doped layered-spinel coherent layer is constructed on the surface of a Co-free LRMO through a simple treatment with NH_(4)VO_(3).The layered-spinel coherent layer with 3D ion channels enhanced Li+diffusion efficiency,mitigates surface-inter-face reactions and suppresses irreversible oxygen release.Notably,V-doping significantly reduces the Bader charge of oxygen atoms,thereby impeding excessive oxidation of oxygen ions and further enhancing the stability of O-redox.The modified LRMO exhibites a remarkable initial Coulombic efficiency of 91.6%,signifi-cantly surpassing that of the original LRMO(74.4%).Furthermore,the treated sample showes an impressive capacity retention rate of 91.9%after 200 cycles,accompanied by a voltage decay of merely 0.47 mV per cycle.The proposed treatment approach is straightforward and significantly improves the initial Coulombic efficiency,voltage stability,and capacity stability of LRMO cathode materials,thus holding considerable promise for the development of high-energy Li-ion batteries.展开更多
The reactive power optimization considering voltage stability is an effective method to improve voltage stablity margin and decrease network losses,but it is a complex combinatorial optimization problem involving nonl...The reactive power optimization considering voltage stability is an effective method to improve voltage stablity margin and decrease network losses,but it is a complex combinatorial optimization problem involving nonlinear functions having multiple local minima and nonlinear and discontinuous constraints. To deal with the problem,quantum particle swarm optimization (QPSO) is firstly introduced in this paper,and according to QPSO,chaotic quantum particle swarm optimization (CQPSO) is presented,which makes use of the randomness,regularity and ergodicity of chaotic variables to improve the quantum particle swarm optimization algorithm. When the swarm is trapped in local minima,a smaller searching space chaos optimization is used to guide the swarm jumping out the local minima. So it can avoid the premature phenomenon and to trap in a local minima of QPSO. The feasibility and efficiency of the proposed algorithm are verified by the results of calculation and simulation for IEEE 14-buses and IEEE 30-buses systems.展开更多
In this paper, digital simulation techniques for dynamic and transient voltage performance studies, using accurate load and synchronous generator models have been proposed. Particular attention has been paid to the in...In this paper, digital simulation techniques for dynamic and transient voltage performance studies, using accurate load and synchronous generator models have been proposed. Particular attention has been paid to the induction motor load model. Accurate models of voltage supporting devices including OLTC transformer are derived. The system of differential equations based on the above models are converted into linear algebraic equations by use of the trapezoidal approximation formula. These are then written as difference equations to facilitate computational programming. For various contingencies a numerical iterative technique is used to obtain a simulation of the system voltage and angle profile. Various contingency tests on a 9-bus sample system and a 22-bus system prove the applicability of the package.展开更多
With the increasing development of wind power,the scale of wind farms and unit capacity of wind turbines are getting larger and larger,and the impact of wind integration on power systems cannot be ignored.However,in m...With the increasing development of wind power,the scale of wind farms and unit capacity of wind turbines are getting larger and larger,and the impact of wind integration on power systems cannot be ignored.However,in most cases,the areas with a plenty of wind resources do not have strong grid structures.Furthermore,the characteristics of wind power dictate that wind turbines need to absorb reactive power during operation.Because of the strong correlation between voltage stability and systems' reactive power,the impacts of wind integration on voltage stability has become an important issue.Based on the power system simulation software DIgSILENT and combined analysis of actual practice,this paper investigates the impacts of two types of wind farms on voltage stability:namely a type of wind farms which are constituted by constant speed wind turbines based on common induction generators(IG) and another type of wind farms which are constituted by VSCF wind turbines based on doubly-fed induction generators(DFIG).Through investigation the critical fault clearing time is presented for different outputs of wind farms.Moreover,the impacts of static var compensator(SVC) and static synchronous compensator(STATCOM) on transient voltage stability in IG-based wind farms are studied to improve the security and stability of the Jiangsu power grid after the integration of large scale wind power.展开更多
This paper studies on the change mechanisms of the voltage stability caused by the grid connection of front-end speed-controlled wind turbines(FSCWT)integrating into power system.First of all,the differential algebrai...This paper studies on the change mechanisms of the voltage stability caused by the grid connection of front-end speed-controlled wind turbines(FSCWT)integrating into power system.First of all,the differential algebraic equations describing the dynamic characteristics of wind turbines are illustrated.Then,under the guidance of IEEE3 node system model,the influence of the angular velocity of wind turbines,the reactive power and the active power at load bus on the voltage stability of grid-connection has been analyzed by using bifurcation theory.Finally,the method of linear-state feedback control has been applied to the original system in accordance with the bifurcation phenomenon of grid-connected voltage caused by the increase in the active power at load bus.Research shows that voltage at the grid-connected point would be changed with the fluctuation of turbines angular velocity.And increasing its reactive power can enhance voltage at the grid-connected point;problem of bifurcation at the grid-connected point can be delayed when increasing the gain k s of feedback controller within a certain range.展开更多
