With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDW...With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDWP)is proposed to provide ample drinking water to Dehradun City and its suburban areas.This paper examined economic significance and environmental impacts of the SDDWP in Garhwal Himalaya,India.To conduct this study,we collected data from both primary and secondary sources.There are 12 villages and 3 forest divisions in the surrounding areas of the proposed dam project,of which 3 villages will be fully submerged and 50 households will be affected.For this study,50 heads of the households were interviewed in the 3 submerged villages.The questions mainly focused on economic significance,environmental impacts,and rehabilitation issues of the dam project.The findings of this study indicate that economic significance of the dam project is substantial,including providing ample water for drinking and irrigation,contributing to groundwater recharge,creating job opportunities,and promoting the development of tourism and fisheries in the Doon Valley.In terms of the rehabilitation of the affected people,there are only 50 households in need of rehabilitation.Currently,the arable land of these affected people is not sufficient to sustain their livelihoods.The entire landscape is fragile,rugged,and precipitous;therefore,the affected people are willing to rehabilitate to more suitable areas in the Doon Valley.Moreover,it is essential to provide them with sufficient compensation packages including the compensation of arable land,houses,cash,common property resources,institutions,belongingness,and cultural adaptation.On the other hand,the proposed dam project will have adverse environmental impacts including arable land degradation,forest degradation,loss of fauna and flora,soil erosion,landslides,and soil siltation.These impacts will lead to the ecological imbalances in both upstream and downstream areas.This study suggests that the affected people should be given sufficient compensation packages in all respects.Afforestation programs can be launched in the degraded areas to compensate for the loss of forest in the affected areas.展开更多
Since rural drinking water projects have diversified investment subjects,complex form,and lacks property right system and policy at national level,there are many difficulties in determining property right of projects ...Since rural drinking water projects have diversified investment subjects,complex form,and lacks property right system and policy at national level,there are many difficulties in determining property right of projects in many areas.This not only puzzles competent authorities and specific management institution,but also is unfavorable for long-term full play of project benefit.Combining related laws,regulations,and policies,this paper analyzed and discussed property right of rural drinking water projects.It proposed establishing usufructuary right to replace division of property right,in the hope of helping improve management of rural drinking water projects.展开更多
Through analysis on the background to develop eco-tourism and necessity for ecological compensation,based on specific condition of Hukou County,in line with the situation to develop eco-tourism during ecological water...Through analysis on the background to develop eco-tourism and necessity for ecological compensation,based on specific condition of Hukou County,in line with the situation to develop eco-tourism during ecological water control project of Poyang Lake,residents' interest protection system and ecological benefit safeguard system for eco-tourism compensation were put forward.展开更多
Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention...Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention.The ecological risk management of drinking water project is an important means of ensuring the safety of a drinking water source. Based on ecological risk assessment and management theories, this paper establishes an ecological risk management model and assessment system with the aim of providing theoretical guidance and scientific basis for formulating a policy on the safety and protection of drinking water sources in a city. Kunming is one of the cities plagued by severe water shortage in China. Its ecological risk management of drinking water has attracted the attention of both the local government and the public.Using Kunming as the case study, this paper conducts a comparative analysis and assessment on three major reservoirs that face ecological risks. It highlights the existing problems and gives helpful suggestions.展开更多
One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR ...One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR.展开更多
In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi...In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.展开更多
The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis...The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.展开更多
In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, we...In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, wetland, and riparian ecosystems. To assess the integrated impact of water diversion on ecological water uses, we proposed a hierarchy evaluation model composed of four layers representing the evaluation goal, sub-areas of the influenced region, evaluation criteria, and water diversion schemes, respectively. The evaluation criteria for different types of ecological water uses were proposed, and the analytical hierarchy process was used for the integrated assessment. For a river ecosystem, the percentage of mean annual flow was used to define the grade of environmental flow. For a lake ecosystem, water recharge to the lake to compensate the lake water losses was used to assess the ecological water use of a lake. The flooding level of the wetland and the groundwater level in the riparian plain were used to assess the wetland and riparian ecological water uses, respectively. The proposed model was applied to a basin in northern Xinjiang in northwest China, where both water diversion and inter-basin water transfer projects were planned to be carried out. Based on assessment results for the whole study area and two sub-areas, an appropriate scheme was recommended from four planning schemes. With the recommended scheme, ecological water uses of the influenced ecosystems can be maintained at an acceptable level. Meanwhile, economical water requirements can be met to a great extent.展开更多
