A bulk power system is conventionally characterized by a complex structure with a large number of components. Each component generally has a different contribution to the transmission congestion(TC) of a system. Thus,...A bulk power system is conventionally characterized by a complex structure with a large number of components. Each component generally has a different contribution to the transmission congestion(TC) of a system. Thus, a TC sharing method that can be used to evaluate the contribution of each component to the system TC and recognize the weak parts from the perspective of TC should be built. This paper presents a transmission congestion tracing(TCT) principle based on the failed component sharing principle and proportional sharing principle and a TCT model using the Monte Carlo simulation method. Case studies on the IEEE Reliability Test System indicate that the proposed method is effective and feasible.展开更多
On the basis of main contents of social construction and key points of construction,this paper analyzes features of conditions of northwest Sichuan plateau pastoral area.The social construction at current stage mainly...On the basis of main contents of social construction and key points of construction,this paper analyzes features of conditions of northwest Sichuan plateau pastoral area.The social construction at current stage mainly includes social cause in narrow sense,and social management at meso-level.The northwest Sichuan plateau pastoral area is faced with the best policy and development opportunity.However,there are still many weak aspects.Firstly,social structure is not coordinated with economic structure.Secondly,social construction ability of grass-roots government is weak.Thirdly,the ability to respond to public demands is low.Fourthly,there is a big gap in availability of basic public service.Finally,it presents path selection for social construction of northwest Sichuan plateau pastoral area:strengthen social construction ability of grass-roots government;promote social construction with livelihood projects as key projects;boost social construction taking advantage of ecological construction;develop basic public service with the aid of external forces;intensify evaluation system for supervision of social construction works.展开更多
基金supported by National Natural Science Foundation of China(No.51247006)
文摘A bulk power system is conventionally characterized by a complex structure with a large number of components. Each component generally has a different contribution to the transmission congestion(TC) of a system. Thus, a TC sharing method that can be used to evaluate the contribution of each component to the system TC and recognize the weak parts from the perspective of TC should be built. This paper presents a transmission congestion tracing(TCT) principle based on the failed component sharing principle and proportional sharing principle and a TCT model using the Monte Carlo simulation method. Case studies on the IEEE Reliability Test System indicate that the proposed method is effective and feasible.
基金Supported by the Ford Foundation " Policy Research on Development of Plateau Pastoral Areas at Upstream Yangtze River"(1095-0787)
文摘On the basis of main contents of social construction and key points of construction,this paper analyzes features of conditions of northwest Sichuan plateau pastoral area.The social construction at current stage mainly includes social cause in narrow sense,and social management at meso-level.The northwest Sichuan plateau pastoral area is faced with the best policy and development opportunity.However,there are still many weak aspects.Firstly,social structure is not coordinated with economic structure.Secondly,social construction ability of grass-roots government is weak.Thirdly,the ability to respond to public demands is low.Fourthly,there is a big gap in availability of basic public service.Finally,it presents path selection for social construction of northwest Sichuan plateau pastoral area:strengthen social construction ability of grass-roots government;promote social construction with livelihood projects as key projects;boost social construction taking advantage of ecological construction;develop basic public service with the aid of external forces;intensify evaluation system for supervision of social construction works.