This paper presents a newly developed proximity indicator for voltage stability assessment which can be used to predict critical real system load and voltages at various load buses at critical loading point.The proxim...This paper presents a newly developed proximity indicator for voltage stability assessment which can be used to predict critical real system load and voltages at various load buses at critical loading point.The proximity indicator varies almost parabolic with total real load demand and reaches orthogonally to real load axis.This relation has been utilized to predict critical loading point.It has been shown that two operating points are needed for estimating critical point and proper selection of operating points and variation of proximity indicator near collapse point highly affect the accuracy of estimation.Simulation is based on load flow equations and system real and reactive loadings have been increased in proportion with base case scenario for IEEE 14 and IEEE 25 bus test systems to demonstrate the behaviour of proposed proximity indicator.CPF has been used as benchmark to check the accuracy of estimation.展开更多
The static voltage stability of the power system integrating wind farms adopting different kinds of wind turbines is analyzed. Through the simulation of one certain local power grid in Xinjiang Uygur Autonomous Region...The static voltage stability of the power system integrating wind farms adopting different kinds of wind turbines is analyzed. Through the simulation of one certain local power grid in Xinjiang Uygur Autonomous Region, the PV curves at the point of common coupling (PCC), key buses and important substations are plotted; the variation of voltage as well as the limit and margin of static stability are analyzed. It is resulted from the simulation that the limit of static voltage at weak nodes is lower, and the static voltage of the power system with wind farms adopting doubly-fed induction generators (DFIG) is more stable than that with wind farms adopting common asynchronous generators.展开更多
Power system operations can be optimized using power electronics based FACTS devices. The location of these devices at appropriate transmission line plays a major role in their performance. In this paper, two bio-insp...Power system operations can be optimized using power electronics based FACTS devices. The location of these devices at appropriate transmission line plays a major role in their performance. In this paper, two bio-inspired algorithms are used to optimally locate two FACTS devices: UPFC and STATCOM, so as to reduce the voltage collapse and real power losses. Particle swarm optimization and BAT algorithms are chosen as their behaviour is similar. VCPI index is used as a metric to calculate the voltage collapse scenario of the power system. The algorithm is tested on two benchmark power systems: IEEE 118 and the Indian UPSEB 75 bus system. Performance metrics are compared with the system without FACTS devices. Application of PSO and BAT algorithms to optimally locate the FACTS devices reduces the VCPI index and real power losses in the system.展开更多
The growth of wind energy penetration level in distribution system raises the concern about its impact on the operation of the power system, especially voltage stability and power loss. Among the major concerns, this ...The growth of wind energy penetration level in distribution system raises the concern about its impact on the operation of the power system, especially voltage stability and power loss. Among the major concerns, this paper studied the impact of connecting wind Turbine (WT) in radial distribution system with different penetration levels and different power factor (lead and lag) on power system voltage stability and power loss reduction. Load flow calculation was carried out using forward-backward sweep method. The analysis proceeds on 9- and 33-bus radial distribution systems. Results show that voltage stability enhancement and power loss reduction should be considered as WT installation objective.展开更多
Chloride solid electrolytes possess multiple advantages for the construction of safe,energy-dense allsolid-state sodium batteries,but presently the chlorides with sufficiently high cost-competitiveness for commerciali...Chloride solid electrolytes possess multiple advantages for the construction of safe,energy-dense allsolid-state sodium batteries,but presently the chlorides with sufficiently high cost-competitiveness for commercialization almost all exhibit low Na-ion conductivities of around 10^(-5)S cm^(-1)or lower.Here,we report a chloride solid electrolyte,Na_(2.7)ZFCl_(5.3)O_(0.7),which reaches a Na-ion conductivity of 2.29×10^(-4)S cm^(-1)at 25℃without involving overly expensive raw materials such as rare-earth chlorides or Na_(2)S.In addition to the efficient ion transport,Na_(2.7)ZrCl_(5.3)O_(0.7)also shows an excellent deformability surpassing that of the widely studied Na_(3)PS_(4),Na_(3)SbS_(4),and Na_(2)ZrCl_(6)solid electrolytes.The combination of these advantages allows the all-solid-state cell based on Na_(2.7)ZrCl_(5.3)O_(0.7)and NaCrO_(2)to realize stable room-temperature cycling at a much higher specific current than those based on other non-viscoelastic chloride solid electrolytes in literature(120 mA g^(-1)vs.12-55 mA g^(-1));after 100 cycles at such a high rate,the Na_(2.7)ZFCl_(5.3)O_(0.7)-based cell can still deliver a discharge capacity of 80 mAh g^(-1)at25℃.展开更多
Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in t...Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in the stability of DN operation.It is urgent to find a method that can effectively connect multi-energy DG to DN.photovoltaic(PV),wind power generation(WPG),fuel cell(FC),and micro gas turbine(MGT)are considered in this paper.A multi-objective optimization model was established based on the life cycle cost(LCC)of DG,voltage quality,voltage fluctuation,system network loss,power deviation of the tie-line,DG pollution emission index,and meteorological index weight of DN.Multi-objective artificial bee colony algorithm(MOABC)was used to determine the optimal location and capacity of the four kinds of DG access DN,and compared with the other three heuristic algorithms.Simulation tests based on IEEE 33 test node and IEEE 69 test node show that in IEEE 33 test node,the total voltage deviation,voltage fluctuation,and system network loss of DN decreased by 49.67%,7.47%and 48.12%,respectively,compared with that without DG configuration.In the IEEE 69 test node,the total voltage deviation,voltage fluctuation and system network loss of DN in the MOABC configuration scheme decreased by 54.98%,35.93%and 75.17%,respectively,compared with that without DG configuration,indicating that MOABC can reasonably plan the capacity and location of DG.Achieve the maximum trade-off between DG economy and DN operation stability.展开更多