In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connectio...In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up.展开更多
Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the sy...Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.展开更多
Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will dec...Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years.展开更多
The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial u...The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas.展开更多
The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological ...The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.展开更多
The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upst...The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area.展开更多
In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel...In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.展开更多
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculatio...According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,展开更多
Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific...Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling.展开更多
The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as ...The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch (NB),the South Branch (SB),the North Channel (NC),the South Channel (SC),the North Passage (NP) and the South Passage (SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides.展开更多
The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of ...The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.展开更多
文摘With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDWP)is proposed to provide ample drinking water to Dehradun City and its suburban areas.This paper examined economic significance and environmental impacts of the SDDWP in Garhwal Himalaya,India.To conduct this study,we collected data from both primary and secondary sources.There are 12 villages and 3 forest divisions in the surrounding areas of the proposed dam project,of which 3 villages will be fully submerged and 50 households will be affected.For this study,50 heads of the households were interviewed in the 3 submerged villages.The questions mainly focused on economic significance,environmental impacts,and rehabilitation issues of the dam project.The findings of this study indicate that economic significance of the dam project is substantial,including providing ample water for drinking and irrigation,contributing to groundwater recharge,creating job opportunities,and promoting the development of tourism and fisheries in the Doon Valley.In terms of the rehabilitation of the affected people,there are only 50 households in need of rehabilitation.Currently,the arable land of these affected people is not sufficient to sustain their livelihoods.The entire landscape is fragile,rugged,and precipitous;therefore,the affected people are willing to rehabilitate to more suitable areas in the Doon Valley.Moreover,it is essential to provide them with sufficient compensation packages including the compensation of arable land,houses,cash,common property resources,institutions,belongingness,and cultural adaptation.On the other hand,the proposed dam project will have adverse environmental impacts including arable land degradation,forest degradation,loss of fauna and flora,soil erosion,landslides,and soil siltation.These impacts will lead to the ecological imbalances in both upstream and downstream areas.This study suggests that the affected people should be given sufficient compensation packages in all respects.Afforestation programs can be launched in the degraded areas to compensate for the loss of forest in the affected areas.
文摘Since rural drinking water projects have diversified investment subjects,complex form,and lacks property right system and policy at national level,there are many difficulties in determining property right of projects in many areas.This not only puzzles competent authorities and specific management institution,but also is unfavorable for long-term full play of project benefit.Combining related laws,regulations,and policies,this paper analyzed and discussed property right of rural drinking water projects.It proposed establishing usufructuary right to replace division of property right,in the hope of helping improve management of rural drinking water projects.
基金Supported by Key Bid Program of Poyang Lake Ecological Economy Research Center of Jiangxi Province(09KJ01)~~
文摘Through analysis on the background to develop eco-tourism and necessity for ecological compensation,based on specific condition of Hukou County,in line with the situation to develop eco-tourism during ecological water control project of Poyang Lake,residents' interest protection system and ecological benefit safeguard system for eco-tourism compensation were put forward.
基金financially supported by the Frontiers Research Support Program(QY2015025)of the Faculty of Management&Economics,Kunming University of Science and Technology
文摘Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention.The ecological risk management of drinking water project is an important means of ensuring the safety of a drinking water source. Based on ecological risk assessment and management theories, this paper establishes an ecological risk management model and assessment system with the aim of providing theoretical guidance and scientific basis for formulating a policy on the safety and protection of drinking water sources in a city. Kunming is one of the cities plagued by severe water shortage in China. Its ecological risk management of drinking water has attracted the attention of both the local government and the public.Using Kunming as the case study, this paper conducts a comparative analysis and assessment on three major reservoirs that face ecological risks. It highlights the existing problems and gives helpful suggestions.
