Study on integrated development and hybrid operation mode of nuclear power plant and pumped-storage power station 被引量:6
1
作者 Haizheng Wang Caide Peng 《Global Energy Interconnection》 2019年第4期336-341,共6页
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode... The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed. 展开更多
关键词 NUCLEAR power plant pumped-storage power STATION Integrated development HYBRID operation MODES
下载PDF
An optimal strategy for coordinating and dispatching “source-load” in power system based on multiple time scales 被引量:1
2
作者 LIU Yan-feng DONG Hai-ying +1 位作者 WANG Ning-bo MA Ming 《Journal of Measurement Science and Instrumentation》 CAS CSCD 2018年第4期388-396,共9页
Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system b... Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system. 展开更多
关键词 multiple time scales "source-load"coordination pumped-storage power station wind plant photovoltaic(PV)power station
下载PDF
有加强肋板的三岔管水流数值模拟及水头损失研究 被引量:3
3
作者 杨校礼 高季章 刘之平 《水力发电》 北大核心 2004年第5期18-20,27,共4页
结合西龙池抽水蓄能电站,对有加强肋板结构的三岔管内水流进行数值模拟及物理试验研究,采用SIMPERC方法求解三维紊流方程,选取不同的肋宽比进行数值模拟,得到分岔管水头损失系数随肋宽比变化的规律,较好地复演了三岔管管内水流的运动,... 结合西龙池抽水蓄能电站,对有加强肋板结构的三岔管内水流进行数值模拟及物理试验研究,采用SIMPERC方法求解三维紊流方程,选取不同的肋宽比进行数值模拟,得到分岔管水头损失系数随肋宽比变化的规律,较好地复演了三岔管管内水流的运动,能满足工程实际需要,并通过物理模型验证了所用数值方法的合理性和计算精度。 展开更多
关键词 岔管 肋宽比 数值模拟 西龙池抽水蓄能电站