As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wi...As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.展开更多
The output current harmonic distortion of a three-level inverter is less than the traditional twolevel inverter.The voltage stress of the semiconductor switch is low.A neutral point potential drift control method is p...The output current harmonic distortion of a three-level inverter is less than the traditional twolevel inverter.The voltage stress of the semiconductor switch is low.A neutral point potential drift control method is proposed to solve the problem of the neutral point potential drift of the three-level inverter.The interaction mechanism between the neutral point potential and the space voltage vector is presented.The small vector output by the inverter is found to be the root cause of the midpoint potential drift.It is found that the fluctuation of the midpoint potential could be suppressed by increasing the capacitance value of the inverter bus voltage stabilizing capacitor.Furthermore,it inhibits the fluctuation of the midpoint potential.The experimental results verify the efficiency and precision of the proposed method.展开更多
How to comprehensively consider the power flow constraints and various stability constraints in a series of power system optimization problems without affecting the calculation speed is always a problem.The computatio...How to comprehensively consider the power flow constraints and various stability constraints in a series of power system optimization problems without affecting the calculation speed is always a problem.The computational burden of probabilistic security assessment is even more unimaginable.In order to solve such problems,a security region(SR)methodology is proposed,which is a brand-new methodology developed on the basis of the classical point-wise method.Tianjin University has been studying the SR methodology since the 1980s,and has achieved a series of original breakthroughs that are described in this paper.The integrated SR introduced in this paper is mainly defined in the power injection space,and includes SRs to ensure steady-state security,transient stability,static voltage stability,and smalldisturbance stability.These SRs are uniquely determined for a given network topology(as well as location and clearing process for transient faults)and given system component parameters,and are irrelevant to operation states.This paper presents 11 facts and related remarks to introduce the basic concepts,composition,dynamics nature,and topological and geometric characteristics of SRs.It also provides a practical mathematical description of SR boundaries and fast calculation methods to determine them in a concise and systematic way.Thus,this article provides support for the systematic understanding,future research,and applications of SRs.The most critical finding on the topological and geometric characteristics of SRs is that,within the scope of engineering concern,the practical boundaries of SRs in the power injection space can be approximated by one or a few hyperplanes.Based on this finding,the calculation time for power system probabilistic security assessment(i.e.,risk analysis)and power system optimization with security constraints can be decreased by orders of magnitude.展开更多
A comparison of the effectiveness of installing reactive power compensators,such as shunt capacitors,static var compensators(SVCs),and static synchronous compensators(STATCOMs),was presented in large-scale power netwo...A comparison of the effectiveness of installing reactive power compensators,such as shunt capacitors,static var compensators(SVCs),and static synchronous compensators(STATCOMs),was presented in large-scale power networks.A suitable bus was first identified using modal analysis method.The single shunt capacitor,single SVC,and single STATCOM were installed separately on the most critical bus.The effects of the installation of different devices on power loss reduction,voltage profile improvement,and voltage stability margin enhancement were examined and compared for 57-and 118-bus transmission systems.The comparative study results show that SVC,and STATCOM are expensive compared to shunt capacitor,yet the effect of installing STATCOM is better than SVC and the effect of installing SVC is better than that of shunt capacitor in achieving power loss reduction,voltage profile improvement and voltage stability margin enhancement.展开更多
This paper presents a machine-learning-based speedup strategy for real-time implementation of model-predictive-control(MPC)in emergency voltage stabilization of power systems.Despite success in various applications,re...This paper presents a machine-learning-based speedup strategy for real-time implementation of model-predictive-control(MPC)in emergency voltage stabilization of power systems.Despite success in various applications,real-time implementation of MPC in power systems has not been successful due to the online control computation time required for large-sized complex systems,and in power systems,the computation time exceeds the available decision time used in practice by a large extent.This long-standing problem is addressed here by developing a novel MPC-based framework that i)computes an optimal strategy for nominal loads in an offline setting and adapts it for real-time scenarios by successive online control corrections at each control instant utilizing the latest measurements,and ii)employs a machine-learning based approach for the prediction of voltage trajectory and its sensitivity to control inputs,thereby accelerating the overall control computation by multiple times.Additionally,a realistic control coordination scheme among static var compensators(SVC),load-shedding(LS),and load tap-changers(LTC)is presented that incorporates the practical delayed actions of the LTCs.The performance of the proposed scheme is validated for IEEE 9-bus and 39-bus systems,with±20%variations in nominal loading conditions together with contingencies.We show that our proposed methodology speeds up the online computation by 20-fold,bringing it down to a practically feasible value(fraction of a second),making the MPC real-time and feasible for power system control for the first time.展开更多
