It was reported that the total installed capacity of photovoltaic power in China has reached 43.5 GW [1] at the end of 2015. With the vast territory and abundant solar energy resources in western part of China, more t...It was reported that the total installed capacity of photovoltaic power in China has reached 43.5 GW [1] at the end of 2015. With the vast territory and abundant solar energy resources in western part of China, more than 50 percent of photovoltaic power stations and wind farms were built there. In recent years, influenced by such factors as rapid growth in installed capacity of PV power stations and wind farms, power generation districts far away from power consumption load as well as its mismatch in transmission line, the phenomenon of abandoning solar and wind power has already restricted severely the normal operation of photovoltaic and wind power generation. It has greatly reduced the enthusiasm of the investors and constructors for investing and building power stations. This paper, based on the status in quo of power generation market and power supply in China, analyzes multi-aspect reasons for the phenomenon of abandoning solar and wind power and discusses their solutions.展开更多
在“碳达峰”与“碳中和”背景下,为提高能源的低碳化利用,提出一种基于阶梯式碳交易机制与细化电转气和碳循环的综合能源系统(integrated energy system,IES)低碳经济运行策略。首先考虑阶梯式碳交易机制,采用碳交易市场,利用区间数与...在“碳达峰”与“碳中和”背景下,为提高能源的低碳化利用,提出一种基于阶梯式碳交易机制与细化电转气和碳循环的综合能源系统(integrated energy system,IES)低碳经济运行策略。首先考虑阶梯式碳交易机制,采用碳交易市场,利用区间数与碳交易费用达到控制碳排放的目的;其次在细化电转气的基础上引入电解槽(eLectrolyzer,EL)、甲烷反应器(methane reactor,MR),并增设碳捕集装置(carbon capture system,CCS),实现碳的循环利用。最后构建以购能成本、阶梯式碳排放交易成本、弃风弃光成本、碳捕集成本最小为目标的IES优化调度模型,利用CPLEX建模优化引擎将原问题转化为混合整数线性问题对此模型进行求解,结果验证了所建模型的有效性。展开更多
文摘It was reported that the total installed capacity of photovoltaic power in China has reached 43.5 GW [1] at the end of 2015. With the vast territory and abundant solar energy resources in western part of China, more than 50 percent of photovoltaic power stations and wind farms were built there. In recent years, influenced by such factors as rapid growth in installed capacity of PV power stations and wind farms, power generation districts far away from power consumption load as well as its mismatch in transmission line, the phenomenon of abandoning solar and wind power has already restricted severely the normal operation of photovoltaic and wind power generation. It has greatly reduced the enthusiasm of the investors and constructors for investing and building power stations. This paper, based on the status in quo of power generation market and power supply in China, analyzes multi-aspect reasons for the phenomenon of abandoning solar and wind power and discusses their solutions.