基金Supported by the National Basic Research Program of China (973 Program) (No. 2008CB418006)the Knowledge Innovation Program of Chinese Academy of Sciences (No. KZCX-YW-14-1)
文摘One of the water source areas of the South-to-North Water Diversion Project is the Danjiangkou Reservoir (DJKR). To understand seasonal variation in phytoplankton composition, abundance and distribution in the DJKR area before water diversion, as well as to estimate potential risks of water quality after water diversion, we conducted an investigation on phytoplankton in the DJKR from August 2008 to May 2009. The investigation included 10 sampling sites, each with four depths of 0.5, 5, 10, and 20 m. In this study, 117 taxa belonging to 76 genera were identified, consisting of diatoms (39 taxa), green algae (47 taxa), blue-green algae (19 taxa), and others (12 taxa). Annual average phytoplankton abundance was 2.01×10^6 ind./L, and the highest value was 14.72 ×10^6 ind/L (at site 3 in August 2008). Phytoplankton abundance in front of the Danjiangkou Dam (DJKD) was higher than that of the Danjiang Reservoir Basin. Phytoplankton distribution showed a vertical declining trend from 0.5 m to 20 m at most sites in August 2008 (especially at sites of 1, 2, 4 and 10), but no distinct pattern in other sampling months. In December 2008 and March 2009, Stephanodiseus sp. was the most abundant species, amounting to 55.23% and 72.34%, respectively. We propose that high abundance ofStephanodiscus sp. may have contributed greatly to the frequent occurrence of Stephanodiscus sp. blooms in middle-low reaches of the Hanjiang River during the early spring of 2009. In comparison with previous studies conducted from 1992 to 2006, annual average phytoplankton density, green algae and blue-green algae species, as well as major nutrient concentrations increased, while phytoplankton diversity indices declined. This indicates a gradual decline in water quality. More research should be conducted and countermeasures taken to prevent further deterioration of water quality in the DJKR.
基金supported by the Water Conservancy Science and Technology Project of Jiangsu Province(Grant No.2012041)the Jiangsu Province Ordinary University Graduate Student Research Innovation Project(Grant No.CXZZ13_0256)
文摘In this study, we simulated water flow in a water conservancy project consisting of various hydraulic structures, such as sluices, pumping stations, hydropower stations, ship locks, and culverts, and developed a multi-period and multi-variable joint optimization scheduling model for flood control, drainage, and irrigation. In this model, the number of sluice holes, pump units, and hydropower station units to be opened were used as decision variables, and different optimization objectives and constraints were considered. This model was solved with improved genetic algorithms and verified using the Huaian Water Conservancy Project as an example. The results show that the use of the joint optimization scheduling led to a 10% increase in the power generation capacity and a 15% reduction in the total energy consumption. The change in the water level was reduced by 0.25 m upstream of the Yundong Sluice, and by 50% downstream of pumping stations No. 1, No. 2, and No. 4. It is clear that the joint optimization scheduling proposed in this study can effectively improve power generation capacity of the project, minimize operating costs and energy consumption, and enable more stable operation of various hydraulic structures. The results may provide references for the management of water conservancy projects in complex river networks.
文摘The conditions for the positive operation of water conservancy projects are described in this paper. A scientific and effective evaluation index system was established based on frequency analysis, theoretical analysis, and expert consultation. This evaluation index system can be divided into six first-level indices: the degree to which facilities are intact and functionality standards are reached, the status of operation and management funds, the rationality and degree of advancement of the management team structure, the adaptability and rationality of the water conservancy project management system, the degree of automatization and informationization of the management techniques, and the conduciveness of the exterior environment. The weights for evaluation indices were obtained through the analytic hierarchy process method with consideration of the difference between public welfare and profit-oriented water conservancy projects. This study provides a scientific method for evaluating the positive operation of water conservancy projects.