This article investigates the power quality enhancement in power system using one of the most famous series converter based FACTS controller like IPFC (Interline Power Flow Controller) in Power Injection Model (PIM). ...This article investigates the power quality enhancement in power system using one of the most famous series converter based FACTS controller like IPFC (Interline Power Flow Controller) in Power Injection Model (PIM). The parameters of PIM are derived with help of the Newton-Raphson power flow algorithm. In general, a sample test power system without FACTs devices has generated more reactive power, decreased real power, more harmonics, small power factor and poor dynamic performance under line and load variations. In order to improve the real power, compensating the reactive power, proficient power factor and excellent load voltage regulation in the sample test power system, an IPFC is designed. The D-Q technique is utilized here to derive the reference current of the converter and its D.C link capacitor voltage is regulated. Also, the reference voltage of the inverter is arrived by park transformation technique and its load voltage is controlled. Here, a sample 230 KV test power system is taken for study. Further as the conventional PI controllers are designed at one nominal operating point they are not competent to respond satisfactorily in dynamic operating conditions. This can be circumvented by a Fuzzy and Neural network based IPFC and its detailed Simulink model is developed using MATLAB and the overall performance analysis is carried out under different operating state of affairs.展开更多
This paper presents a new optimization study of the placement and size of a photovoltaic source(PVS)in a distribution grid,based on annual records of meteorological parameters(irradiance,temperature).Based on the reco...This paper presents a new optimization study of the placement and size of a photovoltaic source(PVS)in a distribution grid,based on annual records of meteorological parameters(irradiance,temperature).Based on the recorded data,the production output as well as the daily average power(24-h vector)of the PVS is extracted over the year.When a power vector is available,it can be used as an input when searching for the optimal size of the PVS.This allows to take into account the constraint of the variation of the power generated by this source considering the variation of the power consumed by the electrical loads during the whole day.A multi-objective fitness function has been considered.The latter minimizes the active losses and maximizes the voltage stability index during the day,while considering the constraints of the system,that is,the security,technical,geographical,and meteorological constraints.This problem was solved using the Non-dominated Sorting Genetic Algorithm NSGA-II optimization technique under MATLAB 2021.It was applied to the distribution network of Ghardaïa of 59 nodes.展开更多
The lack of reactive power in offshore wind farms will affect the voltage stability and power transmission quality of wind farms.To improve the voltage stability and reactive power economy of wind farms,the improved p...The lack of reactive power in offshore wind farms will affect the voltage stability and power transmission quality of wind farms.To improve the voltage stability and reactive power economy of wind farms,the improved particle swarmoptimization is used to optimize the reactive power planning in wind farms.First,the power flow of offshore wind farms is modeled,analyzed and calculated.To improve the global search ability and local optimization ability of particle swarm optimization,the improved particle swarm optimization adopts the adaptive inertia weight and asynchronous learning factor.Taking the minimum active power loss of the offshore wind farms as the objective function,the installation location of the reactive power compensation device is compared according to the node voltage amplitude and the actual engineering needs.Finally,a reactive power optimizationmodel based on Static Var Compensator is established inMATLAB to consider the optimal compensation capacity,network loss,convergence speed and voltage amplitude enhancement effect of SVC.Comparing the compensation methods in several different locations,the compensation scheme with the best reactive power optimization effect is determined.Meanwhile,the optimization results of the standard particle swarm optimization and the improved particle swarm optimization are compared to verify the superiority of the proposed improved algorithm.展开更多
Load flow studies play a critical role in the analysis of power systems. They enable the computation of voltage, current, and power flows in a power system. They provide valuable insights into the steady-state perform...Load flow studies play a critical role in the analysis of power systems. They enable the computation of voltage, current, and power flows in a power system. They provide valuable insights into the steady-state performance of the power system under different operating conditions. Choosing a slack bus is a vital step in conducting load flow simulations. A slack bus is a PV bus that includes a generator and is used to balance real and reactive power during load flow studies. Many studies have been conducted on the selection of slack buses in load flow analysis. However, varied conclusions regarding the impact on system losses and power flows were obtained during these studies. Therefore, using the IEEE-14 bus test system, this study investigated the effects of slack bus selection in strong and weak grids by alternating slack buses among PV buses and observing the effects on bus voltage magnitude, bus voltage phase angle, total power flows, and active and reactive power losses. The study noted that the effect of slack bus selection on these system quantities is contingent upon the voltage stability of the grid. Whereas in a robust grid, system losses and power flows remained constant irrespective of the choice of slack bus, a weak grid experienced some variations in these system quantities under similar circumstances. The simulation results led to the conclusion that, to a large extent, the voltage stability of the grid plays a significant role in determining the degree to which slack bus selection affects system losses and other quantities in load flow studies.展开更多
