The shale gas accumulation conditions in the basin-margin transition zone of southeastern Chongqing in SW China are complex.In order to improve single-well productivity in this area,the geologic characteristics,major ...The shale gas accumulation conditions in the basin-margin transition zone of southeastern Chongqing in SW China are complex.In order to improve single-well productivity in this area,the geologic characteristics,major factors controlling the occurrence of sweet spots,and drilling/fracturing optimization were investigated in this study.The sweet spot evaluation system and criteria were established,and the horizontal-well-design technology was developed.The following three conclusions were drawn.First,the accumulation and high-productivity-oriented approaches for sweet spot evaluation are proposed and the criteria are established based on screened key indicators.Second,the horizontal well was designed based on:(1)the“six-map”method,to identify both the geology and engineering sweet spots for well locations;and(2)seismic attributes,to predict the development of fractures and cavities,and thus,avoid mud loss and improve the drilling efficiency.The target window,well-azimuth optimization,and the curvature were forecasted to improve the fracturing performances.Third,the Pingqiao anticline,Dongsheng anticline,Jinfo slope,and Wulong syncline were selected as Type I sweet spots.Currently,shale gas has been successfully discovered in the basin-margin transition zone and is being commercially developed.展开更多
The mechanism of the effects of anisotropic permeability on well patterns and reservoir development are investigated by coordinate transformation, fluid flow analysis, and reservoir development concepts. Anisotropy of...The mechanism of the effects of anisotropic permeability on well patterns and reservoir development are investigated by coordinate transformation, fluid flow analysis, and reservoir development concepts. Anisotropy of permeability has reconstructive effects on well patterns. The originally designed flooding units are broken up, and new pattern units are made up of the wells that belong to different original units. The behavior possesses strong randomness, and leads to a complicated relationship among the injection and production wells, and unpredictable productivity of the formations. To prevent the break-up of well patterns, well lines should be either parallel or perpendicular to the maximum principal direction of the anisotropic permeability (i.e. the fracture direction). To optimize the development effects ofanisotropic formations, the latitudinal and longitudinal well spacing of the well network are calculated from the principal values of the anisotropic permeability.展开更多
Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit, Theis equations are chosen to calculate and analyze the relationship between water level drawdown of c...Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit, Theis equations are chosen to calculate and analyze the relationship between water level drawdown of confined aquifer and dewatering duration. In order to reduce engineering cost and diminish detrimental effect on ambient surrounding, optimization design target function based on the control of confined water drawdown and four restriction requisitions based on the control of safe water level, resistance to throwing up from the bottom of foundation pit, avoiding excessively great subsidence and unequal surface subsidence are proposed. A deep well dewatering project in the deep foundation pit is optimally designed. The calculated results including confined water level drawdown and surface subsidence are in close agreement with the measured results, and the optimization design can effectively control both surface subsidence outside foundation pit and unequal subsidence as a result of dewatering.展开更多
Aiming at the paraffin-deposition problem of a beam well, the automatic paraffin-controlling device is designed by making use of ratchet-pallet mechanism, cam mechanism and modern designing method. The device has four...Aiming at the paraffin-deposition problem of a beam well, the automatic paraffin-controlling device is designed by making use of ratchet-pallet mechanism, cam mechanism and modern designing method. The device has four main functions: paraffin-controlling, paraffin removal, centralizing the pumping rod, and improving the safety of well tubing. This device integrates the advantages of the paraffin control, such as strong magnetic paraffin controlling and mechanical paraffin-cutting. Theoretical analysis shows that this device has fine working reliability. It turns out to be a new device which can solve the paraffin-deposition problem of a beam well economically and efficiently.展开更多
In order to avoid mistakes and to save a great deal of time in analysis, an innovative methodology was developed that can analyze the well operations and rig characteristics involved to define the best emergency disco...In order to avoid mistakes and to save a great deal of time in analysis, an innovative methodology was developed that can analyze the well operations and rig characteristics involved to define the best emergency disconnect sequence (EDS) available. A solution was developed based on the characteristics of the rigs and blowout preventers (BOPs), and six variables were considered that directly affect the choice of EDS. All possible combinations of 64 scenarios were analyzed, and the priority of choice of the EDS was defined empirically. This paper presents an approach to EDS risk management and examples of exposure time (time without riser safety margin and shear capability) for the same well, which can be lowered from 13% to 0.1%. The impact of this reduction is related to the ability of the BOP to cut some of the heavy casings, in addition to improved availability of EDS modes. This implementation opened up many possibilities for the performance of risk exposure analysis, enabling comparison of several BOP configurations of contracted rigs and selection of the best options. This innovative approach allowed a better management of the rig schedules, prioritizing safety aspects and making it possible to allocate the fleet in a systematic way.展开更多
基金supported by the National Science and Technology Major Project(No.2016ZX05061)the Project of Sinopec Science&Technology Department(No.P18057-2).