基金supported by the National Natural Science Foundation of China (Grant No. 50879041)
文摘In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, wetland, and riparian ecosystems. To assess the integrated impact of water diversion on ecological water uses, we proposed a hierarchy evaluation model composed of four layers representing the evaluation goal, sub-areas of the influenced region, evaluation criteria, and water diversion schemes, respectively. The evaluation criteria for different types of ecological water uses were proposed, and the analytical hierarchy process was used for the integrated assessment. For a river ecosystem, the percentage of mean annual flow was used to define the grade of environmental flow. For a lake ecosystem, water recharge to the lake to compensate the lake water losses was used to assess the ecological water use of a lake. The flooding level of the wetland and the groundwater level in the riparian plain were used to assess the wetland and riparian ecological water uses, respectively. The proposed model was applied to a basin in northern Xinjiang in northwest China, where both water diversion and inter-basin water transfer projects were planned to be carried out. Based on assessment results for the whole study area and two sub-areas, an appropriate scheme was recommended from four planning schemes. With the recommended scheme, ecological water uses of the influenced ecosystems can be maintained at an acceptable level. Meanwhile, economical water requirements can be met to a great extent.
基金supported by the National Science and Technology Plan(Major Project of the Eleventh Five-Year Plan,Grant No.2006BAB04A13)
文摘In order to analyze the indispensability of the organization management chain of the South-to-North Water Diversion Project (SNWDP), two basic forms (series connection state and mixed state of both series connection and parallel connection) of the organization management chain can be abstracted. The indispensability of each form has been studied and is described in this paper. Through analysis of the reliability of the two basic forms, reliability models of the organization management chain in the series connection state and the mixed state of both series connection and parallel connection have been set up.
基金supported by the National Science and Technology Plan (Major Project of the Eleventh Five-Year Plan,Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of the Education Department of Jiangsu Province (Grant No.07SJD630006)+2 种基金the Third Key Discipline (Techno-Economics and Management) of the 211 Projectthe Key Discipline of Jiangsu Province (Engineering and Project Management)the Office of the South-to-North Water Diversion Project Construction Committee under the State Council
文摘Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.
基金supported by the National Natural Science Foundation of China (Grant No 50339010)
文摘Previous research shows that there is a strong correlation between saltwater intrusion in the Yangtze Estuary and discharge at Datong. In the near future, the discharge of the Yangtze River during dry seasons will decrease due to the construction and operation of large water diversion projects, including the South-to-North Water Transfer Project, which will further exacerbate saltwater intrusion in the estuary. In this paper, a nested 1D river network model and a 2D saltwater numerical model are used to associate saltwater intrusion in the Yangtze Estuary with different values of discharge at Datong. It is concluded that 13 000 m3/s is the critical discharge at Datong for preventing saltwater intrusion and controlling the volume of water transferred by the South-to-North Water Transfer Project. Furthermore, based on the analysis of river discharge from Datong to Xuliujing and in consideration of the influence of all of the water diversion projects, operation schemes are proposed for the Eastern Route of the South-to-North Water Transfer Project for different hydrological years.