基金Natural Science Research(Department of Education)Project of Higher Education Institutions in Guangdong Province(Grant No.2018KQNCX063)Applied Basic Research Fund of Guangdong Province(Grant No.2024B1515020071)+1 种基金National Natural Science Foundation of China(Grant Nos.52371217 and 52150410411)Guangdong Provincial Science and Technology Plan Project(Grant No.2023A0505020009)。
文摘Li-rich Mn-based oxides(LRMOs)hold great promise as next-generation cathode materials for high-energy Li-ion batteries because of their low cost and high capacity.Nevertheless,the practical application of LRMOs is impeded by their low initial Coulombic efficiency and rapid voltage decay.Herein,a V-doped layered-spinel coherent layer is constructed on the surface of a Co-free LRMO through a simple treatment with NH_(4)VO_(3).The layered-spinel coherent layer with 3D ion channels enhanced Li+diffusion efficiency,mitigates surface-inter-face reactions and suppresses irreversible oxygen release.Notably,V-doping significantly reduces the Bader charge of oxygen atoms,thereby impeding excessive oxidation of oxygen ions and further enhancing the stability of O-redox.The modified LRMO exhibites a remarkable initial Coulombic efficiency of 91.6%,signifi-cantly surpassing that of the original LRMO(74.4%).Furthermore,the treated sample showes an impressive capacity retention rate of 91.9%after 200 cycles,accompanied by a voltage decay of merely 0.47 mV per cycle.The proposed treatment approach is straightforward and significantly improves the initial Coulombic efficiency,voltage stability,and capacity stability of LRMO cathode materials,thus holding considerable promise for the development of high-energy Li-ion batteries.
基金Sponsored by the Scientific and Technological Project of Heilongjiang Province(Grant No.GD07A304)
文摘The reactive power optimization considering voltage stability is an effective method to improve voltage stablity margin and decrease network losses,but it is a complex combinatorial optimization problem involving nonlinear functions having multiple local minima and nonlinear and discontinuous constraints. To deal with the problem,quantum particle swarm optimization (QPSO) is firstly introduced in this paper,and according to QPSO,chaotic quantum particle swarm optimization (CQPSO) is presented,which makes use of the randomness,regularity and ergodicity of chaotic variables to improve the quantum particle swarm optimization algorithm. When the swarm is trapped in local minima,a smaller searching space chaos optimization is used to guide the swarm jumping out the local minima. So it can avoid the premature phenomenon and to trap in a local minima of QPSO. The feasibility and efficiency of the proposed algorithm are verified by the results of calculation and simulation for IEEE 14-buses and IEEE 30-buses systems.
文摘In this paper, digital simulation techniques for dynamic and transient voltage performance studies, using accurate load and synchronous generator models have been proposed. Particular attention has been paid to the induction motor load model. Accurate models of voltage supporting devices including OLTC transformer are derived. The system of differential equations based on the above models are converted into linear algebraic equations by use of the trapezoidal approximation formula. These are then written as difference equations to facilitate computational programming. For various contingencies a numerical iterative technique is used to obtain a simulation of the system voltage and angle profile. Various contingency tests on a 9-bus sample system and a 22-bus system prove the applicability of the package.
文摘With the increasing development of wind power,the scale of wind farms and unit capacity of wind turbines are getting larger and larger,and the impact of wind integration on power systems cannot be ignored.However,in most cases,the areas with a plenty of wind resources do not have strong grid structures.Furthermore,the characteristics of wind power dictate that wind turbines need to absorb reactive power during operation.Because of the strong correlation between voltage stability and systems' reactive power,the impacts of wind integration on voltage stability has become an important issue.Based on the power system simulation software DIgSILENT and combined analysis of actual practice,this paper investigates the impacts of two types of wind farms on voltage stability:namely a type of wind farms which are constituted by constant speed wind turbines based on common induction generators(IG) and another type of wind farms which are constituted by VSCF wind turbines based on doubly-fed induction generators(DFIG).Through investigation the critical fault clearing time is presented for different outputs of wind farms.Moreover,the impacts of static var compensator(SVC) and static synchronous compensator(STATCOM) on transient voltage stability in IG-based wind farms are studied to improve the security and stability of the Jiangsu power grid after the integration of large scale wind power.
基金National Natural Science Foundation of China(No.61663019)
文摘This paper studies on the change mechanisms of the voltage stability caused by the grid connection of front-end speed-controlled wind turbines(FSCWT)integrating into power system.First of all,the differential algebraic equations describing the dynamic characteristics of wind turbines are illustrated.Then,under the guidance of IEEE3 node system model,the influence of the angular velocity of wind turbines,the reactive power and the active power at load bus on the voltage stability of grid-connection has been analyzed by using bifurcation theory.Finally,the method of linear-state feedback control has been applied to the original system in accordance with the bifurcation phenomenon of grid-connected voltage caused by the increase in the active power at load bus.Research shows that voltage at the grid-connected point would be changed with the fluctuation of turbines angular velocity.And increasing its reactive power can enhance voltage at the grid-connected point;problem of bifurcation at the grid-connected point can be delayed when increasing the gain k s of feedback controller within a certain range.
