Along the north bank of the Xuxi River, the sand-intercalated-muddy gravel layer from -3.7 - -5.8 m in the borehole 7508 at the East Dam and the middle, coarse and fine sand layer with a thickness of 4.5 m at the lowe...Along the north bank of the Xuxi River, the sand-intercalated-muddy gravel layer from -3.7 - -5.8 m in the borehole 7508 at the East Dam and the middle, coarse and fine sand layer with a thickness of 4.5 m at the lower part of the borehole 8179 between the East Dam and the West Dam indicate that a large natural river was here before the Kingdom of Wu excavated the Xuxi Canal. The existence of Neolithic sites such as Xuecheng, Chaoduntou and Xiajiadang along the Xuxi River and the silt layer with dozens of meters archived under the earth's surface within a range of 1 km along both banks are the even more important evidences for the existence of the ancient Zhongjiang River. The floodgate of the East Dam nowadays makes against the communication between the Shuiyangjiang River and the Taihu Lake. The authors suggest the canal between Wuhu and Taihu Lake should be excavated as soon as possible, namely, the navigation channel from Wuhu through Guchenghu Lake, Xuxi River, East Dam, Liyang, Yixing to Taihu Lake should be further widen and the deposits composed of slope wash on the watershed between Shuiyangjiang River and Taihu Lake should be dredged away. Then, the channel journey can be shortened, the boats in ship transportation on the Yangtze River can be shunted to ensure the security of shipping, the resources of sand and gravel in the old river channel can be exploited and the dike of the Yangtze River can be reinforced. So, the problems of irrigation, flood diversion, pollution abatement and drainage of flooded fields in the lower Yangtze River will be resolved. Then, the above methods can impel the sustainable development of the Xuxi River and Taihu Lake area.展开更多
Phosphorus is one of the most important nutrients required to support various kinds of biodegradation processes. As this particular nutrient is not included in the activated sludge model no. 1 (ASM1), this study ext...Phosphorus is one of the most important nutrients required to support various kinds of biodegradation processes. As this particular nutrient is not included in the activated sludge model no. 1 (ASM1), this study extended this model in order to determine the fate of phosphorus during the biodegradation processes. When some of the kinetics parameters are modified using observed data from the restoration project of the Xuxi River in Wuxi City, China, from August 25 to 31 in 2009, the extended model shows excellent results. In order to obtain optimum values of coefficients of nitrogen and phosphorus, the mass fraction method was used to ensure that the final results were reasonable and practically relevant. The temporal distribution of the data calculated with the extended ASM1 approximates that of the observed data.展开更多
基金N ationalN aturalScience Foundation ofChina,N o.40271103K ey Fundam entalA dvance Research Foundation ofN anjing U niversity Subject Construction of Physical G eography during "985" and Testing Fund of N anjingU niversity
文摘Along the north bank of the Xuxi River, the sand-intercalated-muddy gravel layer from -3.7 - -5.8 m in the borehole 7508 at the East Dam and the middle, coarse and fine sand layer with a thickness of 4.5 m at the lower part of the borehole 8179 between the East Dam and the West Dam indicate that a large natural river was here before the Kingdom of Wu excavated the Xuxi Canal. The existence of Neolithic sites such as Xuecheng, Chaoduntou and Xiajiadang along the Xuxi River and the silt layer with dozens of meters archived under the earth's surface within a range of 1 km along both banks are the even more important evidences for the existence of the ancient Zhongjiang River. The floodgate of the East Dam nowadays makes against the communication between the Shuiyangjiang River and the Taihu Lake. The authors suggest the canal between Wuhu and Taihu Lake should be excavated as soon as possible, namely, the navigation channel from Wuhu through Guchenghu Lake, Xuxi River, East Dam, Liyang, Yixing to Taihu Lake should be further widen and the deposits composed of slope wash on the watershed between Shuiyangjiang River and Taihu Lake should be dredged away. Then, the channel journey can be shortened, the boats in ship transportation on the Yangtze River can be shunted to ensure the security of shipping, the resources of sand and gravel in the old river channel can be exploited and the dike of the Yangtze River can be reinforced. So, the problems of irrigation, flood diversion, pollution abatement and drainage of flooded fields in the lower Yangtze River will be resolved. Then, the above methods can impel the sustainable development of the Xuxi River and Taihu Lake area.
文摘Phosphorus is one of the most important nutrients required to support various kinds of biodegradation processes. As this particular nutrient is not included in the activated sludge model no. 1 (ASM1), this study extended this model in order to determine the fate of phosphorus during the biodegradation processes. When some of the kinetics parameters are modified using observed data from the restoration project of the Xuxi River in Wuxi City, China, from August 25 to 31 in 2009, the extended model shows excellent results. In order to obtain optimum values of coefficients of nitrogen and phosphorus, the mass fraction method was used to ensure that the final results were reasonable and practically relevant. The temporal distribution of the data calculated with the extended ASM1 approximates that of the observed data.