基金Under the auspices of the National Key Research and Development Program of China(No.2016YFC0500201-01)National Natural Science Foundation of China(No.41671365,41771464)the Annual Project of the Office of the South-to-North Water Diversion Project(No.2018-21)
文摘The Middle Route of the South-to-North Water Diversion Project(MR-SNWDP)in China,with construction beginning in 2003,diverts water from Danjiangkou Reservoir to North China for residential,agriculture and industrial use.The water source area of the MR-SNWDP is the region that is most sensitive to and most affected by the construction of this water diversion project.In this study,we used Landsat Thematic Mapper(TM)and HJ-1 A/B images from 2000 to 2015 by an object-based approach with a hierarchical classification method for mapping land cover in the water source area.The changes in land cover were illuminated by transfer matrixes,single dynamic degree,slope zones and fractional vegetation cover(FVC).The results indicated that the area of cropland decreased by 31%and was replaced mainly by shrub over the past 15 years,whereas forest and settlements showed continuous increases of 29.2% and 77.7%,respectively.The changes in cropland were obvious in all slope zones and decreased most remarkably(–43.8%)in the slope zone above 25°.Compared to the FVC of forest and shrub,significant improvement was exhibited in the FVC of grassland,with a growth rate of 16.6%.We concluded that local policies,including economic development,water conservation and immigration resulting from the construction of the MR-SNWDP,were the main drivers of land cover changes;notably,they stimulated the substantial and rapid expansion of settlements,doubled the wetlands and drove the transformation from cropland to settlements in immigration areas.
基金supported by the Fundamental Research Funds for the Central Universities(Grant No.2013B102008)the Open Fund of the Yellow River Committee(Grant No.2011535012)
文摘The modernization of water conservancy project management is a complicated engineering system involving a management system, a management method, management personnel, the exertion of social, economic, and ecological effects, and so on. However, indices for evaluating the modernization of water conservancy project management are usually unobtainable in practical applications. Conducting appropriate extension of the classical rough set theory and then applying it to an incomplete information system are the key to the application of the rough set theory Based on analysis of some extended rough set models in incomplete information systems, a rough set model based on the θ-improved limited tolerance relation is put forward. At the same time, upper approximation and lower approximation are defined under this improved relation. According to the evaluation index system and management practices, the threshold for θ is defined. An example study indicates the practicability and maneuverability of the model.
基金supported by the China Meteorological Data Sharing Service System,the Bureau of Hydrology,and Water Resources of Sichuan Province,China
文摘The Western Route of the South-to-North Water Diversion Project is an important trans-basin diversion project to transfer water from the upstream Yangtze River and its tributaries (water-exporting area), to the upstream of the Yellow River (water- importing area). The long-term hydrologieal data from 14 stream gauging stations in the Western Route area and techniques including the pre-whitening approach, non-parametric test, Bayes, law, variance analysis extrapolation, and Wavelet Analysis are applied to identify the streamflow eharacteristics and trends, streamflow time series cross-correlations, wetness-dryness encountering probability, and periodicities that occurred over the last 50 years. The results show that the water-exporting area, water- importing area, and the streteh downstream of the water-exporting have synehronization in high-low flow relationship, whereas they display non- synchronization in long-term evolution. This corresponds to the complicated and variable climate of the plateau region. There is no obvious increasing or decreasing trend in runoff at any gauging station. The best hydrological eompensation probability for rivers where water is diverted is about 25% to lO%, and those rivers influenced significantly by diversion are the Jinsha and Yalong rivers. Proper planning and design of compensation reservoirs for the water-exporting area and stretch downstream of the water- exporting area can increase the hydrological compensation possibility from water-exporting area to the water-importing area, and reduce the impact on the stretch of river downstream of the water- exporting area.
基金Supported by the National Key Technology R&D Program in the 11th Five-year Plan of China (2006BAB04A06)
文摘In terms of special geological conditions of the Western Route of South-to-North Water Transfer Project, the classification method for surrounding rocks is discussed by combining with the construction method of tunnel boring machine (TBM). The classification standard of surrounding rocks is put forward on the basis of physical simulations and engineering practices. Damage, deformation and evolution of surrounding rocks induced by TBM excavation are discussed. Meanwhile, the long-term deformation mechanisms and stability of surrounding rocks are also studied. On this basis, a three-dimensional constitutive model for interbedded sandstone slate and a fiat shell-joint element-foundation system for calculating internal forces of segment lining are established. The deformation features of surrounding rocks of deep and steep interbedded sandstone slate and their influences on internal forces of segment lining are presented. Finally, the design methods of segment lining constructed in deep and steep flysch are proposed.