文摘This paper presents a newly developed proximity indicator for voltage stability assessment which can be used to predict critical real system load and voltages at various load buses at critical loading point.The proximity indicator varies almost parabolic with total real load demand and reaches orthogonally to real load axis.This relation has been utilized to predict critical loading point.It has been shown that two operating points are needed for estimating critical point and proper selection of operating points and variation of proximity indicator near collapse point highly affect the accuracy of estimation.Simulation is based on load flow equations and system real and reactive loadings have been increased in proportion with base case scenario for IEEE 14 and IEEE 25 bus test systems to demonstrate the behaviour of proposed proximity indicator.CPF has been used as benchmark to check the accuracy of estimation.
基金National Natural Science Foundation of China(5076700350867004)Autonomous university research projects(XJEDU2007105)
文摘The static voltage stability of the power system integrating wind farms adopting different kinds of wind turbines is analyzed. Through the simulation of one certain local power grid in Xinjiang Uygur Autonomous Region, the PV curves at the point of common coupling (PCC), key buses and important substations are plotted; the variation of voltage as well as the limit and margin of static stability are analyzed. It is resulted from the simulation that the limit of static voltage at weak nodes is lower, and the static voltage of the power system with wind farms adopting doubly-fed induction generators (DFIG) is more stable than that with wind farms adopting common asynchronous generators.
文摘Power system operations can be optimized using power electronics based FACTS devices. The location of these devices at appropriate transmission line plays a major role in their performance. In this paper, two bio-inspired algorithms are used to optimally locate two FACTS devices: UPFC and STATCOM, so as to reduce the voltage collapse and real power losses. Particle swarm optimization and BAT algorithms are chosen as their behaviour is similar. VCPI index is used as a metric to calculate the voltage collapse scenario of the power system. The algorithm is tested on two benchmark power systems: IEEE 118 and the Indian UPSEB 75 bus system. Performance metrics are compared with the system without FACTS devices. Application of PSO and BAT algorithms to optimally locate the FACTS devices reduces the VCPI index and real power losses in the system.
文摘The growth of wind energy penetration level in distribution system raises the concern about its impact on the operation of the power system, especially voltage stability and power loss. Among the major concerns, this paper studied the impact of connecting wind Turbine (WT) in radial distribution system with different penetration levels and different power factor (lead and lag) on power system voltage stability and power loss reduction. Load flow calculation was carried out using forward-backward sweep method. The analysis proceeds on 9- and 33-bus radial distribution systems. Results show that voltage stability enhancement and power loss reduction should be considered as WT installation objective.
基金the financial support from the Strategic Priority Research Program of the Chinese Academy of Sciences(XDB0450201)the National Key R&D Program of China(2018YFA0209600)+2 种基金USTC Research Funds of the Double FirstClass Initiative(YD2060002033)the Fundamental Research Funds for the Central Universities(WK2060000060)the National Synchrotron Radiation Laboratory(KY2060000199)。
文摘Chloride solid electrolytes possess multiple advantages for the construction of safe,energy-dense allsolid-state sodium batteries,but presently the chlorides with sufficiently high cost-competitiveness for commercialization almost all exhibit low Na-ion conductivities of around 10^(-5)S cm^(-1)or lower.Here,we report a chloride solid electrolyte,Na_(2.7)ZFCl_(5.3)O_(0.7),which reaches a Na-ion conductivity of 2.29×10^(-4)S cm^(-1)at 25℃without involving overly expensive raw materials such as rare-earth chlorides or Na_(2)S.In addition to the efficient ion transport,Na_(2.7)ZrCl_(5.3)O_(0.7)also shows an excellent deformability surpassing that of the widely studied Na_(3)PS_(4),Na_(3)SbS_(4),and Na_(2)ZrCl_(6)solid electrolytes.The combination of these advantages allows the all-solid-state cell based on Na_(2.7)ZrCl_(5.3)O_(0.7)and NaCrO_(2)to realize stable room-temperature cycling at a much higher specific current than those based on other non-viscoelastic chloride solid electrolytes in literature(120 mA g^(-1)vs.12-55 mA g^(-1));after 100 cycles at such a high rate,the Na_(2.7)ZFCl_(5.3)O_(0.7)-based cell can still deliver a discharge capacity of 80 mAh g^(-1)at25℃.
文摘Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in the stability of DN operation.It is urgent to find a method that can effectively connect multi-energy DG to DN.photovoltaic(PV),wind power generation(WPG),fuel cell(FC),and micro gas turbine(MGT)are considered in this paper.A multi-objective optimization model was established based on the life cycle cost(LCC)of DG,voltage quality,voltage fluctuation,system network loss,power deviation of the tie-line,DG pollution emission index,and meteorological index weight of DN.Multi-objective artificial bee colony algorithm(MOABC)was used to determine the optimal location and capacity of the four kinds of DG access DN,and compared with the other three heuristic algorithms.Simulation tests based on IEEE 33 test node and IEEE 69 test node show that in IEEE 33 test node,the total voltage deviation,voltage fluctuation,and system network loss of DN decreased by 49.67%,7.47%and 48.12%,respectively,compared with that without DG configuration.In the IEEE 69 test node,the total voltage deviation,voltage fluctuation and system network loss of DN in the MOABC configuration scheme decreased by 54.98%,35.93%and 75.17%,respectively,compared with that without DG configuration,indicating that MOABC can reasonably plan the capacity and location of DG.Achieve the maximum trade-off between DG economy and DN operation stability.
