Seismic responses of the Zipingpu concrete face rockfill dam were analyzed using the finite element method. The dynamic behavior of rockfill materials was modeled with a viscoelastic model and an empirical permanent s...Seismic responses of the Zipingpu concrete face rockfill dam were analyzed using the finite element method. The dynamic behavior of rockfill materials was modeled with a viscoelastic model and an empirical permanent strain model. The relevant parameters were obtained either by back analysis using the field observations or by reference to parameters of similar rockfill materials. The acceleration responses of the dam,the distribution of earthquake-induced settlement, and the gap propagation under the concrete slabs caused by the settlement of the dam were analyzed and compared with site investigations or relevant studies. The mechanism of failure of horizontal construction joints was also analyzed based on numerical results and site observations. Numerical results show that the input accelerations were considerably amplified near the top of the dam, and the strong shaking resulted in considerable settlement of the rockfill materials, with a maximum value exceeding 90 cm at the crest.As a result of the settlement of rockfill materials, the third-stage concrete slabs were separated from the cushion layer. The rotation of the cantilever slabs about the contacting regions, under the combined action of gravity and seismic inertial forces, led to the failure of the construction joints and tensile cracks appeared above the construction joints. The effectiveness and limitations of the so-called equivalent linear method are also discussed.展开更多
On May 12, 2008, a major earthquake measured 8 on the Richter scale jolted Wenchuan County in Si- chuan Province, China with the epicentral intensity of XI degrees. Zipingpu Dam is located 17.17 km from the epicenter ...On May 12, 2008, a major earthquake measured 8 on the Richter scale jolted Wenchuan County in Si- chuan Province, China with the epicentral intensity of XI degrees. Zipingpu Dam is located 17.17 km from the epicenter and the influence intensity at the damsite reached IX―X degrees. It is the first time in the world for such a high concrete-faced rockfill dam (CFRD) in China to experience such a strong earthquake occurring in such a short distance. Due to its location of special importance to the down- stream areas, the safety state and damaging condition of the Zipingpu Dam has attracted great atten- tions from various circles. Based on site investigation of the damages to the Zipingpu Dam and com- parison analysis of the observation data obtained before and after the earthquake, the paper makes a comprehensive assessment of the key technical issues relevant to this high CFRD, including its safety state and the high slope stability after the earthquake.展开更多
基金supported by the National Natural Science Foundation of China(Grants No.91215301 and 51309161)the Scientific Research Fund of the Nanjing Hydraulic Research Institute(Grants No.Y314011 and Y315005)
文摘Seismic responses of the Zipingpu concrete face rockfill dam were analyzed using the finite element method. The dynamic behavior of rockfill materials was modeled with a viscoelastic model and an empirical permanent strain model. The relevant parameters were obtained either by back analysis using the field observations or by reference to parameters of similar rockfill materials. The acceleration responses of the dam,the distribution of earthquake-induced settlement, and the gap propagation under the concrete slabs caused by the settlement of the dam were analyzed and compared with site investigations or relevant studies. The mechanism of failure of horizontal construction joints was also analyzed based on numerical results and site observations. Numerical results show that the input accelerations were considerably amplified near the top of the dam, and the strong shaking resulted in considerable settlement of the rockfill materials, with a maximum value exceeding 90 cm at the crest.As a result of the settlement of rockfill materials, the third-stage concrete slabs were separated from the cushion layer. The rotation of the cantilever slabs about the contacting regions, under the combined action of gravity and seismic inertial forces, led to the failure of the construction joints and tensile cracks appeared above the construction joints. The effectiveness and limitations of the so-called equivalent linear method are also discussed.
文摘On May 12, 2008, a major earthquake measured 8 on the Richter scale jolted Wenchuan County in Si- chuan Province, China with the epicentral intensity of XI degrees. Zipingpu Dam is located 17.17 km from the epicenter and the influence intensity at the damsite reached IX―X degrees. It is the first time in the world for such a high concrete-faced rockfill dam (CFRD) in China to experience such a strong earthquake occurring in such a short distance. Due to its location of special importance to the down- stream areas, the safety state and damaging condition of the Zipingpu Dam has attracted great atten- tions from various circles. Based on site investigation of the damages to the Zipingpu Dam and com- parison analysis of the observation data obtained before and after the earthquake, the paper makes a comprehensive assessment of the key technical issues relevant to this high CFRD, including its safety state and the high slope stability after the earthquake.