文摘The shale gas accumulation conditions in the basin-margin transition zone of southeastern Chongqing in SW China are complex.In order to improve single-well productivity in this area,the geologic characteristics,major factors controlling the occurrence of sweet spots,and drilling/fracturing optimization were investigated in this study.The sweet spot evaluation system and criteria were established,and the horizontal-well-design technology was developed.The following three conclusions were drawn.First,the accumulation and high-productivity-oriented approaches for sweet spot evaluation are proposed and the criteria are established based on screened key indicators.Second,the horizontal well was designed based on:(1)the“six-map”method,to identify both the geology and engineering sweet spots for well locations;and(2)seismic attributes,to predict the development of fractures and cavities,and thus,avoid mud loss and improve the drilling efficiency.The target window,well-azimuth optimization,and the curvature were forecasted to improve the fracturing performances.Third,the Pingqiao anticline,Dongsheng anticline,Jinfo slope,and Wulong syncline were selected as Type I sweet spots.Currently,shale gas has been successfully discovered in the basin-margin transition zone and is being commercially developed.
文摘The mechanism of the effects of anisotropic permeability on well patterns and reservoir development are investigated by coordinate transformation, fluid flow analysis, and reservoir development concepts. Anisotropy of permeability has reconstructive effects on well patterns. The originally designed flooding units are broken up, and new pattern units are made up of the wells that belong to different original units. The behavior possesses strong randomness, and leads to a complicated relationship among the injection and production wells, and unpredictable productivity of the formations. To prevent the break-up of well patterns, well lines should be either parallel or perpendicular to the maximum principal direction of the anisotropic permeability (i.e. the fracture direction). To optimize the development effects ofanisotropic formations, the latitudinal and longitudinal well spacing of the well network are calculated from the principal values of the anisotropic permeability.
基金This paper is supported by the Hubei Construct Science Foundation of China (G200013).
文摘Based on analyses of the theories of groundwater unsteady flow in deep well dewatering in the deep foundation pit, Theis equations are chosen to calculate and analyze the relationship between water level drawdown of confined aquifer and dewatering duration. In order to reduce engineering cost and diminish detrimental effect on ambient surrounding, optimization design target function based on the control of confined water drawdown and four restriction requisitions based on the control of safe water level, resistance to throwing up from the bottom of foundation pit, avoiding excessively great subsidence and unequal surface subsidence are proposed. A deep well dewatering project in the deep foundation pit is optimally designed. The calculated results including confined water level drawdown and surface subsidence are in close agreement with the measured results, and the optimization design can effectively control both surface subsidence outside foundation pit and unequal subsidence as a result of dewatering.
文摘Aiming at the paraffin-deposition problem of a beam well, the automatic paraffin-controlling device is designed by making use of ratchet-pallet mechanism, cam mechanism and modern designing method. The device has four main functions: paraffin-controlling, paraffin removal, centralizing the pumping rod, and improving the safety of well tubing. This device integrates the advantages of the paraffin control, such as strong magnetic paraffin controlling and mechanical paraffin-cutting. Theoretical analysis shows that this device has fine working reliability. It turns out to be a new device which can solve the paraffin-deposition problem of a beam well economically and efficiently.
基金the support of Intelie Soucoes em Informáica LTDA
文摘In order to avoid mistakes and to save a great deal of time in analysis, an innovative methodology was developed that can analyze the well operations and rig characteristics involved to define the best emergency disconnect sequence (EDS) available. A solution was developed based on the characteristics of the rigs and blowout preventers (BOPs), and six variables were considered that directly affect the choice of EDS. All possible combinations of 64 scenarios were analyzed, and the priority of choice of the EDS was defined empirically. This paper presents an approach to EDS risk management and examples of exposure time (time without riser safety margin and shear capability) for the same well, which can be lowered from 13% to 0.1%. The impact of this reduction is related to the ability of the BOP to cut some of the heavy casings, in addition to improved availability of EDS modes. This implementation opened up many possibilities for the performance of risk exposure analysis, enabling comparison of several BOP configurations of contracted rigs and selection of the best options. This innovative approach allowed a better management of the rig schedules, prioritizing safety aspects and making it possible to allocate the fleet in a systematic way.
基金国家自然科学基金面上项目“基于高压人群身心健康的工作环境绿色空间体系研究”(编号51978364)丰田跨学科专项2022“未来城市跨学科研究关键技术集成与示范”(Action Plan for Integrated Demonstration of Key Technologies for Interdisciplinary Research on Future Cities)共同资助。