基金supported by the Science and Technology Project of State Grid Corporation Headquarters(No.5100-202323008A-1-1-ZN).
文摘As the large-scale development of wind farms(WFs)progresses,the connection ofWFs to the regional power grid is evolving from the conventional receiving power grid to the sending power grid with a high proportion of wind power(WP).Due to the randomness of WP output,higher requirements are put forward for the voltage stability of each node of the regional power grid,and various reactive power compensation devices(RPCDs)need to be rationally configured to meet the stable operation requirements of the system.This paper proposes an optimal configuration method for multi-type RPCDs in regional power grids with a high proportion of WP.The RPCDs are located according to the proposed static voltage stability index(VSI)and dynamicVSI based on dynamic voltage drop area,and the optimal configuration model of RPCDs is constructed with the lowest construction cost as the objective function to determine the installed capacity of various RPCDs.Finally,the corresponding regional power grid model for intensive access to WFs is constructed on the simulation platform to verify the effectiveness of the proposed method.
基金the National Natural Science Foundation of China(No.51407007)。
文摘The output current harmonic distortion of a three-level inverter is less than the traditional twolevel inverter.The voltage stress of the semiconductor switch is low.A neutral point potential drift control method is proposed to solve the problem of the neutral point potential drift of the three-level inverter.The interaction mechanism between the neutral point potential and the space voltage vector is presented.The small vector output by the inverter is found to be the root cause of the midpoint potential drift.It is found that the fluctuation of the midpoint potential could be suppressed by increasing the capacitance value of the inverter bus voltage stabilizing capacitor.Furthermore,it inhibits the fluctuation of the midpoint potential.The experimental results verify the efficiency and precision of the proposed method.
文摘How to comprehensively consider the power flow constraints and various stability constraints in a series of power system optimization problems without affecting the calculation speed is always a problem.The computational burden of probabilistic security assessment is even more unimaginable.In order to solve such problems,a security region(SR)methodology is proposed,which is a brand-new methodology developed on the basis of the classical point-wise method.Tianjin University has been studying the SR methodology since the 1980s,and has achieved a series of original breakthroughs that are described in this paper.The integrated SR introduced in this paper is mainly defined in the power injection space,and includes SRs to ensure steady-state security,transient stability,static voltage stability,and smalldisturbance stability.These SRs are uniquely determined for a given network topology(as well as location and clearing process for transient faults)and given system component parameters,and are irrelevant to operation states.This paper presents 11 facts and related remarks to introduce the basic concepts,composition,dynamics nature,and topological and geometric characteristics of SRs.It also provides a practical mathematical description of SR boundaries and fast calculation methods to determine them in a concise and systematic way.Thus,this article provides support for the systematic understanding,future research,and applications of SRs.The most critical finding on the topological and geometric characteristics of SRs is that,within the scope of engineering concern,the practical boundaries of SRs in the power injection space can be approximated by one or a few hyperplanes.Based on this finding,the calculation time for power system probabilistic security assessment(i.e.,risk analysis)and power system optimization with security constraints can be decreased by orders of magnitude.
文摘A comparison of the effectiveness of installing reactive power compensators,such as shunt capacitors,static var compensators(SVCs),and static synchronous compensators(STATCOMs),was presented in large-scale power networks.A suitable bus was first identified using modal analysis method.The single shunt capacitor,single SVC,and single STATCOM were installed separately on the most critical bus.The effects of the installation of different devices on power loss reduction,voltage profile improvement,and voltage stability margin enhancement were examined and compared for 57-and 118-bus transmission systems.The comparative study results show that SVC,and STATCOM are expensive compared to shunt capacitor,yet the effect of installing STATCOM is better than SVC and the effect of installing SVC is better than that of shunt capacitor in achieving power loss reduction,voltage profile improvement and voltage stability margin enhancement.
基金This work was supported in part by the National Science Foundation(NSF-CSSI-2004766,NSF-PFI-2141084).
文摘This paper presents a machine-learning-based speedup strategy for real-time implementation of model-predictive-control(MPC)in emergency voltage stabilization of power systems.Despite success in various applications,real-time implementation of MPC in power systems has not been successful due to the online control computation time required for large-sized complex systems,and in power systems,the computation time exceeds the available decision time used in practice by a large extent.This long-standing problem is addressed here by developing a novel MPC-based framework that i)computes an optimal strategy for nominal loads in an offline setting and adapts it for real-time scenarios by successive online control corrections at each control instant utilizing the latest measurements,and ii)employs a machine-learning based approach for the prediction of voltage trajectory and its sensitivity to control inputs,thereby accelerating the overall control computation by multiple times.Additionally,a realistic control coordination scheme among static var compensators(SVC),load-shedding(LS),and load tap-changers(LTC)is presented that incorporates the practical delayed actions of the LTCs.The performance of the proposed scheme is validated for IEEE 9-bus and 39-bus systems,with±20%variations in nominal loading conditions together with contingencies.We show that our proposed methodology speeds up the online computation by 20-fold,bringing it down to a practically feasible value(fraction of a second),making the MPC real-time and feasible for power system control for the first time.