基金supported by the National Science and Technology Plan of China (Major Project of the Eleventh Five-Year Plan, Grant No. 2006BAB04A13)the Philosophy and Social Science Fund of Education Department of Jiangsu Province (Grant No. 07SJD630006)+1 种基金the Third Key Discipline (Techno-Economics and Management) of the Project 211the Key Disciplines of Jiangsu Province (Engineering and Project Management)
文摘According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals. On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-induced delay of the bidding section construction period in detail, including the effects on the construction period of the bidding section itself, the earliest start times of the next bidding section and other subsequent bidding sections, and the construction period of the program, and then constructed a penalty model for delay of the bidding section construction period from the perspective of programs. Using the penalty model, we conducted a practical analysis of penalty for delay of the construction period of the Baoying station program in the South-to-North Water Diversion Project. The model can help determine the amount of penalty for delay of the construction period in bidding sections scientifically and reasonably,
文摘Objective To recognize and assess the impact of the South-to-north Water Transfer Project (SNWTP) on the ecological environment of Xiangfan, Hubei Province, situated in the water-out area, and develop sound scientific countermeasures. Methods A three-layer BP network was built to simulate topology and process of the eco-economy system of Xiangfan. Historical data of ecological environmental factors and socio-economic factors as inputs, and corresponding historical data of ecosystem service value (ESV) and GDP as target outputs, were presented to train and test the network. When predicted input data after 2001 were presented to trained network as generalization sets, ESVs and GDPs of 2002, 2003, 2004... till 2050 were simulated as output in succession. Results Up to 2050, the area would have suffered an accumulative total ESV loss of RMB 104.9 billion, which accounted for 37.36% of the present ESV. The coinstantaneous GDP would change asynchronously with ESV, it would go through an up-to-down process and finally lose RMB89.3 billion, which accounted for 18.71% of 2001. Conclusions The simulation indicates that ESV loss means damage to the capability of socio-economic sustainable development, and suggests that artificial neural networks (ANNs) provide a feasible and effective method and have an important potential in ESV modeling.
基金The National Basic Science Research Program of Global Change Research of China under contract No.2010CB951201the Funds for Creative Research Groups of China under contract No. 41021064the National Natural Science Foundation of China under contract No. 40976056
文摘The south to the north project (WDP) on the saltwater intrusion in the Changjiang Estuary is studied by the improved three-dimensionai (3D) numerical model.The net unit width flux in the Changjiang Estuary as well as the sectional salt flux is calculated in the North Branch (NB),the South Branch (SB),the North Channel (NC),the South Channel (SC),the North Passage (NP) and the South Passage (SP),respectively.The net seaward water flux in the SB is reduced,and the net water flux spilling over from the NB to the SB is enhanced after the eastern WDP.Under the mean river discharge condition in the dry season,the net salt flux spilling over from the NB to the SB is increased by 2.09 t/s and 0.52 t/s during the spring and neap tides,respectively,due to the eastern WDP.The saltwater intrusion in the Changjiang Estuary is enhanced by the eastern WDP.Compared with that during the spring tide,the net water diversion ratio during the neap tide in the NC is smaller,and thus the enhancement of the saltwater intrusion by the eastern WDP is smaller in the NC,and larger in the NP and the SP.The tidally averaged surface salinity at the water intakes of the Dongfengxisha Reservoir,the Chenhang Reservoir and the Qingcaosha Reservoir rises both during the spring and neap tides.
基金The authors would like to acknowledge the funding support of the National Natural Science Foundation of China (Nos. 50579009, 70425001 ) the National 10th Five Year Scientific Project of China for Tackling the Key Problems (2004BA608B-02-02)the Excellence Youth Teacher Sustentation Fund Program of the Ministry of Education of China (Department of Education and Personnel [ 2002 ] 350).
文摘The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.