文摘This article investigates the power quality enhancement in power system using one of the most famous series converter based FACTS controller like IPFC (Interline Power Flow Controller) in Power Injection Model (PIM). The parameters of PIM are derived with help of the Newton-Raphson power flow algorithm. In general, a sample test power system without FACTs devices has generated more reactive power, decreased real power, more harmonics, small power factor and poor dynamic performance under line and load variations. In order to improve the real power, compensating the reactive power, proficient power factor and excellent load voltage regulation in the sample test power system, an IPFC is designed. The D-Q technique is utilized here to derive the reference current of the converter and its D.C link capacitor voltage is regulated. Also, the reference voltage of the inverter is arrived by park transformation technique and its load voltage is controlled. Here, a sample 230 KV test power system is taken for study. Further as the conventional PI controllers are designed at one nominal operating point they are not competent to respond satisfactorily in dynamic operating conditions. This can be circumvented by a Fuzzy and Neural network based IPFC and its detailed Simulink model is developed using MATLAB and the overall performance analysis is carried out under different operating state of affairs.
基金the deanship of Scientific Research at Jouf University for founding this work through research grant no(DSR2020-02-387).https://www.ju.edu.sa/.
文摘This paper presents a new optimization study of the placement and size of a photovoltaic source(PVS)in a distribution grid,based on annual records of meteorological parameters(irradiance,temperature).Based on the recorded data,the production output as well as the daily average power(24-h vector)of the PVS is extracted over the year.When a power vector is available,it can be used as an input when searching for the optimal size of the PVS.This allows to take into account the constraint of the variation of the power generated by this source considering the variation of the power consumed by the electrical loads during the whole day.A multi-objective fitness function has been considered.The latter minimizes the active losses and maximizes the voltage stability index during the day,while considering the constraints of the system,that is,the security,technical,geographical,and meteorological constraints.This problem was solved using the Non-dominated Sorting Genetic Algorithm NSGA-II optimization technique under MATLAB 2021.It was applied to the distribution network of Ghardaïa of 59 nodes.
基金This work was supported by Technology Project of State Grid Jiangsu Electric Power Co.,Ltd.,China(J2022114,Risk Assessment and Coordinated Operation of Coastal Wind Power Multi-Point Pooling Access System under Extreme Weather).
文摘The lack of reactive power in offshore wind farms will affect the voltage stability and power transmission quality of wind farms.To improve the voltage stability and reactive power economy of wind farms,the improved particle swarmoptimization is used to optimize the reactive power planning in wind farms.First,the power flow of offshore wind farms is modeled,analyzed and calculated.To improve the global search ability and local optimization ability of particle swarm optimization,the improved particle swarm optimization adopts the adaptive inertia weight and asynchronous learning factor.Taking the minimum active power loss of the offshore wind farms as the objective function,the installation location of the reactive power compensation device is compared according to the node voltage amplitude and the actual engineering needs.Finally,a reactive power optimizationmodel based on Static Var Compensator is established inMATLAB to consider the optimal compensation capacity,network loss,convergence speed and voltage amplitude enhancement effect of SVC.Comparing the compensation methods in several different locations,the compensation scheme with the best reactive power optimization effect is determined.Meanwhile,the optimization results of the standard particle swarm optimization and the improved particle swarm optimization are compared to verify the superiority of the proposed improved algorithm.
文摘Load flow studies play a critical role in the analysis of power systems. They enable the computation of voltage, current, and power flows in a power system. They provide valuable insights into the steady-state performance of the power system under different operating conditions. Choosing a slack bus is a vital step in conducting load flow simulations. A slack bus is a PV bus that includes a generator and is used to balance real and reactive power during load flow studies. Many studies have been conducted on the selection of slack buses in load flow analysis. However, varied conclusions regarding the impact on system losses and power flows were obtained during these studies. Therefore, using the IEEE-14 bus test system, this study investigated the effects of slack bus selection in strong and weak grids by alternating slack buses among PV buses and observing the effects on bus voltage magnitude, bus voltage phase angle, total power flows, and active and reactive power losses. The study noted that the effect of slack bus selection on these system quantities is contingent upon the voltage stability of the grid. Whereas in a robust grid, system losses and power flows remained constant irrespective of the choice of slack bus, a weak grid experienced some variations in these system quantities under similar circumstances. The simulation results led to the conclusion that, to a large extent, the voltage stability of the grid plays a significant role in determining the degree to which slack bus selection affects system losses and other quantities in load flow studies.